ML18106A298

From kanterella
Revision as of 14:35, 25 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Rev 16 to Salem Generating Station UFSAR IAW Requirements of 10CFR50.71(e).Rev Contains Identified Text, Table & Figure Changes Required to Reflect Plant Configuration as of 970731
ML18106A298
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/1998
From: STORZ L F
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18106A299 List:
References
LR-N980049, NUDOCS 9802100046
Download: ML18106A298 (77)


Text

  • --Public Service Electric and Gas Company
  • Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President

-Muc!ear Operations United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

JAN 3 0 1998 LR-N980049 PSE&G CONTROL COPY # UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 16 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET 'NOS. 50-272 and 50-311 (Jj Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e).

Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal.

In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review. Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for months after the Salem Unit 1 refueling outages; however, this revision incorporates plant configuration changes resulting from the Unit 2 extended outage which ended in July, 1997 and to satisfy the 24 month maximum revision limit. Should there be any questions with regard to this submittal, please do not hesitate to contact us. Printedon Recycled Paper 9802100046 980130 PDR ADOCK 05000272 K PDR Sincerely, _,, [<; 111111111111111111111111111111111111\lll

  • * * * , , *
  • 1\\1

,---'.

  • Document Control Desk LR-N980049 Attachments:

-Affidavit

  • 2 -Summary of Salem UFSAR Revision 16 Changes -Salem UFSAR Revision No. 16 C Document Control Desk -Original & ten copies Mr. Hubert J. Miller, Administrator

-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager -Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans -Salem (X24) USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625 JAN 3O1998

  • Document Control Desk LR-N980049 3 /rbk BC (w/o attachments):

CNO & President

-Nuclear Business Unit (N09) Senior Vice President

-Nuclear Engineering (N19) Director -QA/NT/EP (120) Director -Licensing I Regulation and Fuels (N21) General Manager -Salem Operations (S05) Manager -Nuclear Review Board (N38) Manager -Joint Owners/Ext Aff Interface (N28) Licensing Operational Manager -Salem (N21) J. Keenan, Esq. (N21) (w/ attachments except Salem UFSAR Revision No. 16): Records Management Microfilm File Nos. 1.2.1, 2.1.3 95-4933

' *._.-* *

  • REF: LR-N980049 STATE OF NEW JERSEY SS. COUNTY OF SALEM L. F. Storz, being duly sworn, states that he is Senior Vice President

-Nuclear Operations of Public Service Electric and Gas CGmpany, that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certificatio11; and that in accordance with 10CFR50.71(e)(2), the information contained in the attached letter and Updated Final Safety Analysis Report accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement, and contains an identification of changes made under the provisions of 1 OCFRS0.59 but not previously submitted to the Commission.

Subjl:)ed and Sworn to before me this I a th day Of January, 1998 My Commission expires on April 21, 1998 KIMBERLY JO BROWN NOTARY PUBLIC OF NEW JERSEY My Commission Expires April 21, 1998 r'* . 01/31/98 -------.PUBLIC SERVICE ELECTRIC & S COMPANY DOCUMENT DISTRIBUTION NOTICE PAGE

... *...-.. ],. ;OF 1 i* TO: NUCLEAR REGULATORY COMMISSION DOCUMENT CONTROL DESK WASHINGTON, DC 20555 QQ26292 'ir0(f26292't1:

COPYHOLDER

SFSR0008

';' ' DESCRIPTION:

LEC/985 REV 16

  • r .. . . :. PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED
    • SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVEO.

CLASS PROC DOCUMENT ID SFSR-LOEP SHT/ VOL 000 INST REV STAT TYPE 016 A SFSR *-A; . -.,-,!'l.\" ... --ri?r *QQl : .J : . 1 ' ! ..: .. : *J THIS ACKNOWLEDGEMENT RECEIPT MUST BE RETURNED WITHIN 5 WQRKI.NG DAXS TO: PSE&G DMG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038 YOUR SIGNATURE BELOW VERIFIES THAT (1) THE ABOVE DOCUMENTS FIL.ED AND SUPERSEDED DOCUMENTS HAVE BEEN REMOVED AND DESTROYED OR AS OBSOLETE (2) THE MAILING ADDRESS AND COPYHOLDER INFORMATION OR CORRECTIONS HAVE BEEN IDENTIFIED ON THIS TRANSMITTAL.

_; -, SEE MY INSTRUCTIONS ABOVE CHANGE COPYHOLDER INFORMATION

*. REMOVE FROM DISTRIBUTION (DOCUMENTS MUST BE RETURNED)

COPYHOLDER SIGNATURE:

. !
  • i *i '* I * *
  • Public Service Electric and Gas Company
  • Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700

.* Senior Vice President

  • Nuclear Operations United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
  • Gentlemen:

JAN 30 1998 LR-N980049 PSE&G CONTROL COPY # 08 UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 16 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 and 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e).

  • Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal.

In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review. Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for six months after the Unit 1 refueling outages; however, this revision incorporates plant configuration resulting from the Unit 2 extended outage which ended in July, 1997 a_nd. to $atisfY* the 24 month maximum revision limit. -.. .: ** --. -. -. , .. * .. *-. Should

  • b_f:t with regard to this submittal, please do not hesitate to contact

-* "::-;;(*:

      • -_;;, *'!f l1>t.. Printed on Recycled Paper

-

  • ' 1 . i *1 -1 I -1 I I I *
  • Document Control Desk LR-N980049 Attachments: -Affidavit
  • 2 -Summary of Salem UFSAR Revision 16 Changes -Salem UFSAR Revision No. 16 C Document Control Desk -Original & ten copies Mr. Hubert J. Miller, Administrator

-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager -Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans -Salem (X24) USNRC Senior Resident Inspector Mr. K Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625 JAN 301998

  • *
  • REF: LR-N980049 SS. L. F. Storz, being duly sworn, states that he is Senior Vice President

-Nuclear Operations of Public Service Electric and Gas CGmpany, that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certification; and that in accordance with 10CFRS0.71 (e)(2), the information contained in the attached letter and Updated Final Safety Analysis Report accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement, and contains an identification of changes made under the provisions of 1 OCFRS0.59 but not ,previously submitted to the Commission. Sub.:JZ)ed and Sworn to before me this f:).._ th day of January, 1998 My Commission

_expires on* April 21, 1998 ' *? . *. . '. KIMBERLY NOTARY PUBLIC OF-NEW.*JERSEV My Commission*

Expires April 21, 1 998 j J i ' *1 * *

  • Document Control Desk LR-N980049 3 /rbk BC (w/o attachments):

CNO & President

-Nuclear Business Unit (N09) Senior Vice President

-Nuclear Engineering (N19) Director -QA/NT/EP (120) Director -Licensing I Regulation and Fuels (N21) General Manager -Salem Operations (SOS) Manager -Nuclear Review Board (N38) Manager -Joint Owners/Ext Aff Interface (N28) Licensing Operational Manager -Salem (N21) J. Keenan, Esq. (N21) (w/ attachments except Salem UFSAR Revision No. 16): Records Management Microfilm File Nos. 1.2.1, 2.1.3 95-4933

  • . *
  • INSERTION INSTRUCTIONS The following instructions are for the insertion of Revision 16 into the Salem Generating Station Updated Final Safety Analysis Report. Remove pages, tables, and/or figures listed in the REMOVE column and replace them with the pages, tables, and/or figures listed in the INSERT column. Dashes (---) in either column indicate no action required.

Vertical bars have been placed in the margins of inserted pages and tables to indicate revision locations.

II-1 SGS-UFSAR Revision 16 January 31, 1998

'

  • REMOVE List of Current Pages All Sheets 1.1-1/1.1-2
1. 6-lb/l. 6-2 1. 6-3/1. 6-4 1. 6-5/1. 6-6 2-iii/2-iv 2-vii/2-viii 2.2-9/2.2-10 2.2-12a/2.2-12b 2.2-15 T 2.2-2 Sh 1 Sh 2 T 2.2-3 T 2.2-4 Sh 1 Sh 2 2.3-11/2.3-12 2.3-13/2.3-14 2.3-15 2.4-5/2.4-6 3-i/3-ii 3-vii/3-viii 3-xi/3-xii 3-xxi 3.1-3/3.1-4 3.1-9/3.1-10 3.4-5/3.4-6 3.5-3/3.5-4 3.5-5/3.5-6 3.5-11/3.5-12 3.5-13/3.5-14 SGS-UFSAR
  • .INSERTION INSTRUCTIONS VOLUME 1 II-2 INSERT List of Current Pages All Sheets 1.1-1/1.1-2
1. 6-lb/l. 6-2 i. 6-3 / i. 6-4 1. 6-5/1. 6-6 2-iii/2-iv 2-vii/2-viii 2.2-9/2.2-10 2.2-12a/2.2-12b 2.2-15 T 2.2-2 Sh 1 Sh 2 T 2.2-3 T 2.2-4 Sh 1 Sh 2 2.3-11/2.3-12 2.3-13/2.3-14 2.3-14a/2.3.:..14b 2.3-15 T 2.3-21 T 2.3-22 2.4-5/2.4-6 3-i/3-ii 3-vii/3-viii 3-xi/3-xii 3-xxi 3.1-3/3.1-4 3.1-9/3.1-10 3.4-5/3.4-6 3.5-3/3.5-4 3.5-5/3.5-6 3.5-11/3.5-12 3.5-13/3.5-14 Revision 16 January 31, 1998 REMOVE 3.5-15/3.5-16 3.5-17/3.5-18 3.5-19/3.5-20 3.5-21/3.5-22 T 3.5-1 T3.5-2 T 3.5-3 F 3.5-7 3.6-9/3.6-9a 3.6-11/3.6-12 3.6-17/3.6-18 3.6-19/3.6-20 3.6-21/3.6-22 3.6-23/3.6-24 3.6-25/3.6-26 3.6-27/3.6-28 3.6-29/3.6-30 3.6-35/3.6-36 3.6-36a/3.6-36b 3.6-39/3.6-40 3.6-41/3.6-42 3.6-43/3.6-44 3.6-55 T 3.6-2 F 3.6-10 F 3.6-28 3.7-5/3.7-6 3.7-29/3.7-30 3.8-1/3.8-2 3.8-29/3.8-30 3.8-65/3.8-66 3.8-75/3.8-76 3.8-77/3.8-77a 3.8-77b/3.8-78 SGS-UFSAR
  • INSERTION INSTRUCTIONS VOLUME 2 II-3 INSERT-3.5-15/3.5-16
3. 5"."'17 /3. 5-18 3.5-19/3.5-20 3.5-21/3.5-21a 3.5-2lb/3.5-21c 3.5-2ld/3.5-22 T 3.5-1 T 3.5-2 T 3.5-3 F 3.5-6A F 3.5-7 3.6-9/3.6-9a 3.6-11/3.6-12 3.6-17/3.6-18 3.6-19/3.6-20 3.6-21/3.6,-21a 3.6-21b/3.6-22 3.6-23/3.6-24 3.6-25/3.6-26 3.6-27/3.6-28 3.6-29/3.6,...30 3.6-35/3.6-36 3.6-39/3.6-40 3.6-41/3.6-42 3.6-43/3.6-44 3.6-55 T 3.6-2 F 3.6-10 F 3.6-28 3.7-5/3.7-6 3.7-29/3.7-30 3.8-1/3.8-2 3.8-29/3.8-30 3.8-65/3.8-66 3.8-75/3.8-76 3.8-77/3.8-78 Revision 16 January 31, 1998 REMOVE 3.8-79/3.8-80 3.8-81/3.8-82 F 3.8-36 3A-5/3A-6 3A-7b/3A-8 3A-9/3A-10 3A-15/3A-16 3A-23/3A-23a 3A-25/3A-26 3A-37/3A-38 3A-39/3A-40 3A-45/3A-46 3A-47/3A-48 3A-49/3A-50 3A-51/3A-5la 3A-5lb/3A-52 3A-53/3A-54 3A-55 F 3A-3 F 3A-4 T 4.1-1 Sh 1 4.2-53/4.2-54 4.2-55/4.2-56 4.2-79/4.2-80 4.3-23/4.3-24 4.5-2K/4.5-2L 5.1-7/5.1-8 F 5.l-6A Sh 1 Sh 2 F 5.l-6B Sh 1 Sh 3 5.2-13/5.2-14 5.2-15/5.2-16 5.2-63/5.2-64 SGS-UFSAR
  • INSERTION INSTRUCTIONS VOLUME 3 II-4 INSERT 3.8-79/3.8-79a 3.8-79b/3.8-80 3.8-81/3.8-82 F 3.8-36 3A-5/3A-6 3A-7b/3A-8 3A-9/3A-10 3A-15/3A-16 3A-23/3A-23a 3A-25/3A-26 3A-37/3A-38 3A-39/3A-40 3A-45/3A-46 3A-47/3A-48 3A-49/3A-50 3A-51/3A-5la 3A-5lb/3A-52 3A-53/3A-54 3A-55 F 3A-3 F 3A-4 T 4.1-1 Sh 1 4.2-53/4.2-54 4.2-55/4.2-56 4.2-79/4.2-80 4.3-23/4.3-24 4.5-2K/4.5-2L 5.1-7/5.1-8 F 5.1-6A Sh 1 Sh 2 F 5.l-6B Sh 1 Sh 3 5.2-13/5.2-14 5.2-15/5.2-16 5.2-63/5.2-64 Revision 16 January 31, 1998 REMOVE 5.2-69/5.2-70 5.2-71/5.2-72 5.2-73/5.2-74 T 5.2-3 Sh 2 T 5.2-4 T 5.2-9B 5.3-1/5.3-2 5.4-13/5.4-14 5.5-5/5.5-6 5.5-11/5.5-12 5.5-43/5.5-44 T 5.5-2 Sh 1 Sh 2 F 5.5-2A Sh 1 Sh 2 F 5.5-2B Sh 1 Sh 2 5.6-1/5.6-la 5.6-3/5.6-4 5.6-5/5.6-6 6-iii/6-iv 6-v/6-vi 6-vii/6-viii 6.2-9/6.2-10 6.2-11/6.2-12 6.2-15/6.2-16 6.2-21/6.2-22 6.2-23/6.2-24 6.2-31/6.2-32 6.2-33/6.2-34 6.2-37/6.2-38 6.2-43/6.2-44 6.2-51/6.2-52 6.2-53/6.2-54 6.2-55/6.2-56 6.2-57/6.2-58 6.2-59/6.2-60 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-5 INSERT 5.2-69/5.2-70 5.2-71/5.2-72 5.2-73/5.2-74 T 5.2-3 Sh 2 T 5.2-4 T 5.2-9B 5.3-1/5.3-2 5.4-13/5.4-14 5.5-5/5.5-6 5.5-11/5.5-12 5.5-43/5.5-44 T 5.5-2 Sh 1 Sh 2 F 5.5-2A Sh 1 Sh 2 F 5.5-2B Sh 1 Sh 2 5.6-1/5.6-la 5.6-3/5.6-4 5.6-5/5.6-6 6-iii/6-iv 6-v/6-vi 6-vii/6-viii 6.2-9/6.2-10 6.2-11/6.2-12 6.2-15/6.2-16 6.2-21/6.2-22 6.2-23/6.2-24 6.2-31/6.2-32 6.2-33/6.2-34 6.2-37/6.2-38 6.2-43/6.2-44 6.2-51/6.2-52 6.2-53/6.2-54 6.2-55/6.2-56 6.2-57/6.2-58 6.2-59/6.2-59a Revision 16 January 31, 1998 REMOVE 6.2-61/6.2-62 6.2-65/6.2-66 6.2-67/6.2-68 6.2-85 T 6.2-6 T 6.2-9 T 6.2-10 Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 Sh 7 Sh 8 Sh 9 Sh 10 Sh 11 Sh 12 *T 6.2-11 T 6.2-12 Sh 1 Sh 2 Sh 3 T 6.2-13 Sh 1 Sh 2 F 6.2.4B F 6.2-16 F 6.2-18 F 6.2-19 F 6.2-21 F 6.2-22 F 6.2-23 F 6.2-24 F 6.2-29 F 6.2-30 F 6.2-31 F 6.2-32 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-6 INSERT 6.2-59b/6.2-60 6.2-61/6.2-62 6.2-65/6.2-66 6.2-67/6.2-68 6.2-85 T 6.2-6 T 6.2-9 T 6.2-10 Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 Sh 7 Sh 8 Sh 9 Sh 10 Sh 11 Sh 12 T 6.2-11 T 6.2-12 Sh 1 Sh 2 Sh 3 T 6.2-13 Sh 1 Sh 2 Sh 3 Sh 4 F 6.2.4B F 6.2-16 F 6.2-18 F 6.2-19 F 6.2-21 F 6.2-22 F 6.2-23 F 6.2-24 F 6.2-29. F 6.2-30. F 6.2-31 F 6.2-32 Revision 16 January 31, 1998 REMOVE F 6.2-33 F 6.2-34 F 6.2-39 F 6.2-40 F 6.2-41 F 6.2-42 F 6.2-43 F 6.2-45C F 6.2-450 6.3-5/6.3-6

.6.3-9/6.3-10 6.3-13/6.3-14 6.3-15/6.3-16 6.3-21/6.3-22 6.3-31/6.3-32 6.3-33b/6.3-34 6.3-35/6.3-36 ) 6.3-37/6.3-38 6.3-41/6.3-42 6.3-43/6.3-44 6.3-49/6.3-50 6.3-53/6.3-54 6.3-61/6.3-62 6.3-63/6.3-64 T 6.3-4 T 6.3-5 T 6.3-6 Sh 1 Sh 2 Sh 3 T 6.3-7 T 6.3-8 Sh 1 Sh 2 T 6.3-12 T 6.3-13 Sh 1 Sh 2 SGS-UFSAR

  • ** INSERTION INSTRUCTIONS II-7 INSERT F 6.2-33 F 6.2-34 F 6.2-39 F 6.2-40 F 6.2-41 F 6.2-42 F 6.2-43* F 6.2-45C F 6.2-450 6.3-5/6.3-6 6.3-9/6.3-10 6.3-13/6.3-14

6.3-15/6.3-16 6.3-21/6.3-22 6.3-31/6.3-32 6.3-33b/6.3-34 6.3-35/6.3-36 6.3-36a/6.3-36b 6.3-36c/6.3-36d 6.3-37/6.3-38 6.3-41/6.3-42 6.3-43/6.3-44 6.3-49/6.3-50 6.3-53/6.3-54 6.3-61/6.3-62 T 6.3-4 T 6.3-5 T 6.3-6 Sh 1 Sh 2 Sh 3 T 6.3-7 T 6.3-8 Sh 1 T 6.3-12 T 6.3-13 Sh 1 Sh 2 Revision 16 January 31, 1998 Remove F 6.3-lA Sh 1

  • Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2 Sh 3 Sh 4 6.4-1/6.4-2 6.4-3/6.4-4 6.4-5 T 6.4-2 Sh 1
  • Sh 2 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-lla 7.l-llb/7.1-12 7.1-13/7.1-14
7. 2-11/7. 2-12 7.2-23/7.2-24 7.2-31/7.2-32 7.2-37/7.2-38 T 7.2-1 Sh 2 Sh 5 F 7.2-5 7.3-5/7.3-6 7.3-7/7.3-8 7.3-19/7.3-20 7.3-27/7.3-28
  • T 7.3-2 7.3-29/7.3-30 SGS-UFSAR
  • INSERTION INSTRUCTIONS
  • In _ VOLUME 4 II-8 F 6.3-lA Sh 1 Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2 Sh 3 Sh 4 6.4-1/6.4-la 6.4-lb/6.4-lc 6.4-ld/6.4-2 6.4-3/6.4-4 6.4-4a/6.4-4b 6.4-5 T 6.4-2 Sh 1 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-12 7.1-13/7.1-14 7.2-11/7.2-12 7.2-23/7.2-24

7.2-31/7.2-32

7.2-37/7.2-38 T 7.2-1 Sh 2 Sh 5 F 7.2-5 7.3-3/7.3-4 7.3-5/7.3-6 7.3-7/7.3-8 7.3-19/7.3-20 7.3-27/7.3-28 T 7.3-2 7.3-29/7.3-30 Revision 16 Januarv 31. 1998

  • INSERTION INSTRUCTIONS REMOVE INSERT T 7.3-3 T 7.3-3 Sh 1 Sh 1 Sh 2 Sh 2 T 7.3-4 T 7.3-4 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 Sh 7 Sh 7 Sh 8 Sh 8 Sh 9 Sh 9 Sh 10 Sh 10 Sh 12 Sh 12 Sh 13 Sh 13 Sh 13a Sh 14 Sh 14 Sh 15 Sh 15 Sh 16 Sh 16 Sh 17 Sh 17 Sh 23 Sh 23 Sh 24 Sh 24 Sh 25 Sh 25 Sh 26 Sh 26 Sh 27 Sh 27 Sh 28 Sh 28 Sh 29 Sh 29 Sh 30 Sh 30 Sh 31 Sh 31 Sh 32 Sh 32 Sh 33 Sh 33 Sh 34 Sh 34 Sh 35 Sh 35 Sh 36 Sh 36 Sh 37 Sh 37 Sh 38 Sh 38 Sh 39 Sh 39 Sh 40 sh 40 Sh 41 Sh 41 Sh 42 Sh 42 Sh 43 Sh 43 II-9 SGS-UFSAR Revision 16 January 31, 1998 REMOVE Sh 44 Sh 45 Sh 46 Sh 47 T 7.3-5 Sh 1 Sh 3 Sh 5 Sh 6 Sh 7 Sh 9 Sh 13 Sh 15 T 7.3-6 Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 Sh 7 Sh 8 Sh 9 Sh 10 Sh 13 Sh 14 T 7.3-7 Sh 1 Sh 2 F 7.3-4 7.5-1/7.5-2 7.5-3/7.5-4 T 7.5-1 Sh 4 T 7.5-2 Sh 8 T 7.5-3 T 7.5-4 Sh 2 Sh 4 Sh 5 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-10 INSERT Sh 44 Sh 45 Sh 46 Sh 47 T 7.3-5 Sh 1 Sh 3 Sh 5 Sh 6 Sh 7 Sh 9 Sh 13 Sh 15 T 7.3-6 Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 Sh 7 Sh 8 Sh 9 Sh 10 Sh 13 Sh 14 T 7.3-7 Sh 1 Sh 2 F 7.3-4 7.5-1/7.5-2 7.5-3/7.5-4 T 7.5-1 Sh 4 T 7.5-2 Sh 8 T 7.5-3 T 7.5-4 Sh 2 Sh 4 Sh 5 Revision 16 January 31, 1998 REMOVE T 7.5-5 Sh 2 Sh 3 7.6-5/7.6-6 7.6-7/7.6-8 7.7-3/7.7-4 7.7-5/7.7-6 7.7-7/7.7-8 7.7-13/7.7-14 7.7-17/7.7-17a 7.7-21/7.7-21a 7.7-27/7.7-28 F 7.7-2 7A-3/7A-4 7A-5/7A-6 8-i/8-ii 8-iii 8-iv 8.1-3/8.1-4 8.1-7/8.1-8 8.1-9/8.1-10 8.1-11/8.1-12 8.3-1/8.3-2 8.3-3/8.3-4 8.3-5b/8.3-6 8.3-6a/8.3-6b 8.3-9/8.3-10 8.3-13/8.3-14

8.3-17/8.3-18 8.3-19/8.3-20 T 8.3-5 T 8.3-6 F 8.3-2 F 8.3-3A F 8.3-38 F 8.3-4 F 8.3-4A F 8.3-48 SGS-UFSAR

  • INSERTION INSTRUCTIONS II-11 INSERT T 7.5-5 Sh 2 Sh 3 7.6-5/7.6-6 7.6-7/7.6-8 7.7-3/7.7-4 7.7-5/7.7-6 7.7-7/7.7-8 7.7-13/7.7-14 7.7-17/7.7-17a 7.7-21/7.7-21a 7.7-27/7.7-28 F 7.7-2 7A-3/7A-4 7A-5/7A-6 8-i/8-ii 8-iii 8-iv 8.1-3/8.1-4 8.1-7/8.1-8 8.1-9/8.1-10 8.1-11/8.1-lla 8.1-llb/8.1-12 8.3-1/8.3-2 8.3-3/8.3-4 8.3-5b/8.3-6 8.3-9/8.3-10 8.3-13/8.3-14 8.3-17/8.3-18 8.3-19/8.3-20 T 8.3-5 T 8.3-6 F 8.3-2 F 8.3-3A F 8.3-38 F 8.3-4 F 8.3-4A F 8.3-48 Revision 16 January 31, 1998 ' : .. j' I* I REMOVE F 8.3-5 Sh 1 Sh 2 F 8.3-6 Sh 2 9-v/9-vi 9-xib/9-xii 9.l-3b/9.1-4 9.1-13/9.1-14 9.1-15/9.1-16 9.1-29/9.1-30 9.1-31/9.1-32 9.1-33/9.1-34 T 9.1-2 Sh 1 F 9.1-1 F 9.1-4A F 9.1-48 9.2-1/9.2-2 9.2-3/9.2-4 9.2-6a/9.2-6b 9.2-9/9.2-9a 9.2-9b/9.2-10 9.2-13/9.2-14 9.2-21/9.2-22 T 9.2-1 T 9.2-3 T 9.2-4 Sh 1 F 9.2-lA Sh 1 Sh 2 Sh 4 Sh 5 Sh 6 F 9.2-18 Sh 1 Sh 2 Sh 3 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-12 INSERT F 8.3-5 Sh 1 Sh 2 F 8.3-6 Sh 2 9-v/9-vi 9-xib/9-xii 9.l-3b/9.l-4 9.1-13/9.1-14 9.1-15/9.1-16 9.1-29/9.1-30 9.1-31/9.1-32 9.1-33/9.1-34 T 9.1-2 Sh 1 F 9.1-1 F 9.l-4A F 9.1-48 9.2-1/9.2-2 9.2-3/9.2-4 9.2-6a/9.2-6b 9.2-9/9.2-9a 9.2-9b/9.2-10 9.2-13/9.2-14 9.2-21/9.2-22 T 9.2-1 T 9.2-3 T 9.2-4 Sh 1 F 9.2-lA Sh 1 Sh 2 Sh 4 Sh 5 Sh 6 F 9.2-18 . Sh 1 Sh 2 Sh 3 Revision 16 January 31, 1998 '.:, .... *.*

REMOVE Sh 4 Sh 5 Sh 6 F 9.2-2B F 9.2-4A Sh 1 Sh 2 Sh 3 F 9.2-4B Sh 1 Sh 2 Sh 3 F 9.2-11 Sh 5 Sh 6 Sh 7 9.3-1/9.3-2 9.3-31/9.3-32 9.3-33/9.3-34 9.3-47/9.3-48 9.3-59/9.3-60 9.3-61/9.3-62 9.3-63 T 9.3-4 T 9.3-6 Sh 12 F 9.3-lA Sh 1 Sh 2 Sh 3 Sh 4 F 9.3-lB Sh 1 Sh 2 F 9.3-2A Sh 1 Sh 2 Sh 3 SGS-UFSAR

  • INSERTION INSTRUCTIONS VOLUME 5 II-13 INSERT Sh 4 Sh 5 Sh 6 F 9.2-2B F 9.2-4A Sh 1 Sh 2 Sh 3 F 9.2-4B Sh 1 Sh 2 Sh 3 F 9.2-11 Sh 5 Sh 6 Sh 7 9.3-1/9.3-2 9.3-31/9.3-32 9.3-33/9.3-34 9.3-47/9.3-48 9.3-59/9.3-60 9.3-61/9.3-62 9.3-63 T 9.3-4 T 9.3-6 Sh 12 F 9.3-lA Sh 1 Sh 2 Sh 3 Sh 4 F 9.3-lB Sh 1 Sh 2 F 9.3-2A Sh 1 Sh 2 Sh 3 Revision 16 January 31, 1998 REMOVE F 9.3-2B Sh 1 Sh 2 Sh 3 F 9.3-2C F 9.3-3A Sh 2 F 9.3-3B Sh 1 Sh 3 F 9.3-4A Sh 1 F 9.3-4B Sh 1 Sh 3 F 9.3-5A Sh 1 Sh 2 F 9.3-5b Sh 1 F 9.3-6A Sh 1 Sh 2 F 9.3-6B Sh 1 Sh 2 Sh 3 F 9.3-7A Sh 1 Sh 2 F 9.3-7B Sh 1 Sh 2 Sh 3 F 9.3-SB 9.4-1/9.4-la 9.4-lb/9.4-2 9.4-3/9.4-4 9.4-5/9.4-6 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-14 INSERT F 9.3-2B Sh 1 Sh 2 Sh 3 F 9.3-2C F 9.3-3A Sh 2 F 9.3-3B Sh 1 Sh 3 F 9.3-4A Sh 1 F 9.3-4B Sh 1 Sh 3 F 9.3-5A Sh 1 Sh 2 F 9.3-5b Sh 1 F 9.3-6A Sh 1 Sh 2 F 9.3-6B Sh 1 Sh 2 Sh 3 F 9.3-7A Sh 1 Sh 2 F 9.3-7B Sh 1 Sh 2 Sh 3 F 9.3-BB 9.4-1/9.4-la 9.4-lb/9.4-2 9.4-3/9.4-4 9.4-4a/9.4-4b 9.4-4c/9.4-4d 9.4-4e/9.4-4f 9.4-5/9.4-6 Revision 16 January 31, 1998 REMOVE 9.4-7/9.4-8 9.4-9/9.4-10 9.4-11/9.4-12 9.4-15/9.4-16 9.4-17/9.4-18 9.4-19/9.4-20 9.4-25/9.4-26 9.4-27/9.4-28 9.4-29/9.4-30 9.4-33/9.4-34 9.4-35/9.4-36 9.4-39/9.4-39a 9.4-41/9.4-42 9.4-43/9.4-44 9.4-45/9.4-46 F 9.4-lA F 9.4-lB F 9.4-2A Sh 1 F 9.4-2B Sh 1 Sh 2 Sh 3 F 9.4-3B F 9.4-4A Sh 2 F 9.4-4B Sh 1 Sh 2 F 9.4-6A F 9.4-6B 9.5-3/9.5-4 9.5-21/9.5-22
9. 5-37 /9. 5-3.8 9.5-39/9.5-40 9.5-41/9.5-42 9.5-43/9.5-44 9.5-45/9.5-46 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-15 .INSERT 9.4-7/9.4-8 9.4-8a/9.4-8b 9.4-9/9.4-10 9.4-11/9.4-12 9.4-13/9.4-14 9.4-15/9.4-16 9.4-17/9.4-18 9.4-19/9.4-20 9.4-25/9.4-26 9.4-27/9.4-28 9.4-29/9.4-30 9.4-33/9.4-34 9.4-35/9.4-36 9.4-37/9.4-38 9.4-39/9.4-39a 9.4-41/9.4-42 9.4-43/9.4-44 9.4-45/9.4-46 F 9.4-lA F 9.4-lB F 9.4-2A Sh 1 F 9.4-2B Sh 1 Sh 2 Sh 3 F 9.4-3B F 9.4-4A Sh 2 F 9.4-4B Sh 1 Sh 2 F 9.4-6A F 9.4-6B 9.5-3/9.5-4 9.5-21/9.5-22 9.5-37/9.5-38 9.5-39/9.5-40 9.5-41/9.5-42 9.5-43/9.5-44 9.5-45/9.5-46 Revision 16 January 31, 1998 REMOVE F 9.5-2 Sh 1 Sh 2 Sh 3 10-i/10-ii 10-iii/10-iv 10.2-1/10.2-2 10.2-5/10.2-6 10.2-11/10.2-12 F 10.2-1 Sh 1 Sh 2 Sh 3 F 10.2-2A Sh 2 Sh 3 F 10.2-2B Sh 1 Sh 2 Sh 3 F 10.2-3 Sh 1 Sh 2 F 10.2-4 Sh 2 10.3-1/10.3-2 10.3-3/10.3-4 10.3-5/10.3-6 10.3-7/10.3-8 10.3-9/10.3-10
10. 3-11/10. 3-12 10.3-15/10.3-16 F 10.3-lA Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-16 INSERT F 9.5-2 Sh 1 Sh 2 Sh 3 10-i/10-ii 10-iii/10-iv 10.2-1/10.2-2 10.2-5/10.2-6 10.2-11/10.2-12 F 10.2-1 Sh 1 Sh 2 Sh 3 F 10.2-2A Sh 2 Sh 3 F 10.2-2B Sh 1 Sh 2 Sh 3 F 10.2-3 Sh 1 Sh 2 F 10.2-4 Sh 2 10.3-1/10.3-2 10.3-3/10.3-4 10.3-5/10.3-6 10.3-7/10.3-8 10.3-9/10.3-10 10.3-11/10.3-12 10.3-15/10.3-16 F 10.3-lA Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 Revision 16 January 31, 1998 REMOVE F 10.3-lB Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 F 10.3-3 Sh 1 Sh 2 10.4-1/10.4-2 10.4-3/10.4-4 10.4-5/10.4-6 10.4-7/10.4-8 10.4-8a/10.4-8b 10.4-9/10.4-10 10.4-13/10.4-13a 10.4-13b/10.4-14 10.4-17/10.4-18 10.4-27 T 10.4-2A T 10.4-2B F 10.4-3A Sh 1 Sh 2 Sh 3 Sh 4 F 10.4-3B Sh 1 Sh 2 Sh 3 F 10.4-5A Sh 2 Sh 3 F 10.4-5B Sh 1 Sh 2 Sh 3 SGS-UFSAR
  • INSERTION INSTRUCTIONS VOLUME 6 II-17 INSERT F 10.3-lB Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 F 10.3-3 Sh 1 Sh 2 10.4-1/10.4-2 10.4-3/10.4-4 10.4-5/10.4-6 10.4-7/10.4-8 10.4-9/10.4-10 10.4-13/10.4-14 10.4-17/10.4-18 10.4-27 T 10.4-2 F 10.4-3A Sh 1 Sh 2 Sh 3 Sh 4 F 10.4-3B Sh 1 Sh 2 Sh 3 F 10.4-5A Sh 2 Sh 3 F 10.4-5B Sh 1 Sh 2 Sh 3 Revision 16 January 31, 1998 REMOVE F 10.4-6A Sh 1 Sh 2 Sh 5 F 10.4-6B Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 F 10.4-17A F 10.4-17B F 10.4-18A Sh 1 Sh 2 F 10.4-18B Sh 1 Sh 2 11-i/11-ii 11-iii/11-iv 11.1-1/11.1-2 11.1-3/11.1-4 11.1-5/11.1-6 1i.1-9/1i.1-10 11.1-11 T 11.1-1 T 11.1-2 T 11.1-3 T 11.1-4 T 11.1-5 T 11.1-6 T 11.1-7 Sh 1 Sh 2 T 11.1-8 T 11.1-11 T 11.1-12 T 11.1-13 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-18 INSERT F 10.4-6A Sh 1 Sh 2 Sh. 5 F 10.4-6B Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 F l0.4-17A F 10.4-17B F 10.4-18A Sh 1 Sh 2 F 10.4-18B Sh 1 Sh 2 11-i/11-ii 11-iii/11-iv 11.1-1/11.1-2 11.1-3/11.1-4 11.1-5/11.1-6 11.1-9/11.1-10 11.1-11 T 11.1-1 T 11.1-2 T 11.1-3 T 11.1-4 T 11.1-5 T 11.1-6 T 11.1-7 Sh 1 Sh 2 T 11.1-8 T 11.1-11 T 11.1-12 T 11.1-13 Revision 16 January 31, 1998 REMOVE F 11.2-lA Sh 1 Sh 2 Sh 3 F 11.2-lB Sh 1 Sh 2 Sh 3 F 11.3-lA Sh 1 Sh 3 F 11.3-lB Sh 1 Sh 2 Sh 3 11. 4-3/11. 4-4 11. 4-5/11. 4-5a 1i. 4-7/11. 4-8 11.4-9/11.

4-10 11. 4-11/11. 4-12 11.4-15/11.4-16

11. 4-17 /11. 4-18 11. 4-19 /11. 4-20 11.4-23 T 11. 4-1 Sh 1 T 11.4-2 Sh 1 Sh 2 Sh 3 T 11.4-3 Sh 1 T 11. 4-4 Sh 1 F 11.4-1 F 11.4-3 F 11.4-6 11. 6-1/11. 6-2 11. 6-3/11. 6-4 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-19 INSERT F 11.2-lA Sh 1 Sh 2 Sh 3 F 11.2-lB Sh 1 Sh 2 Sh 3 F 11.3-lA Sh 1 Sh 3 F 11.3-lB Sh 1 Sh 2 Sh 3 11. 4-3/11. 4-4 11. 4-5/11. 4-5a 11. 4-7 /11. 4-8 11.4-9/11.4-10
11. 4-11/11. 4-12 11. 4-15/11. 4-16 11. 4-17 /11. 4-18 11. 4-19 /11. 4-20 11.4-23 T 11.4-1 Sh 1 T 11.4-2 Sh 1 Sh 2 Sh 3 Sh 4 T 11.4-3 Sh 1 T 11.4-4 Sh 1 F 11.4-1 F 11.4-3 F 11.4-6 F 11.4-9 11. 6-1/11. 6-2 Revision 16 January 31, 1998 REMOVE 12-i/12-ii 12-iii/12-iv 12.1-9/12.1-10 12.1-11/12.1-12 12.1-13/12.1-14 12.3-1/12.3-2 12.3-3/12.3-3a 12.3-3d/12.3-4 12.4-1/12.4-2 13-i/13-ii 13.1-1/13.1-la 13.1-lb/13.1-2 13.1-2a/13.1-2b 13.1-3/13.1-3a 13.1-3b/13.1-4 13.1-5/13.1-6 13.1-6a/13.1-6b 13.1-7/13.1-8 13.1-8a/13.1-8b 13.1-9/13.1-10 13.1-11/13.1-12 13.1-13/13.1-14 13.1-15/13.1-16 13.1-17/13.1-18 13.1-18a/13.1-18b T 13.1-1 Sh 1 Sh 2 F 13.1-2 F 13.1-3 F 13.1-5 F 13.1-5a F 13.1-6 F 13.1-7 F 13.1-8a F 13.1-8b F 13.1-Se 13.2-1 13.4-1/13.4-2 13.5-1/13.5-2 13.5-2a/13.5-2b SGS-UFSAR
  • * .INSERTION INSTRUCTIONS II-20 INSERT 12-i/12-ii 12-iii 12.1-9/12.1-10 12.1-11/12.1-12 12.1-13/12.1-14 12.3-1/12.3-2 12.3-3/12.3-3a 12.3-3d/12.3-4 13-i/13-ii 13.1-1/13.1-la 13.1-lb/13.1-2 13.1-2a/13.1-2b 13.1-3/13.1-3a 13.1-3b/13.1-4 13.1-5/13.1-6 13.1-6a/13.l-6b 13.1-7/13.1-8 13.1-Ba/13.l-Bb 13.1-9/13.1-10 13.1-11/13.1-12 13.1-13/13.1-14

13.1-15/13.1-16 13.1-17/13.1-18 13.1-18a/13.1-18b T 13.1-1 Sh 1 F 13.1-2 F 13.1-3 F 13.1-5 F 1.3. l-5a F 13.1-6 F 13.1-7 F 13.1-8a F 13.1-Bb F 13.1-Be 13.2-1/13.2-2 13.4-1 13.5-1/13.5-2 13.5-2a/13.5-2b Revision 16 January 31, 1998

  • *
  • Remove
  • 13.5-2c/13.5-2d T 14.2-1 Sh 6 15-v/15-vi 15-vii/15-viia 15-ix/15-x 15-xi/15-xii 15-xiii/15-xiiia 15-xxiii/15-xxiiia 15-xxv/15-xxvi 15.1-1/15.1-2 15.1-11/15.1-12 15.l-12a/15.l-12b 15.1-13/15.1-14 15.1-23/15.1-24 T 15.1-2 Sh 2 T 15.1-5 T 15.1-6 15.2-1/15.2-2 15.2-5b/15.2-6 15.2-7/15.2-8 15.2:-13/15.2-14 15.2-31/15.2-32 15.2-37/15.2-38 15.2-41/15.2-42 15.2-59/15.2-60 15.2-60a/15.2-60b
15. 2-61/15. 2-62t':

T 15.2-1 Sh. 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 Sh 7 SGS-UFSAR INSERTION INSTRUCTIONS

  • In t VOLUME 7 II-21 13.5-2c/13.5-2d T 14.2-1 Sh 6 15-v/15-vi 15-vii/15-viia 15-ix/15-x 15-xi/15-xii 15-xiii/15-xiiia 15-xxiii/15-xxiiia 15-xxv/15-xxvi 15.1-1/15.1-2 15 .1-11/15 .1-12 15.1-13/15.1-14 15.1-23/15.1-24 T 15.1-2 Sh 2 T 15.1-5 T 15.1-6 15.2-1/15.2-2 15.2-5b/15.2-6 15.2-7/15.2-8 15.2-13/15.2-14 15.2-31/15.2-32 15.2-37/15.2-38 15.2-41/15.2-42 15.2-59/15.2-60 15.2-60a/15.2-60b 15.2-61/15.2-62 T 15.2-1 Sh 1 Sh 2 Sh 3 Sh 4 Sh 5 Sh 6 Sh 7 Sh 8 Revision 16 Januarv 31. 1998
  • REMOVE F 15.2-:"1 F 15.2-2 F 15.2-3 15.3-1/15.3-2 15.3-5/15.3-6 15.3-13/15.3-14 15.3-15/15.3-16 15.3-17/15.3-18 15.4-3b/15.4-4 15.4-15/15.4-16 15.4-17/15.4-18 15.4-19/15.4-20 15.4-21/15.4-22 15.4-23/15.4-24 15.4-25/15.4-26 15.4-27/15.4-28 15.4-29/15.4-30 15.4-31/15.4-32 15.4-37/15.4-38 15.4-39/15.4-40 15.4-40a/15.4-40b 15.4-41/15.4-42 15.4-49/15.4-50 15.4-51/15.4-52 15.4-53/15.4-54 15.4-55/15.4-56 15.4-61/15.4-62 15.4-63/15.4-64 15.4-121/15.4-122 15.4-129/15.4-130 T 15.4-1 Sh 3 T 15.4-5A T 15.4-5B Sh 1 T 15.4-5C T 15.4-50 T 15.4-7 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-22 INSERT F 15.2-1 F 15.2-2 F 15.2-3 15.3-1/15.3-2 15.3-5/15.3-6 15.3-13/15.3-14 15.3-15/15.3-16 15.3-17/15.3-18 15.4-3b/15.4-4 15.4-15/15.4-16 15.4.;.17/15.4-18 15.4-18a/15.4-18b 15.4-19/15.4-20 15.4-21/15.4-22 15.4-22a/15.4-22b 15.4-23/15.4-24 15.4-25/15.4-26 15.4-27/15.4-28 15.4-29/15.4-30 15.4-31/15.4-32 15.4-37/15.4-38 15.4-39/15.4-40 15.4-41/15.4-42 15.4-49/15.4-50 15.4-51/15.4-52 15.4-53/15.4-54 15.4-55/15.4-56 15.4-61/15.4-62 15.4-63/15.4-64 15.4-121/15.4-122 15.4-129/15.4-130 T 15.4-1 Sh 3 T 15.4-5A T 15.4-5B Sh 1 Sh 2 T 15.4-5C T 15.4-50 T 15.4-5E T 15.4-7 Revision 16 January 31, 1998 REMOVE . T 15. 4-8 T 15.4-9 T 15.4-11 T 15.4-21 Sh 6 Sh 14 Sh 16 F 15.4-47A F 15.4-47B F 15.4-47C F 15.4-48 F 15.4-50A F 15.4-50B F 15.4-50C F 15.4-500 F 15.4-50E F 15.4-50F F 15.4-51A F 15.4-518 F 15.4-51C F 15.4-510 F 15.4-51E F 15.4-51F F 15.4-52A F 15.4-528 F F 15.4-520 F 15.4-52E F 15.4-52F F 15.4-53A F 15.4-538 F 15.4-53C F 15.4-530 F 15.4-53E F 15.4-53F F 15.4-62 F 15.4-63 F 15.4-64 F 15.4-65 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-23 INSERT T 15.4-7A T 15.4-78 T 15.4-7C T 15.4-8 T 15.4-9 T 15.4-11 T 15.4-21 Sh 6 Sh 14 Sh 16 F 15.4-47A F 15.4-478 F 15.4-47C F 15.4-48 F 15.4-50A F 15.4-508 F 15.4-50C F 15.4-500 F 15.4-50E F 15.4-50F F 15.4-51A F 15.4-518 F 15.4-51C F 15.4-510 F 15.4-51E F 15.4-51F F 15.4-52A F 15.4-528 F 15.4-52C F 15.4-520 F 15.4-52E F 15.4-52F F 15.4-53A F 15.4-538 F 15.4-53C F 15.4-530 F 15.4-53E F 15.4-53F F 15.4-62 F 15.4-63 F 15.4-64 F 15.4-65 Revision 16 January 31, 1998 REMOVE F 15.4-66 F 15.4-67 17-i/17-ii 17-iii/17-iv 17.2-1/17.2-2 17.2-3/17.2-4 17.2-5/17.2-6 17.2-7/17.2-8 17.2-13/17.2-14 17.2-15/17.2-15a 17.2-15b/17.2-16 17.2-19/17.2-20 17.2-21/17.2-22 17.2-23/17.2-24 17.2-27/17.2-28 17.2-29/17.2-30 17.2-33/17.2-34 17.2-35/17.2-36 17.2-37/17.2-38 17.2-39/17.2-40 T 17.2-1 Sh 1 Sh 2 F 17.2-1 A-i/A-ii A-1/A-2 A-3/A-4 A-15/A-16 A-17/A-18 A-35/A-36 A-37/A-38 A-39/A-40 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-24 INSERT F 15.4-66 F 15.4-67 17-i/17-ii 17-iii/17-iv 17.2-1/17.2-2 17.2-3/17.2-4 17.2-4a/17.2-4b 17.2-5/17.2-6 17.2-6a/17.2-6b 17.2-7/17.2-7a 17.2-7b/17.2-7c 17.2-7d/17.2-7e 17.2-7f/17.2-7g 17.2-7h/17.2-7i 17.2-7j/17.2-8 17.2-13/17.2-14 17.2-15/17.2-15a 17.2-15b/17.2-16 17.2-19/17.2-20 17.2-21/17.2-22 17.2-23/17.2-24 17.2-27/17.2-28 17.2-29/17.2-30 17.2-33/17.2-34 17.2-35/17.2-36 17.2-37/17.2-38 17.2-39/17.2-40 T 17.2-1 Sh 1 Sh 2 F 17.2-1 A-i/A-ii A-1/A-2 A-3/A-4 A-15/A-16 A-17/A-18 A-35/A-36 A-36a/A-36b A-37/A-38 A-39/A-40 Revision 16 January 31, 1998 REMOVE A-41/A-42 A-43/A-44 A-51/A-52 A-55/A-56 A-57/A-58 A-71/A-72 A-79/A-80 SGS-UFSAR
  • INSERTION INSTRUCTIONS II-25 INSERT A-41/A-4la A-4lb/A_:.42 A-43/A-44 A-51/A-52 A-55/A-56 A-57/A-58 A-71/A-72 A-79/A-80 T A-4 Sh 1 Sh 2 Sh 3 Sh 4 T A-5 Sh 1 Sh 2 Sh 3 Sh 4 Revision 16 January 31, 1998 j i .l ! i
  • 1
  • l * *
  • LR-N980049 ATTACHMENT 1 Summary of Salem UFSAR Revision 16 Changes 95-4933 i j* '
  • 1 .I i I ! *
  • The following is a list of .oved changes to the Salem UFSAR which ". included in future revisions.

Salem UFSAR Changes Approved for Incorporation in Revision 16 12/16/97 Affected CN Number Sections SSAR 93-002 3.8 6.2 9.4 Affected Pages/Figuresffables 3.8-79 6.2-37 9.4-16 9.4-20 9.4-26 9.4-27 9.4-28 9.4-29 9.4-39 9.4-42 9.4-45 9.4-8 :\'ew SAR Pages: 3.8-79a, 9.4-Ia SSAR 95-013 SSAR 95-027 SSAR 95-075 2.4 3.4 10.3 3.6 2.4-6 3.4-5 10.3-1 3.6-12 3.6-17 3.6-21 3.6-22 3.6-23 3.6-24 3.6-27 3.6-55 3.6-9a F3.6-IO T3.6-2 New SAR Pages: 3.6-2 Ia 10 .10-iv 10.4 10.4-17 FI0.4-178 TI0.4-2 T.10.4-28 Description D.ocument methodology for the analysis for seismic HV AC and HV AC supports.

This analysis is a SQUG-type analysis.

Correction of the maximum load on the Auxiliary Building roof Elimination of Main Steam Breaks in penetration areas Auxiliary Feedwater Control Valve AFI I and AF21 Modifications Initiating or Ref. Document Page Tech Standard TS.ZZ-4 707(Q) PR 951221I13, Cales 6S0-0345, 6S0-0346, 6S0-0593 DEF 94-00038, LER 272/95-01 I Task I &2 DCP 2EC-3 I 9 I Pkg. I Salem UFSAR Change!proved for Incorporation in Revisio'16 Page 2 12/16/97

  • Affected Affected Initiating or CN Number Sections Pages/Figuresrfables Description Ref. Document i. SSAR 95-085 I.I I.I-I Replacement of low pressure DCP 2EC-3353 10.2 10.2-1 turbine rotors 15.2 15.2-59 15.2-60 l 5.2-60a l 5.2-60b 3.5 3.5-12 3.5-13 3.5-15 3.5-16 3.5-17 3.5-18 3.5-19 3.5-20 3.5-21 3.5-22 F3.5-6 F3.5-7 T3.5-l T3.5-2 T3.5-3 New SAR Pages: 3.5-21 a, 3.5-21 b, 3.5-:. 21c SSAR 96-004 6.3 T6.3-6 Sh 1 Revision of Refueling Water PSE-96-533, DES-93-00209 T6.3-6 Sh 2 Storage Tank drawdown T6.3-6 Sh 3 analysis T6.3-8 Sh 1 T6.3-8 Sh 2 ' I SSAR 96-007 5.5 5.5-11 Delete Reference to Table 5.2-n/a 1 I 29 -Correction of I typographical error J i SSAR 96-008 9.5 9.5-43 Emergency diesel generator DEC IEC-3401 starting air receiver compressor relief valve setting change SSAR 96-011 6.2 *F6.2-8 Containment spray header DCP I EC-3450 F6.2-9 support steel revisions for higher accident temperature
  • *
  • Salem UFSAR Chang.pproved for Incorporation in Revisi!.6 12/16/97 Affected CN Number Sections -----------

SSAR 96-012 9.1 SSAR 96-013 9.3 SSAR 96-016 10.4 SSAR 96-018 1.2 5.1 6.4 7.1 7.7 8.3 9.4 A SSAR 96-026 15.4 SSAR 96-030 8.3 Affected Pages/Figuresrr ables 9.1-30 9.3-59 9.3-60 9.3-61 10.4-2 10.4-3 10.4-4 Fl.2-2 F5.l-7 6.4-1 7.1-12 7.1-14 7.7-3 TS.3-6 9.4-2 F9.4-IA A-80 T15.4-2l Sh 14 T15.4-2l Sh 6 8.3-17 8.3-19 Description New fuel elevator basket replacement with a fuel reconstitution basket Post-Accident Sampling System (PASS) configuration and description correction Condenser vacuum pump description correction Control Room layout redesign Structural modification to annular steel columns and embedded channels 125 Volt DC battery charger alann description change Page 3 Initiating or Ref. Document DCP 2EE-0!43 PR 950727195, PR 950817432 PR 960209175 DCP I EC-3360, Pkg. I, 4, T Mod 96-002 DCP 2EC-3390 PKG I, DCP I EC-3476 PKG I DCP 2EC-3332 PKG I

  • J
  • Salem UFSAR Change-proved for Incorporation in 12/16/97 Affected Affected CN Number Sections Pages/Figu resff a hies SSAR 96-031 1.2 15.4 2.2 3.1 6 6.2 6.3 6.4 7.7 9.4 F 1.2-1 15.4-27 15.4-28 15.4-29 15.4-30 15.4-31 Tl5.4-5D 2.2-10. 2.2-12a 2.2-9 T2.2-3 3.1-4 6-v 6-vii 6.2-16 6.2-23 6.2-52 6.2-53 6.2-65 T6.2-l 1 T6.2-9 6.3-41 6.3-42 T6.3-12 6.4-1 6.4-2 6.4-4 6.4-5 T6.4-3 7.7-3 9.4-1 9.4-la 9.4-lb 9.4-2 9:4-3 '9.4 9.4-5 F9;4-IA F9.4-IB
  • New SAR Pages: 6.4-la, 6.4-lc, 6.4-1 d, 6.4-4a, 6.4-4b, 9.4-4a, 9.4-4b, 9.4-4c, 9.4-4d, 9.4-4e, 9.4-4f, Tl5.4-5E, Tl5.4-5F Sh I, Tl5.4-5F Sh 2, Tl5.4-5F Sh3 Description Control area air conditioning upgrade
  • Initiating or Ref. Document Page DCP I EC-3505 PKG I

,.

  • Salem UFSAR Change.pproved for Incorporation in Revisi'16 l2/l6i97 CN Number SSAR 96-037 SSAR 96-041 SSAR 96-042 SSAR 96-043 SSAR 96-044 SSAR 96-046 SSAR 96-047 SSAR 96-049 SSAR 96-050 SSAR 96-051 Affected Sections 8 . * .J 7.2 10.2 7.2 7.3 9.5 9.2 7.7 8.3 A 8.3 9.5 8.1 9.4 3.6 Affected Pages/Figuresffables 8.3-13 7.2-12 10.2-2 7.2-39 F7.3-4 9.5-22 9.2-22 7.7-14 8.3-20 F8.3-5 SH 2 F8.3-7 A-17 A-18 F8.3-5 Sh 2 9.5-38 8.1-10 9.4-29 9.4-35 F9.4-4A Sh2 F9.4-4B Sh2 3.6-36 F3.6-23 Description emergency diesel generator vibration alann removal Hagan module isolation amplifier reference change Main turbine lube oil purification system change Appendix R alternate shutdown methodology

-installation of transfer switches, fuse size deletion Reactor coolant pump loss of component cooling flow trip correction to agree with SER Replacement of Salem Unit 2 P250 plant computer an.d computer inverter Emergency lighting inverter logic card modification Replacement of28VDC relay cabinet circuit breakers Containment ventilation penetration pressure vacuum relief valve replacement Delete steam generator blowdown line piping material designation Page 5 Initiating or


l Salem UFSAR Chang.pproved for Incorporation in Revisi'16 j,.; Page 6 ! 12/16/97 l

  • Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document j SSAR 96-052 A A-72 Revise Control Room access DCP I EC-3619 PKG I description I SSAR_96-054 10.3 10.3-5 Replacement of Main Steam DCP 2EC-3407 PKG I FI0.3-18 Sh I steam traps with orifice/strainer FI0.3-18 Sh 2 assemblies SSAR 96-055 9.5 9.5-46 Emergency Diesel Generator DCP 2EC-3266 PKG I low lube oil temperature setpoint change SSAR 96-056 9.5 9.5-40 Emergency Diesel Generator DCP PKG I, 2, 3; fuel oil transfer pump level DCP I EC-3453 PKG I, 2, 3 setpoint change SSAR96-057 10.4 10.4-2 Revision to Service Water and 9.2 9.2-1 Turbine Auxiliaries Cooling 960711079 ISM-0496, 9.2-2 Systems lists of components lMD-0110 T9.2-I cooled. Physical changes had been made by previous DCPs .
  • SSAR 96-059 3.6 3.6-35 Penetration Area high energy DCP 2EC-3388 PKG I 3.6-41 line break pressure relief path 3.6-43 modification

-installation of F3.6-28 new vent penthouse SSAR 96-060 10.3 10.3-12 Inner and outer penetration DCP 2EC-3389 PKG I 3.6 3.6-44 area blowout panel modifications . _, SSAR 96-062 6.2 Revision to Containment DEF# DES-90-1639, LCR 6.2-44 minimum sump pH 94-48 + S95-258 Bases 6.2'-52 Change, CR 950801261, 6.2-53 950913211, NSAL PSE-93-6.2-85 215 Task4 T6.2-9 6.3 6.3-10 6.3-64 *

! * * . i I l I J l ' * * *
  • Salem UFSAR for Incorporation in Revision 16 12/16/97 CN Number SSAR 96-064 SSAR 96-066 SSAR 96-070 SSAR 96-071 SSAR 96-072 SSAR 96-074 SSAR 96-075 Affected Sections 9.4 12.1 8.3 9.4 8.3 11.4 10.4 -. Affected Pages/Figuresffables 9.4-18 9.4-20 12.1-10 12.1-11 12.1-12 12.1-13 T8.3-6 9.4-12 9.4-13 *rs.3-6 ll.4-16 10.4-18 ; -, : : Description Fuel Handling Building truck bay ventilation system addition of manual damper In-core detector quantity and storage location update Revision to 125 Volt DC battery load profile for Unit 2 as a result of replacement of steam generator feed pump vibration and shaft position instrumentation.

Unit 2 Auxiliary Building Ventilation System HEPA/charcoal filter damper fail-safe position modifications Revise Unit 2 125 Volt DC battery load profile as a result of alternate shutdown system inverter replacement Reclassify the Unit 2 plant vent high range radiation monitors

  • as non-safety related Steam Generator Slowdown sampling system isolation valves -addition of a key lock switch bypass to open the isolation valves when sampling is required for a faulted steam generator with a lo-lo level condition for Unit 2 Initiating or Ref. Document Page 7 DCP 2EC-352 I PKG 2 PR 960308137.

PR 960325171 DCP 2EE-O 119 PKG I DCP 2EC-3423 PKG I DCP 2EC-3444 PKG I DCP 2EC-3340 PKG 1 DCP 2EC-3470 PKG 1

, Salem UFSAR Change,pproved for Incorporation in Revisi'16

!"." Page 8 ' 12/16/97

  • Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document l r SSAR 96-076 11.4 11.4-19 Unit 2 Fuel Handling Area DCP 2EC-3559 PKG l. LCR Tl l.4-4 SH l Ventilation System -addition S96-088 8.3 T8.3-6 of an automatic initiation of 9. l 9. l-3b exhaust fans on a high radiation 9.4 9.4-18 signal from RMS SSAR 96-077 10.4 I 0.4-8a Unit 2 Circulating Water DCP 2EC-3465 PKG I -I 0.4-9 System controls modification FI0.4-38 SH I to delete condenser water box FI0.4-38 SH 2 vacuum during a circulating FI0.4-38 SH 3 water pump start SH 4 SSAR 96-078 8.3 8.3-9 Unit 2 Emergency Diesel DCP 2EC3387 PKG I, 2, 3 Generators A, 8 and C: installation of new EOG breaker voltage pennissive relays with setpoints corresponding to acceptable 4KV bus voltage

SSAR 96-081 5.6 -*s:6-S Installation of Letdown DCP 2EC-354 I PKG I 7.2 -F1.i .. s Isolation Bypass in the RCS . *-: during low pressurizer level *

' Salem UFSAR Change!proved for Incorporation in Revisic'16 Page 9 ' 12/16/97

  • Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document I SSAR 96-082 11.4 11.4-10 Radiation Monitor 2R4 I DCP 2EC-3212, PR 11.4-16 upgrade (plant vent) 950726207, TS Bases S95-11.4-5 258 I I .4-5a 11.4-8 11.4-9 F 11.4-1 F 11.4-3 Tl 1.4-2 Sh 2 3A 3A-8 A A-52 SSAR 96-083 9.1 9.1-13 Revision to Spent Fuel Pool DCP 2EC-3224 PKG I Rev 9.1-14 rerack for pool coolfug issues 2, CR 951207356 CRCA 2 SSAR 96-088 13.5 13.5-2a Revise a procedure title for . NAP-22 NAP-22 to include the full title SSAR 96-089 12.3 12.3-3a Revise Radiat.ion Protection UFSAR Change Notice 95-Supervisor title to agree with 17 changes made in UFSAR :e Revision 15 SSAR 96-090 1.6 1.6-5 Revise the name "main steam UFSAR Change Notice 93-10.2 I0.2-6 stop valve" to "main steam 60 10.3 10.3-15 isolation valve" I0.3-16 10.3-3
  • 10.3-4 I 10.3-5 l I0.3-8 I 10.4 10.4-17 .J 3.6 '. 3.6-18 3.6-19 3.6-28 3A:' .. .. 3A-39 *. 3A-9: 7.5 T1.S-5 SH 3 SSAR 96-093 9.4 9.4-20
  • Fuel Handling Building DEF DES-90-01304, S-C-Ventilation heat loading on FHV-MDC-1471 charcoal filter revision
  • I" i
  • i * * -. .
  • Salem UFSAR for Incorporation in Revision 16 12/16/97 Affected Affected mJ>_er_ -=Sc::.e.::.:ct::.::cio=-=n=s_.

SSAR 96-094 7.7 SSAR 96-095 3A 5.2 5.4 SSAR 96-096 15.2 15.4 7. 7-l 7a 3A-23 3A-23a 5.2-70 5.2-71 5.2-72 5.2-73 5.4-13 5.4-14 15.2-6 15.2-7 FI5.2-l Fl5.2-2 FI5.2-3 Tl5.2-l SH I 15.4-39 Fl5.4-48 fl5.4-50A Fl5.4-50B FI5.4-50C FI5.4-500 Fl5.4-50E Fl5.4-50F Fl5.4-51A Fl5.4-518 Fl5.4-51C Fl5.4-5 ID Fl5.4-51E Fl5.4-SIF FIS.4-52A FlS.4-528 PI-St4-52C Fl5.4-520 Fl5.4-52E Fl5.4-52F FIS.4-SJA FIS.4-SJB Fl5.4-53C Fl5.4-530 FlS.4-SJE FIS.4-53F TlS.4-1 SHJ Description Control Room Annunciator modificati'Ons Update of the lnservice Inspection programs, code years, vendors and equipment Update description of subcritical rod withdrawal and steamline break core response Initiating or Ref. Document Page 10 DCP 2EC-3508 PKG 1 PR 960321214 CRCA 5 Update UFSAR to agree with license 1 I

  • l .I
  • Salem UFSAR Chang.lpproved for Incorporation in Revisi!6 12/16/97 Affected CN Number Sections SSAR 96-097 SSAR 96-099 SSAR 96-100 SSAR 96-103 SSAR 96-104 SSAR 96-105 SSAR 96-106 3.7 3.8 5.1 5.6 7.7 9.4 3.6 3.5 3.8 3A 4.2 5.5 Affected Pages/Figu resff l!_bles 3.7-30 3.7-6 3.8-77a 3 .8-78 3.8-82 F5.1-6Bshl 5.6-4 7.7-21 9.4-6 3.6-9 3.5-4 3.5-5 3.8-75 3.8-76 3A-50 4.2-54 4.2-55 5.5-43 Description Seismic analyses and response spectra for the Service Water Intake Structure and Outer Penetration Areas Mid-Loop wide range level upgrade to provide level indication during reduced inventory conditions and during vacuum fill Auxiliary Building Ventilation

-delete incorrect reference to methyl iodine removal and clarify description of the ABV charcoal filter Eliminate the need to postulate arbitrary intennediate pipe breaks in accordance with Generic Letter 87-11 Clarify use of probabilistic risk assessment for tornado missile strikes to unprotected components Reduce minimum required capability of the neutron sources from providing 2 counts per second to greater than 1 cps on the source range channels Correction of CVCS valve 1CV55 fail safe positi<m to* "open" Initiating or Ref. Document Page 11 PR 951221156, PR .951221170, DES-94-00092.

DES-94-0 Generic Letter 88-17. DCP 2EC-3453 PKG I Evaluation S-C-ABV-MEE-1077, DEF DES-90-01161, CR 950921399 CRCA I 0, LCRs 95-24, 95-44, 96-21 CR 951221180 CRCA 7 DEF DES-94-00097 DCP 2EE-O I 4 7 j

  • j I * * * * *
  • Salem UFSAR Change;'!'pproved for Incorporation in Revision 16 12/16/97 Affected CN Number Sections SSAR 96-109 6.3 . 9.2 SSAR 96-110 8.3 SSAR 96-111 15.4 6.3 SSAR 96-113 5.2 SSAR 96-114 10.4 8.3 SSAR 96-115 15.4 6.3 Affected Pages/Figuresffables

.. , T6.3-13 Sh l 9.2-10 9.2-3 9.2-6b 9.2-9 8.3-6 8.3-6a Tl5.4-21SH16 6.3-32 5.2-63 10.4-8 F8.3-2 15.4-23 6.3-41 6.3-42 T6.3-12 Description Update description of Service Water System pump performance, maximum number of Service Water pumps that can be removed from service for maintenance, and description of Component Cooling Heat exchanger service water flow control 115 Volt AC Instrumentation Power system description correction Install anti-sweat pipe insulation on Service Water pipiitg at Containment Fan Coil Units Update of ISi program description for stagnated borated water systems IA W IE Circular 76-06 and IE Bulletin 79-17 Revise Circulating Water Pump electrical description to delete reference to temporary power supply from Hope Creek Switchyard, and "future" South Bus Change to UFSAR description of leakage outside containment from ECCS components following an accident Initiating or Ref. Document Page 12 DCP !EC-3292 pkg 1&2. PR 960706223.

950803382.

960703098 PR 960530208, DCP 2SC-2032, CN 90-32 DCP 2EE-0225 PKG 1 CR 960321214 CRCA 10 CR 960710211, CR 960710181, DCP lSC-2269 PKG6, 7 New procedure SC.SA-AP.ZZ-005l(Q)

) * ** * * * *

  • Salem UFSAR Changes Approved for Incorporation in Revision 16 12/16/97 CN Number SSAR 96-116 SSAR 96-118 SSAR 96-120 SSAR 96-121 SSAR 96-122 SSAR 96-123 . SSAR Affected Sections 10.3 11.4 Affected Pages/Figuresffables 10.3-12 11.4-17 11.4-18 11.4-5 Tl 1.4-2 Sh I Tl 1.4-2 Sh 2 Tll.4-2Sh3 5.2 5.2-69 New SAR Pages: I I .4-l 7a, T 11.4-2 Sh 4 9.3 6.2 9.1 15.2 2.2. **-.:*_;*";_

8.3 9.3-48 9.3-63 T9.3-4 6.2-10 6.2-11 9.1-15 15.2-32 ii';;15 T8.3-5 Description Steam Generator Tube Leak Detection -installation of nitrogen 16 detectors in the main steam lines prior to the relief valves to detect carryover from a primary to secondary leak. Incorporate NRC ASME Code relief request for the Volume Control Tank and the Regenerative Heat Exchanger Relief systems using administratively controlled manual isolation valves Incorporate Tech Spec Amendments 184/166 -change test frequency for integrated leak rate testing to that allowed by I OCFR50 Appendix J Option B Fuel Handling Building sump pump surveillance and high sump pump level alarm description revision Correction of typographical errors Correction of typographical error in the date of a reference report Revise Unit 2 28 VDC Battery Load Profile due to containlnentventcontrolboard pushbutton modifications Initiating or Ref. Document Page 13 DCP 2EC-3449 PKG 2 PR 950804231 Amendments 184/ 166 DCP lEC-3639 PKG 1 CR 960719108 CN 94-02 DCP 2EC-358 I

' * ;. l 'I -i

  • Salem UFSAR Change.proved for Incorporation in Revisio"6 12/16/97 Affected Affected CN Number Sections Pages/Figuresffables

SSAR 96-125 15.2 15.2-60 7.2 7.2-24 SSAR 96-126 3.6 3.6-36a 3.6-42 F3.6-28 9.4 F9.4-2B SH 3 SSAR 96-127 9.3 9.3-1 SSAR 96-129 11.4 11.4-8 15.I 15.1-2 15.2 15.2-41 SSAR 96-130 A A-35 A-36 A-37 A-38 A-39 A-40 A-41 A-42 A-43 New SAR Pages: A-36a, A-4la, TA-4 sh l, TA-4 sh 2, TA-4 sh 3, TA-4 sh 4, TA-5 sh l, TA-5 sh 2, TA-5 sh 3, TA-5 sh4 SSAR 96-132 15.4 15 . .i:.121 4.1 SH I 5.2 T5.2-3 SH2 Description Correction to turbine control references for section 10 Provide protection for Turbine Driven Aux Feed pump enclosure by adding blowout panels, removing and installing dampers, and adding temperature switches Station air compresstrs

-change description to one is typically running from two Correction of miscellaneous typographical errors Post accident access to vital areas -increase in the areas as a result of addressing EOPs Correction of total thermal flow rate in the listed tables for consistency with a prior change, and a typographical text correction for the subject ofFigures 15 .4-99 and 15 .4-100 Initiating or Ref. Document Page 14 DCP 2EC-3353, CR 960716247,960716226 DCP 2EC-3522 PKG I CR 960723136, Cale S-C-CA-MDC-1639 CR 960719097, 960716279, 960716271 Cale S-C-VAR-MDC-1518 CR 960801353 l *; *

  • Salem UFSAR Change.pproved for Incorporation in Revisi!6 12/16/97 CN Number ------SSAR 96-133 SSAR 96-135 SSAR 96-137 SSAR 96-138 Affected Sections 3A 3A 9.1 9.5 15.3 . 4.5 9.4 13.l 17.2 Affected Pages/Figuresffables 3A-5 3A-16 3A-51 9.1-14 9.1-16 9.1-32 9.1-34 9.5-41 15.3-2 4.5-2k 9.4-33 13.l-2b 17.2-15a Description Incorporation of Amendments I I 0/89 pertaining to Operations Manager qualifications and Amendments 1361115 pertaining to licensed operator qualifications Correction of miscellaneous typographical errors Miscellaneous editorial clarifications

-rewording of a sentence and correction of section references Change responsibility for site access training from Manager -Nuclear Security to Director -Nuclear Training Center Page 15 Initiating or Ref. Document CR 960801268 960801285.

Amendments 110/89, 136/115 CR 960724058.

960715125, 960711261 CR 960801123, 960725210, 960719113 proposed organization change

! * '

  • i * ' I -' i
  • Salem UFSAR Change"pproved for Incorporation in Revisi'16 12/16/97 Affected CN Number Sections SSAR 96-139 3A 6.2 6.3 Affected Pages/Figuresffables 3A-51a 6.2-55 6.2-58 6.2-59 6.2-60 6.2-61 6.2-66 6.2-67 F6.2-16 F6.2-18 F6.2-l 9 F6.2-21 F6.2-22 F6.2-23 F6.2-24 F6.2-29 F6.2-30 F6.2-3 I F6.2-32 F6.2-33 F6.2-34 F6.2-39 F6.2-40 F6.2-41 F6.2-42 F6.2-43 F6.2-45C F6.2-45D T6.2-IO SH l T6.2-l 0 Sh IO T6.2-l0 Sh 11 T6.2-l0 Sh 12 T6.2-l0 Sh 2 T6.2-10 Sh 3 T6.2-l0 Sh4 T6,2-IO Sh 5 T6.2-l0 Sh 6 T6,2-l0 Sh 7 T6.2-l0 Sh 8 T6.2-10 Sh 9 T6.2-12 SH l T6.2-12 SH 2 T6.2-12 SH 3 T6.2-13 SH l T6.2-13 Sh 2 6.3-10 New SAR Pages: 6.2-59a Description Containment isolation valve list revision to comply with Tech Spec's, GDC 54 through 57. and ANSI/ANS 56.2 Initiating or Ref. Document LCR S95-02 Page 16 1
  • i . ! I j
  • i I j :I J
  • Salem UFSAR Chang.pproved for Incorporation in Revisi'16 12/16/97 CN Number SSAR 96-140 SSAR 96-141 SSAR 96-142 SSAR 96-144 SSAR 96-145 SSAR 96-146 SSAR 96-147 Affected Sections 6.3 9.4 15.2 15.3 15.4 3.8 2.2 6.4 13.5 10.2 8.1 8.3 9.5 A Affected Pages/Figuresffables 6.3-44 9.4-30 15.2-37 15.3-5 15.4-130 3.8-65 2.2-10 2.2-12a T2.2-2 SH l T2.2-2 SH 2 T2.2-4 SH l 6.4-3 T6.4-2 SH l T6.4-2 SH 2 l3.5-2c .*;*_ .. 10.2-l . a.t-3. 8;3;.2* 8.3-4* 8.3-5b 9.5-37 A-2 A-3 Description Containment fan coil unit -delete statements that service water automatically isolates on a high radiation signal in the service water outlets from containment Correction*

of typographical errors and clarifications Deletion of a Chapter 15 reference mistakenly added by CN 96-38 and is not referred to

  • in the text Containment airlock pressure testing -incorporation of license amendments 56/24 Revision to control room
  • habitability discussions to reflect recent revision to calculations and an engineering evaluation Deletion of procedure NAP-61 for Significant Event Response Team -this function is part of Corrective Action Program NAP-6 Correction of typographical errors, clarifications and addition of information missed byDCPs or Ref. Document CR 950803341 Page 17 CR 960805086, 960805089 Amendments 56/24 CR 951020268, Engr Eva! A-O-ZZ-NEE-0735/l NAP-61 cancelled CR 960425182, 960509135, 960515195,960719066, 960724156,960731081, 960607124 1 ! * **
  • Salem UFSAR Change.pproved for Incorporation in 12/16/97 Affected CN Number Sections SSAR 96-149 13.1 SSAR 96-150 5.3 7.5 A SSAR 96-151 10.3 3.6 SSAR 96-152 9.4 SSAR 96-154 6.3 SSAR 96-155 1.6* .. " *-<*_, .. _-SSAR 96-156 6.3 Affected Pages/Figuresffables
13. l-2a 13. l-2b Fl3. l-6 5.3-2 T7.5-l SH 4 A-15 10.3-4 3.6-18 3.6-30 3.6-36 3.6-39 3.6-40 9.4-38 6.3-62 _ .. i_ . ,-
    • -*-.-** £ ..... ..
  • 7.6-8 ,* *:*"' .. 6.3-21 Description Radiological Safety organization change Reactor Cooling System subcooling margin monitor clarification of accuracies Add allowance for use of stainless steel piping for main steam system, feedwater system, steam generator blowdown piping, auxiliary feedwater pump steam lines, heating steam system , heating water system for erosion/corrosion purposes Pressure-Vacuum Relief System for containment building -delete statement that the system operates for at least 15 minutes when energized RHR minimum flow line -delete description of the existence of flow. indication POPS/L TOPS overshoot pressure and RCS peak pressure revision Delete spiral wound gasket material description for MOVs Initiating or Ref. Document Page 18 DCP 2EC_-3426 PKG 1 CR CR 960912290 CR 960828068 CR 960719167
  • UFSAR Chang.pproved for lncorporatio*n in 12/16/97 Affected CN Number Sections SSAR 96-157 13. l 17.2 SSAR 96-159 4.2 SSAR 96-161 10.4 Affected Pages/Figuresffables 13.l-6b Fl3. l-7 17.2-33 Fl7.2-I 4.2-79 4.2-80 10.4-13 10.4-27 Description QA organization change -reduction of quality assessment manager positions from two to one Correction of rod drop time from 2.2 to 2. 7 seconds per License Amendments 96/72 Increase feedwater heater design pressure from 700 to 725 psig for first through fifth stages "' Initiating or Ref. Document Page 19 HC UFSAR CN 96-93 License Amendments 96172._ CR 960829242 DCP 2EC-3285_

PKG 2 Salem for Incorporation in Revisic'16.

Page 20 12/16/97

  • Affected Affected Initiating or CN Number Sections Description Ref. Document ---*-*--SSAR 96-165 3A 3A-26 Update PSE&G's position Unit 2 license amendment regarding Regulatory Guide 88, CR 960829255 I .52 for acceptance criteria for in-place testing of charcoal adsorbers and HEPA units, per Unit 2 License Amendment 88 SSAR 96-167 9.5 9.5-45 Emergency Diesel Generator CR 950823075 prelube pump description I revision SSAR 96-168 6.3 6.3-16 Safety Injection pump test CR 960815172.

9605I0136 method -delete reference to . I 00 gpm test line in parallel to minitlow line ' ., SSAR 96-170 . 15.4 15.4-50 Steam generator tube rupture CR 960121088 15.4-51 event -revision increases the 15.4-52 amount of operator time to 15.4-55 complete the isolation procedure from 30 to 50 minutes, and reduces the i. subcooling margin during cooldown stage from 50 to 20 degrees F. , I SSAR 96-171 5.5 T5.5-2 SH I RHR system failure analysis CR 960716245 I T5.5-2 SH 2 revision addressing recovery for failure of a RHR suction :I valve RH 1 or RH2 to open ' SSAR 96-172 17.2 17.2-1 NAP-I procedure revision i1.2-13 SSAR 96-173 17.2 17.2.,.22 NAP-3 procedure revision 17.2-24

  • l I ;*
  • _;*, l *I I I i
  • Salem UFSAR Chang.pproved for Incorporation in Revis!.6 12/16/97 Affected CN Number Sections SSAR 96-174 7.7 SSAR 96-175 SSAR 96-176 SSAR 96-177 SSAR 96-178 SSAR 96-181 6.3 7.3 7.5 5.2 9.4 9.5 9. l 11.4 Affected Pages/Figu resrr 7.7-6 7.7-7 F7.7-2 6.3-63 6.3-64 7.3-7 7.5-1 5.2-14 5.2-15 . 9.4-41 9.5-43 F9.l-l T9.l-2 SH l Tl 1.4-2 SH l Description Control rod bank insertion monitor -delete reference to Hi Tavg signal as input to the monitor
  • Refueling Water Storage Tank level instrumentation and Accumulator MOV position indication light power source -revise description to distinguish differences between Units l and2 Steam Generator Tube Rupture event -editorial change to description of the event Emergency Diesel Generator

-clarify function of jacket water system after cooler heater Spent Fuel Pool -update reracked quantity of fuel assemblies for Unit 2 in the figure, and update pool water fluid temperatures for components in the table. Radiation Monitoring

-contairurient ventilation isolation

-delete reference to second unused radiation monitor detectors in 2R12A and 2Rl2B channels Initiating or Ref. Document Page 21 DCP 2EC-3575 PKG I. CR _951213180.

CR 960812 I 09. 960808244 CR 951017158 CR 960807270, DCP l EC-3252, 2EC-3224, UFSAR CN 95-25 DEF DES-91-00365 Salem UFSAR Change!proved for Incorporation in Revisi.!6 Page 22 12/16/97

  • Affected Affected Initiating or CN Number Sections Pages/Figu resrf ables Description Ref. Document SSAR 96-182 3.8 3.8-2 Containment Building lightning DCP 2EE-0247 PKG 1 protection

-editorial change of description SSAR 96-183 15.3 15.3-6 Revision to chapter 15, Small Break LOCA. SSAR 96-184 3.8 3.8-2 Containment Building lightning DCP IEE-0314 PKG 1 protection

-editorial change to description SSAR 96-185 11.4 11.4-23 Radiation Monitoring

-change DEF DES-91-00640 description of method of calibration for radiation detectors SSAR 96-186 13.1 13.1-11 In Manager Salem Operations duties, change review of incident reports to conditions adverse to quality ;. SSAR 96-187 7.5 T7.5-4 SH 2 Reg Guide 1.97 -delete Letter NLR-N94175, RG Variable I 9A -radiation*

1.97 rev 3 exposure rate for Fuel Handling Building and Penetration Area monitors SSAR 96-188 7.5 T7.5-4 SH4 Reg Guide l.97 -revise CR 960426096, 960614093 i T7.5-5 SH2 compliance levels of Variables l I T7.5-5 Sh 3 53 (status of standby power) I and 53A (status of control air) I .j to 5 from I . :,., le I

  • l j J ' I I j j 1 i I I i ' * .Salem UFSAR Change.proved for in Revisi.6 12/16/97 CN Number SSAR 96-189 SSAR 96-190 SSAR 96-191 SSAR 96-192 Affected Sections 15.4 7.5 15.4 6.3 8.3 6.3 8.3 9.3 Affected Pages/Figuresffables 15.4-51 15.4-52 T7.5-3 T7.5-4 SH 2 T7.5-4 SH 5 T7.5-5 SH 3 15.4-4 6.3-53 8.3-9 T6.3-5 TS.3-6 F9.3-1A SH 1 .; . __ ,_:*** *,,* .. Description Reg Guide I. 97 changes: I) relaxed environmental qualification requirements for Varable 22 Reactor Coolant System accumulator tank level and pressure to I eve I I, 2) Replace Varable 73 steam generator blowdown radiation moniti:>rs with varable 35a steam generator narrow range level for use as primary indication of steam generator tube rupture Emergency "Diesel Generators

-clarification of delay times Chemical and Volume Control System -_change material for 12 centrifugal charging pump to all stainless steel Station Air Compressor Control modification

-change . to 125VDC2C battery loading Initiating or Ref. Document Page 23 etter NLR-N92 I 45. N RC 3123192 letter. PSBP 322234-01 CR 960502113 DCP lEC-3018 DCP 1 EC-3651 PKG 2


Salem UFSAR Change.pproved for Incorporation in Page 2-l l 2/l 6/97

  • Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 96-194 11.4 11.4-19 Radiation Monitoring System DCP l EC-3505 PKG 3 11.4-4 1/2RIA/8 replacement by l l .4-5 l/2RIB for Control Area Air l l .4-5a Conditioning System and l l .4-8 Emergency Air Conditioning F 1 l.4-6 System Tl l.4-l SH I . Tl 1.4-2 SH l Tl 1.4-3 SH I Tl 1.4-4 SH I 3.1 3.1-4 6.4 6.4-2 8.3 T8.3-6 9.4 9.4-4 '.'Jew SAR Pages: F 11.4-9 '° SSAR 96-195 9.5 9.5-46 Emergency Diesei Generator
  • ocp IEC-3310 PKG I low lube oil temperature setpoint change . SSAR 96-196 13.2 13.2-1 Revision to training description CR 960514114 New SAR Pages: 13.2-2
  • SSAR 96-198 15. l T15.l-2SH2 Correction of accident analysis CN 96-38 omission 15.2 T15.2-l SH I tables for feedwater system Tl5.2-l Sh 2 malfunctions related to the Tl5.2-l Sh 3 computer code used and Tl5.2-l Sh 4 description of excessive Tl5.2-l Sh 5 feedwater at full load for single Tl5.2-l Sh 6 and multiple loops ' Tl5.2-l Sh 7 j New SAR Pages: Tl 5 .2-1 Sh 8 *1 SSAR 96-200 9.5 9.5-43 Emergency Diesel Generator

-DCP IEC-3533 PKG 1, 2, 3 starting and turbo-boost air *1 ' compressor start/stop pressure switch setpoint change to stop at 245 psig rising from 250 SSAR 96-201 10 10-iv Correction of miscellaneous CR 960703098 5.S 5.S-6 minor errors from UFSAR 7.3 7.3-20 Revision 12 change notice incorporation

' * !

  • 1 !
  • Salem UFSAR Change"pproved for Incorporation in 12/16/97 Affected CN Number Sections ---------SSAR 96-205 8.3 SSAR 96-206 5.6 SSAR 96-207 9.3 Affected Pages/Figuresffables 8.3-17 8.3-19 5.6-3 5.6-4 T9.3-6 SH 12 Description Replacement of 125 voe battery chargers Removal of Hagan instrument loop 2PT458A for Pressurizer pressure narrow range differential pressure eves System -change relief valve capacities Initiating or Ref. Document Page 25 DeP I Ee-3385 PKG I DeP 2Ee-3574 PKG l CR 960325 I 22
  • 1
  • 1 l -1 ' '
  • Salem UFSAR Change.pproved for Incorporation in 12/16/97 CN Number SSAR 96-209 Affected Sections 7.3 Affected Pages/Figuresffables 7.3-27 T7.3-3 sh I T7.3-3 sh 2 T7.3-4 sh I T7.3-4 sh 10 T7.3-4sh 12 T7.3-4 sh 13 T7.3-4sh 13a T7.3-4sh 14 T7.3-4sh 15 T7.3-4 sh 16 T7.3-4 sh 17 T7.3-4 sh 2 T7.3-4 sh 23 T7.3-4 sh 24 T7.3-4 sh 25 T7.3-4 sh 26 T7.3-4 sh 27 T7.3-4 sh 28 T7.3-4 sh 29 T7.3-4 sh 3 T7.3-4 sh 30 T7.3-4 sh 31 T7.3-4 sh 32 T7.3-4 sh 33 T7.3-4 sh 34 T7.3-4 sh 35 T7.3-4 sh 36 T7.3-4 sh 37 T7.3-4 sh 38 T7.3-4 sh 39 T7.3-4 sh 4 T7.3-4 sh 40 T7.3-4 sh 41 T7.3-4 sh 42 T7.3-4 sh 43 T7.3-4 sh 44 T7.3-4 sh 45 T7.3-4 sh 46 T7.3-4 sh 47 T7.3-4 sh 5 T7.3-4 sh 6 T7.3-4 sh 7 T7.3-4 sh 8 T7.3-4 sh 9 T7.3-5 sh 1 T7.3-5 sh 13 T7.3-5 sh 3 Description Containment flood level following a LOCA is being changed from elevation 83'-l" to 84'-0" to include additional water volume from the accumulators and reactor coolant blowdown -update Tables 7.3-4, 7.3-5, 7.3-6 and 7.3-7 Initiating or Ref. Document CR 960418084 Page 26
  • ** Salem UFSAR Changes Approved for Incorporation in Revision 16 Page 21 12116191 1
  • Affected Affected Initiating or CN Number Sections Pages/Figu resff ables Description Ref. Document *--------T7.3-5 sh 5 T7.3-5 sh 6 T7.3-5 sh 7 T7.3-5 sh 9 T7.3-6 sh I T7.3-6 sh 10 T7.3-6sh 13 T7.3-6 sh 14 T7.3-6 sh 2 T7.3-6 sh 3 T7.3-6 sh 4 T7.3-6 sh 5 T7.3-6 sh 6 T7.3-6 sh 7 T7.3-6 sh 8 T7.3-6 sh 9 T7.3-7sh 1 T7.3-7 sh 2 SSAR 96-210 9.4 9.4-10 Auxiliary Building ventilation CR 950921399 CRCA 12 9.4-11 system description update in 9.4-12 section 9.4.2 i. 9.4-13 9.4-14 9.4-15 9.4-5 9.4-6 9.4-7 9.4-8 9.4-9 New SAR Pages: 9.4-Sa SSAR 96-212 6.3 T6.3-7 Clarification of centrifugal CR 960719214 charging pump horsepower rating during accident conditions
  • 1 Salem UFSAR Change-proved for Incorporation in Page 28 " 12/16/97
  • Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 97-001 15 15-v Deletion of Section 15 .2.16, 15-vi Rod Withdrawal at Full Power 15.2 15.2-2 and replaces it with Section l 5.2-60a 15.3.5, Rod Withdrawal at Full l 5.2-60b *Power 15.2-61 15.3 15.3-1 15.3-14 15.3-15 15.3-16 SSAR 97-003 9.4 9.4-42 Revise Section 9.4.6 to reflect higher acceptable temperatures within areas served by SPA Vs HV AC system. SSAR 97-004 8.1 8.1-11 Revise separation criteria for S-C-RC-ESE-0870, PR 8.1-8 emergency feeds. 960912139 New SAR Pages: 8.1-11 a SSAR 97-005 9.4 9.4-7 Change maximum temperature PIRS 961125199 in the 22 CCW heat exchanger
. and pump room. SSAR 97-007 11.4 11.4-11 Addition of closure contacts to DCP IEC-3430 containment sample isolation valves to indicate low flow alarm on !RI l/Rl2 sample skid if valves are closed. SSAR 97-008 10.3 10.3-10 Adds description of variable DCP I EC-3328/
:!EC-3293, damping of steam flow PR 960502113 transmitters

-. -,,. ' *

  • I j I I J
  • Salem UFSAR Change!proved for Incorporation in 12/16/97 Affected CN Number Sections SSAR 97-009 11 I I. I 15 15.1 15.3 15.4 ,* Affected Pages/Figuresffables I I-iv I I.I-I 11.1-10 I 1.1-1 I 11.1-2 11.1-3 11.1-4 11.1-5 11.1-6 Tl I. I-I Tl I.I-I I t11.1-12 Tl 1.1-13 Tl 1.1-2 Tl.1.1-3 Tl 1.1-4 Tl 1.1-5 Tl 1.1-6 Tl 1.1-7 Sh I Tl 1.1-7 Sh 2 Tl 1.1-8 15-ix 15-vii 15-x 15-xxiiia 15-xxv 15.1-12 15.l-12a 15.1-13 15.1-14 15.1-24 T15.l-5 Tl5.l-6 15.3-17 15*.3-18 1_5.4-130 15.4;.16 15.4-17 . 15:4-19 15.4-20 15.4-21 15.4-22 15.4-23 15.4-24 15.4-25 15.4-26 15.4-27 Description Revision to incorporate updated offsite dose analysis results.
  • Initiating or Ref. Document Page 29 S-C-FHV-MDC-1616
  • ) < * " * *
  • Salem UFSAR Chang.pproved for Incorporation in Revision 16 12/16/97 Affected Affected CN Number Sections Pages/Figuresffables Description . -*-----15.4-40 I 5.4-40a 15.4-41 15.4-42 15.4-49 15.4-50 15.4-52 15.4-53 15.4-54 15.4-55 15.4-56. 15.4-61 15.4-62 15.4-63 F15.4-47A Fl5.4-47B F15.4-47C F15.4-62 Fl 5.4-63 F\5.4-65 F\5.4-66 F15.4-67 T\5.4-11 T15.4-5A T15.4-5B T\5.4-5C T15.4-7 T15.4-8 Tl5.4-9 2 2-iii 2-viii 2.3 2.3-11 2.3-12 . 2.3-13 2.3-14 2.3-15 3A 3a-5la 3A-5lb 3A-52 3A-53 9.4 9.4-37 New SAR Pages: 2.3-l 4a, 2.3-l 4b, T2.3-21, T2.3-22, 15.4-18a, l 5.4-18b, 15.4-22a, 15.4-55a, T15.4-58 Sh 2, T15.4-7A, T15.4-78, T15.4-7C, Initiating or Ref. Document Page 30
  • j * * * *
  • Salem UFSAR Changes Approved for Incorporation in Revision 16 12/16/97 Affected CN Number Sections SSAR97-012

8.1 Affected

Pages/Figuresffables 8.1-11 8.1-8 :"Jew SAR Pages: 8.1-11 a SSAR 97-013 3A SSAR 97-015 9.2 SSAR 97-016 6.3 SSAR 97-017 9.4 SSAR 97-019 14.2 .. **-:.-SSAR 97-020 5.6 7.2. SSAR 97-021 9.3 3A-5 T9.2-3 T9.2-4 Sh I 6.3-49 9.4-10 9.4-11 9.4-12 9.4-14 9.4-15 9.4-6 9.4-7 F9.4-2B Sh I

  • F9.4-2B Sh 2 F9.4-28 Sh 3 Tl4.2-l Sh 6 *-.. . .. 5':6;5:* .

9.3-32 9.3-33 Description Correction of separation criteria for emergency feeds Revise Reg Guide 1.11 description in Section 3A to include the RVLIS instrument lines. Edited Table 9.2-3 to clarify varying charging pump flow as a result of CCW temperature and heat load. Edited Table 9.2-4 to indicate that Component Cooling* Pump rated capacity and rated head were design points. Typographical/editorial change Auxiliary Building ventilation upgrade. Add SUP 20.3 to table that was inadvertently or incorrectly removed or omitted . Unit l bypass circuitry for low pressurizer level isolation signal. Clarify description of CVCS mixed bed demineralizers.

Initiating or Ref. Document Page 31 PIRS No. 960912139 PIRS 961120111 DCP 2EC-3269 pkg I DCP lEC-3620 i I !* I I i

  • i i J 'j I I * *
  • Salem UFSAR Changes Approved for Incorporation in Revision 16 12/16/97 CN Number SSAR 97-023 SSAR 97-024 SSAR 97-025 SSAR 97-032 SSAR 97-033 SSAR 97-034 SSAR 97-037 SSAR 97-038 Affected Sections 6.2 9.2 5.1 6.2 7.3 9.5 9.4 17.2 13.5 Affected Pages/Figu resff a hies 6.2-31 6.2-33 9.2-14 5.1-7 T6.2-13 Sh2 7.3-29 F7.3-4 9.5-22 9.4-42 9.4-43 9.4-44 *.,.1 .. 17.2-35 13.5-2b 13.5-2c Description Containment Fan Coil Unit (CFCU) return piping temperature increase to 221 degrees F. Revise Section 9.2.2 to address requirement for 3 Component Cooling Water pumps to be available to meet single failure requirements.

Revise affected page to reflect that the Reactor Vessel Head Vent valve will have power during normal operations Revise note for SW58 and SW72 in Table 6.2-13 to clarify that the valves are not Type C tested. Revise UFSAR contents regarding fuses and specific instructions for the 230V DC system in order to meet plant operations and design. Add additional details of SPA V system operations at reduced temperatures.

Change wording of 17.2.12 (Maintenance and Test . Equipment) to reflect current organization and practices.

Remove topics no longer applicable to the list of topics for Nuclear Adminstrative Procedures (NAPs) . Initiating or Ref. Document Page 32 DCP 2EC-3590 pkg 15 PIRS 960725259 PIRS 960731232 DCP 2EC-3546 DCP 2EC-3625 pkg 1 PIR 970220259, 970606220

  • Salem UFSAR Change.pproved for Incorporation in Revisi'16 l 2/l 6i97 Affected Affected _C_N !' u !_TI_b_er_

-=S:..::e-=-ct:..:.io=-=n=s

__ ---=P=-=a::..cg'-'-e=-s/-=-F.:.igo..:u:..:.r.c.::es:.:_rr-=-a=-=b:...:le=s'--

SSAR 97-039 12.3 13 13.1 13.4 13.5 17.2 . '***. 9.5 ... .. 12.3-1 13-i 13.1-10 13.1-11 13.1-12 13.1-13 13.1-15 13.1-16 13.1-18 13.1-2 13. l-2a 13.l-2b 13. l-3a 13.1-4 13.l-6a 13.1-8 13.1-9 F13.1-3 F13.l-8a Fl3.l-8b F13. l-8e T13.l-1 SH2 13.4-1 13.4-2 13.5-1 13.5-2 17.2-15a 17.2-16 17.2-17 17.2-19 17.2-22 17.2-23 17.2-24 17.2-28 17.2-29 17.2,.33 17.2;.36 17.2-37

... -*. ,.t ,.,.,., *:'f72-39 i7.2-4 17.2-5 17.2-6 Fl7.2-l 9.5-3 9.5-4 NewSARPages:

17.2-7a, 17.2-7c, 17.2-7k Description Reorganization of Maintenance Organization (site-wide), Reorganization of Salem station (create new title, Director -Salem Operations.

Chemistry to report to Operations and Change Senior Nuclear Shift Supervisor (SNSS) to Shift Superintendent.)

Initiating or Ref. Document Page 33 I -1 I

  • l
  • Salem UFSAR Change!proved for Incorporation in Revisio'16 12/16/97 CN Number SSAR 97-044 SSAR 97-046 SSAR 97-047 SSAR 97-051 Affected Sections 13.1 8.1 6.3 9,1 13. l 13.4 17.2 3A Affected Pages/Figuresffables 13.l-3a 13. l-3b 13.1-4 13.1-6 13. l-6a Fl3. l-5 Fl3. l-5a 8.1-7 8.1-9 6.3-13 T6.3-4 9.1-15 .13.l-6a 13.l-6b Fl3.l-7 Tl3.l-1SH1 T13.l-1SH2 13.4-1 13.4-2 17.2-19 17.2-40 17.2-6 17.2-7 Fl7.2-l T17.2-l Sh l T17.2-l Sh 2 3A-5 3A-5la 3A-5lb 7.2 7.2-38 7A 7A-4 New SAR Pages: l7.2-7a, l7.2-7b, l7.2-7c, l7.2-7d, l7.2-7e, l7.2-7f, l7.2-7g, l7.2-7h, 17 .2-7i, 17 .2-7j, l7.2-7k Description Reorganization within the Nuclear Engineering Department.

Free air cable separation in limited hazard areas Editorial correction,tPf minimum required RWST volume to bring UFSAR in compliance with Technical Specification 3.1.2.6 and 3.5.5 changes made in accordance with Amendments 55 and 83 Incorporates Technical Specification Amendments 192 and 175 to relocate Tech Spec section 6.5 to UFSAR section I 7 .2 and change Safety Review Group to Nuclear Review Board. Initiating or Ref. Document Page 34 S-C-ZZ-ESE-0841.

rev 2 Technical Specification Amendments 55 and 83 Tech Spec amendments 192 and I 75 1 l I ; . !* *1 -'* * ---Salem UFSAR Change.pproved for Incorporation in Revisi16 12/16/97 Affected CN Number Sections ---------SSAR 97-052 7A SSAR 97-054 6.2 SSAR 97-056 6.2 6.3 SSAR 97-057 7.2 7.5 SSAR 97-058 11.4 SSAR 97-059 13. I 17.2 SSAR 97-061 5.2 Affected Pages/Figu resffables . 7A-6 F6.2-l 7 F6.2-26 F6.2-38 F6.2-44 T6.2-IO Sh 3 T6.2-IO Sh 8 T6.2-12 Sh 3 T6.2-6 6.3-9 T6.3-13 Sh 2 7.2-32 F7.2-4 7.5-4 11.4-11 13.l-6b 17.2-5 17.2-6 ;--*' T5.2-9b Description Reconcile UFSAR Section 7 A with NRC approved license amendments 114/96 and 176/157 Revise to incorporate DCP 2EC-3612 Revise RHR pump NPSH parameters for recirculation mode of operation Revise UF:SAR based on changes to Pressurizer pressure circuits in accordance with DCP 2EC-36 l 7 pkg l Adds description of a loss of flow alann modification for containment atmosphere radiation monitors lR11/lR12.

Transferred the responsibility ofthe Quality Verification.

function from the Manager -Corrective

& Quality Services to the Manager -Quality Assessment, Salem/Hope Creek Update to Table 5.2-9b to include a note that 23 S/G was designed to ASME Section III, 1965 and all addenda thfough Winter 1995 . Page 35 Initiating or Ref. Document License amendments I 14/96 and 176/157 DCP 2EC-36 I 2 Cale# S-C-RHR-MDC-1711 DCP 2EC-36 I 7 pkg I DCP I EC-3430 pkg I PR 970410102

'f > I : I i

  • I *
  • Salem UFSAR Chang.lpproved for Incorporation in Revisi!6 12/16/97 CN Number SSAR 97-063 SSAR 97-064 SSAR 97-065 SSAR 97-066 SSAR 97-069 SSAR 97-071 SSAR 97-073 Affected Sections 6.4 9.4 Affected Pages/Figuresrfables 6.4-2 T6.4-3 9.4-3 :-;ew SAR Pages: 9.4-4b, 9.4-4d, 9.4-4f 13.1 17.2 9.4 8.1 6.3 6.3 13.1-6 13.1-8 17.2-19 9.4-42 9.4-43 9.4-44 F9.4-6a 8.1-7 6.3-9 T6.3-6 Sh 3 6.3-34 6.3-35 6.3-36 6.3-37 T6.3-6 Sh l T6.3-6 Sh 2 T6.3-6 Sh 3 New SAR Pages: 6.3-36a,63-36b, 6.3-36c 6.3 T6.3**13 Sh 2 Description Revision to the Control Area Ventilation System parameters based on implementation of DCP I EC-3505 pkg I I Transfer of Project Managers and their associated functions from Nuclear Engineering to Nuclear Business Support. Add additional details of SPA V system operation at reduced temperatures.

Revise Section 8.1.2.4.2 to address containment free air separation Revises RHR Mode 4 Hot Leg recirculation alignment.

Revision to R WST draindown analysis Revises NPSH for RHR pumps on Table 6.3-13 previously revised by SSAR CN 97-056 . Initiating or Ref. Document Page 36 DCP I EC-3505 pkg 11. SSAR CN 96-031 DCP lEC-3701pkg1 Safety Evaluation S-C-ZZ-ESE-0875, SSAR CN 97-046 LCR S97-77 2-EOP-LOCA-3, SSAR CN 96-004 S-C-RHR-MDC-171 l, Rev. l, SSAR CN 97-056

,,. .. i

  • i.
  • Salem UFSAR Changetproved for Incorporation in Revisi'16 12/16/97 Affected Affected CN Number Sections Pages/Figuresffables

SSAR 97-076 9.3 9.3-59 SSAR 97-079 8.3 8.3-9 SSAR 97-080 9.4 9.4-42 SSAR 97-081 4.2 4.2-79 4.2-80 SSAR 97-083 6.3 6.3-21 SSAR 97-085 7.7 7.7-28 SSAR 97-086 3A 3A-45 . 3A-46 *3A47 SSAR 97-087 9.5 9.5-43 Description Revise UFSAR Section 9.3.6.1 to identify that PASS ventilation exhaust is filtered with HEPA filters and not aligned to the charcoal adsorbers.

Revise description of when diesel generator breaker closes after a startup. Revises design basis for CA V area maximum temperatures in Normal and Emergency Summer operations.

Corrects rod drop time and surveillance requirements in Section 4 to concur with Technical Specifications.

Revise UFSAR Section 6.3.2.2 regarding bolting materials for motor operated valves. Updates information on Flux Peaking Factor to become consistent with Technical Specifications.

Update reference to Regulatory Guide I.IOI, remove old detailed description of Post-TMI Emergency Preparedness actions and refer to Section 13.3, Emergency Plan. Adds description of turbo-boost to EOG Starting Air Systeni Page 37 Initiating or Ref. Document PR 960723057 DCP I EC-3438 S-l-CAV-MDC-1722, Rev. 0 TS amendment 96/72, PIRS 970415279 PR 970418269 Technical Specifications, Westinghouse WCAP-7308-L-P-A Reg. Guide I.IOI, NuReg 0654/FEMARep-I and NUMARC/NESP-007 DCP I EC-3695 f ! * * *

  • Salem UFSAR Change.proved for Incorporation in Revisi.6 12/16/97 CN Number SSAR 97-091 SSAR 97-094 SSAR 97-095 SSAR 97-096 Affected Affected Sections

__ _ 12.3 12.4 3.11 3A A 9.4 12.3-4 12.4-1 F3A-3 F3A-4 3A-54 3A-55 A-56 A-57 9.4-2 New SAR Pages: 9.4-4a, 9.4-4b 9.4 9.4-2 -F9.4-1A New SAR Pages: 9.4-4a: 9.4-4b 9.4 9.4-12 9.4-13 Descrip_tion Revise post accident iodine analysis methods and make miscellaneous editorial corrections

-Revises the Chilled Water Control Valve 2CH1_68 description in accordance with modifications perfonned under DCP 2EE-03 l 7. Implements controls modifications to the Control Area Air Conditioning System (CAACS). Provide new loss-of-power damper fail-safe positions for five ABV dampers and new bypass valves for charcoal filter unit 14 outlet damper controls . Initiating or Ref. Document DCP 2EE-03 17 DCP lEE-0371 DCP lEC-3510 Page 38

.,, Salem UFSAR Change-proved for Incorporation in Revisi.16 Page 39 " 12/16/97

  • Affected Affected Initiating or CN Number Sections Description Ref. Document -------*------------SSAR 97-102
  • 10.3 10.3-7 Revises the Main Steam Line Engineering Evaluation S-C-surveillance test pressure from MS-MEE-1239 I 000 psig to 800 to I 015 psig. SSAR _97-103 13.1 13.1-1 Reflects NBU organizational
13. l-2b change which consolidates
13. l-6a QA/NSR, Nuclear Training 13. l-6b Center and Radiological Safety 13.1-8 under the one Director -13. l-8a Quality, Nuclear Training and Fl3.l-2 Emergency Preparedness Fl3. l-3 Tl3.l-I Sh I 13.2 13.2-1
  • 17.2 17.2-13 17.2-15a 17.2-3 17.2-4 17.2-5 17.2-6 17.2-7 Fl7.2-l I. Tl7.2-l Sh I 8.1 8.1-12 9.5 9.5-3 9.5-4 New SAR Pages: I 7.2-4a, l 7.2-5a, 17.2-6a, 17.2-7e, I 7.2-7f, 17.2-7g, l 7.2-7i, 17.2-1 7j, 17.2-7k SSAR 97-106 5.2 T5.2-4 Revise Pressurizer Relief Tank DES-92-00400 l (PRT) rupture disc pressure J from 85 to 100 psig. SSAR 97-108 15.2 15.2-14 Allowable control rod position LCR 97-19, WCAP-14962-P 15.2-62 deviation for Unit 2 is being 4.3 4.3-23 changed from+/-12 steps to 7.5 T7.5-2 Sh 8 +/-18 steps <=85% power and +/-12 steps >85% power . *
  • J
  • Salem UFSAR Chang.!proved for Incorporation in 12/16/97 CN Number SSAR 97-111 SSAR 97-113 SSAR 97-117 SSAR 97-118 Affected 1.6 13.1 17.2 9.5 Affected 1.6-2 1.6-6 13.1-10 13.1-11 13.1-12 13.1-13 13.1-14 13.1-15 13.1-9 Fl3.l-6 F13. l-8a Fl3. l-8b Tl3. I-I Sh I 17.2-37 9.5-3 SAR Pages: 6.4-la, 9.4-la 15.4 6.3 13.1 9.5 17.2 Tl5.4-21sh16
  • 6.3-32 13.l-18a 13.1-2 13.l-2a Fl3. l-6 Fl3. l-8a 9.5-3 17.2-16 Description Change to Operations Department responsibilities and titles Description of fiberglass blanket anti-sweat insulation installed on 3" and 2" service water piping on CFCUs in the Salem Unit 2 Containment.

Shift of responsibility for Loss Prevention and Nuclear Security organizations.

The General Manager -Hope Creek Operations will assume responsibility for Loss

  • Prevention and the General Manager -Salem Operations will assume responsibility for Nuclear Security.

Removes the statement specifying a Nuclear Engineering Manual and clarifies that Nuclear Engineering Procedures provide implementation guidance . Initiating or Ref. Document

)l I .. * * ! i 1 j * .,,, Salem UFSAR Change.pproved for Incorporation in Revisi-6 12/16/97 CN Number SSAR 97-119 SSAR 97-120 SSAR97-121 SSAR 97-122 SSAR 97-125 SSAR 97-128 Affected Sections I. I 7.3 17.2 13.l 17.2 Affected Pages/Figuresffables I. 1-1 7.3-7 17.2-19 13.l-6b 13. 1-7 13.1-8 17.2-4 17.2-5 Fl7.2-I New SAR Pages: I 7 .2-4a 3.6 17.2 17.2-15 Description Completion of correction to shared components and systems overlooked in Section 1.1 when corrections were made to Section 3.1 as part of CN 96-031 Edit page 7 .3-7to correct the description of the Unit 2 RWST level instrumentation.

Nomenclature and responsibility changes for the process of updating and approving design drawings.

Consolidation of Manager -Corrective Action with Managers Emergency Preparedness and Instructional Technology.

New Manager title: Manager -Corrective Action, Emergency Preparedness and lnstri.ictional Technology.

Also moves Quality Service functions from Manager -Corrective Action to Director -Quality, Nuclear Training and Emergency Preparedness.

Correction of IEEE Standard 279-1968 incorrectly listed as "179-I 968." Revise NDE and VT examination personnel training assessment period to be consistent with ASME Section XI requirements . Initiating or Ref. Document Page 41 DCP 1 EC-3505. SSAR CN ?6-03 I and 50.59 Safety Eva! S96-147 PR 960812109.

SSAR CN 96-175 NC.DE-AP.ZZ-0004 (Q) SER TAC 69082/69043/69044 J l l *I l *

  • Salem UFSAR Change!proved for Incorporation in 12/I 6197 CN Number SSAR 97-132 SSAR 97-134 SSAR 97-137 Affected Sections 3.8 Affected Pages/Figures/Tables F3.8-36 '.'iew SAR Pages: I 7.2-5a, I 7.2-7k 13.1 13.l-2a 13. l-3a 13.l-3b 13.l-2a 17.2-29 15.4-30 New SAR Pages: Table 15.4-5F sheets 1, 2 and 3 (added by SSAR CN 96-031 and deleted.by this CN) . .. . *:: *.1 .. :

__ Description Revise Personnel Airlock general arrangement figure to remove unecessary detail. Clarifies qualification requirements for Onsite Independent Reviewers (OIR) and makes an editorial correction to QA review of selected station procedures.

Captures the changes in responsibility due to the December 1997 reorganization of the Nuclear Engineering Department.

Transfer of the Code Assurance Specialist functions from QA to Maintenance.

Deletes reference redundant data in Table 15.4-5F added by Change N:otice 96-031 and reference to Table 15.4-5F on page 15.4-30. Initiating or Ref. Document Page 42 1 OCFR50.54a of May 16, 1997