ML16130A564

From kanterella
Revision as of 10:41, 10 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals
ML16130A564
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 05/02/2016
From: Sartain M D
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-15-016, SN 16-023
Download: ML16130A564 (8)


See also: RIS 2015-16

Text

'*' Dominion Resources

Services, Inc. Innsbrook

Technical

Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory

Commission

Attention:

Document Control Desk One White Flint North 11555 Rockville

Pike Rockville, MD 20852-2738

Serial No.: NLOS/MLW:

Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

MILLSTONE

POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY

ISSUE SUMMARY 2015-16 PLANNED LICENSING

ACTION SUBMITTALS16-023 R4 50-336/423

50-338/339

50-280/281

DPR-65 NPF-49 NPF-4/7 DPR-32/37

In response to Nuclear Regulatory

Commission (NRC) Regulatory

Issue Summary 2015-16, Revision 1, "Planned Licensing

Actions Submittals

for All Power Reactor Licensees," Attachments

1 through 3 provide the requested

information

on proposed planned licensing

action submittals

for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations.

Neither DNC nor Dominion currently

have power uprates planned in the nextfive years. The information

in the attachments

is being voluntarily

provided to assist the NRC in planning for the necessary

resources

during the budget process. Alterations

to the planned licensing

actions in Attachments

1 through 3 will be communicated

to the appropriate

NRC Project Managers as they occur. If you have any questions

concerning

this information, please contact Michael Whitlock at (804) 273-3123.

Sincerely, Mark D. Sartain Vice President

-Nuclear Engineering

Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment

1: Table of Estimated

Licensing

Actions for Millstone

Power Station Attachment

2: Table of Estimated

Licensing

Actions for North Anna Power Station Attachment

3: Table of Estimated

Licensing

Actions for Surry Power Station Commitments

made in this letter: None

cc: U. S. Nuclear Regulatory

Commission

Region I 2100 Renaissance

Blvd. Suite 100 King of Prussia,

19406-2713

U. S. Nuclear Regulatory

Commission

Region II Marquis One Tower 245 Peachtree

Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

R. V. Guzman U.S. Nuclear Regulatory

Commission

One White Flint North Mail Stop 08 C-2 11555 Rockville

Pike Rockville, MD 20852-2738

K. R. Cotton-Gross

U.S. Nuclear Regulatory

Commission

One White Flint North Mail Stop 08 G-9A 11555 Rockville

Pike Rockville, MD 20852-2738

Dr. V. Sreenivas

U. S. Nuclear Regulatory

Commission

One White Flint North Mail Stop 08 G-9A 11555 Rockville

Pike Rockville, MD 20852-2738

NRC Senior Resident Inspector

Millstone

Power Station NRC Senior Resident Inspector

North Anna Power Station NRC Senior Resident Inspector

Surry Power Station Serial No.16-023 Docket Nos.: 50-336/423

50-338/339

50-280/281

Page 2 of 2

  • ./ ATTACHMENT

1 Serial No.16-023 Docket Nos.: 50-336/423

Table of Estimated

Licensing

Actions for Millstone

Power Station MILLSTONE

POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.

Table of Estimated

Licensing

Actions Millstone

Power Station Units 2 and 3 Docket Nos: 50-336/50-423

TSTF Number , If Projected

Submittal

Outage Outage Related Can the NRC staff Proprietary

Plant Name and Unit Number(*)

Licensing

Action Type Licensing

Action Description/Title

make the lnfonnallon

C-ta any Date Related? Date public? lnfonnatlon

Millstone

Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone

Power Station Unit 2 License Amendment

LAR for Large Break LOCA Reanalysis

05/2016 Yes 402016 Yes Yes Millstone

Power Station Unit 3 Exemptions

Exemption

for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone

Power Station Unit 2 License Amendment

LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Mill s tone Power Station Unit 3 Licen se Amendment

LAR to Add New TS 3/4.7.15 for Main Feedwater

Isolation , 12/2016 No Yes No Regulating, and Bypas s Valves Millstone

Power Sta tion Un it 2 License Amendment

Extension

of Type A ILRT Interval to 15 Years. Rev ise TS for 10/2017 Yes 402018 Yes No Containment

Leakage Rate Testi ng Requirements

Millstone

Power Station Units 2 and 3 License Amendment

LAR for Electrical

Cross-Tie Connection

2017 No Yes No Millstone

Power Station Un it 3 License Amendment

TSTF-556 LAR for Resolution

of Open Phase Condition

Bulletin 2012-01 -2017 No Yes No Design Vulnerability

in electric power system Millstone

Power Station Un it 2 License Amendment

LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone

Power Station Unit 3 License Amendment

TSTF-3 74 Modify TS requirements

for EDG fuel oil testing 2017 No Yes No Millstone

Power Station Units 2 and 3 Licen se Amendment

TSTF-552 Diesel Generator

Frequency

and Voltage Surveillance

2018 No Yes No Requirements. WCAP-17308-NP. Measurement

Uncertainty

Recapture (MUR) -Recovery of a Millston e Power Station Unit 2 License Amendment

portion of the 2% measurements

Uncertainty

Required by 2018 No Yes No Rono

Millstone

Power Station Un it 2 License Amendment

Delete Item 8 (Cont ainment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Mill sto ne Power Station Unit 3 License Amendment

Extens ion of Type A ILRT I nterval to 15 Years. Revise TS for 1 0/2019 Yes 402020 Yes No Containment

Leakage Rate Testing Requirements

Page 1of1

ATTACHMENT

2 Serial No.16-023 Docket Nos.: 50-338/339

Table of Estimated

Licensing

Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS

1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated

Licensing

Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339

Plant Name and Unit Number(s)

North Anna Powe r Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Unit 1 North Anna Power Station , Un i ts 1 and 2 North A nna Power Station , Unit 1 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 Licensing

Action Type License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

Li cense Amendment

Lice n se Amendment

Re l ief Request Relief Request Relief Request License Amendment

License Amendment

TSTF Number, If any TSTF-522 Licensing

Action Description/Title

EAL Revision -Fuel clad degradation

and fue l clad barrier l oss ISFSI License Renewal (f or Pad 1 TN-32) Fuel Independent

SBLOCA Analysis (TS Reference

Change/COLR Mod) Revision to Spent Fuel Criticality

Analysis -updated fuel design w/ 5% fuel enrichment

LAR for PAD 5.0 and FSLOCA [Large Brea k] Adds Open Phase Condition (O P C) Isolat ion System operab i lity and surveillance

requireme nts for mitigation

of an OPC Revise the Environmental

Protection

Plan to Correct CFR References

Revise the surveillance

requ i rements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to inco rporate the requirements

of Regulatory

Guide 1.52 , revision 3 , which requires In-Place Filter Testing/Laboratory

Testing to be extended to 24 months. Second Period Limited E xa mination Relief Request -N1-14-LMT-002

Request to extend the reactor vesse l weld examinations

by ten years. The PWR Owner's Group analysis by Westinghouse

has already been started. N1-14-NDE-008

I N2-14-NDE-003

North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency

Operations

Facility (LEOF) to an EOF located at Innsbrook

Page 1of1 Projected

Submittal

Outage Outage Can the NRC staff Proprietary

make the lnfonnatlon

Comments Date Related? Related Data public? Yes or No Information

07/2 016 No Yes No 05/2016 No Yes No 08/2 016 No Yes Supports comp lia nce Yes with 10CFR50.46(c) 09/2016 No Ye s Yes 2018 No Yes Supports compliance

Yes with 10CFR50.46(c)

2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Ye s No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No

ATTACHMENT

3 Serial No.16-023 Docket Nos.: 50-280/281

Table of Estimated

Licensing

Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated

Licensing

Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281

Plant Name and Unit Number(*)

Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un it s 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 S urry Power Station Units 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Stat i on Un i ts 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Licensing

Action Type License Amendment

License Amendme n t License Amendment

License A m endment License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

Rel i ef Request License Amendment

License Amendment

License Ame ndm ent License Amendment

License Ame ndm ent License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

TSTF Number, If any TSTF-547 Projected

Submittal

Licensing

Action Description/Title

Date Alternate

monitoring

of rod position with one 05/2016 in operable rod position indicator

Revises Residual Heat Removal (RHR) and Com p onent Cooling (CC) Systems' TS 05/2016 Requirements

and adds an RHR Surveillance

Re vises the Fue l Cladd i ng Barrier Degradation

and 06/2016 Loss Emergency

Action Le vel Thresholds

Extends the Charging Pump Service Wa t er and MCR/ESGR AC Subsystems

Flowpath Allowed 05/2016 Outage T i me from 24 to 72 hrs E xpands the Primary Grade (PG) Water Lo ckout TS 05/2016 Requirements

Extends the Emergency

Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition

(OPC) Isolation

System operability

and surveillance

requ ireme nts 01/2017 for m i t i gat ion of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences

for FHA , SGTR, MSLB and L RA TS change to extend ACT to permit replacement

of the Reserve St at io n Service Transformer

C and and 03/2017 cable/bu s replacement

ISi Alternative

Req uest to perm it use of CFRP application

i n buried safety re l ated SW Pip i ng as 07/2016 pressure boundary Administrati

ve change de l etes temporary/one-time TS AOTs/Requirements

for previously

completed

08/2 016 chilled water pipe replacement

project , and other Rev ise d UFSAR Dose Analyses 09/2016 Fuel I ndependen t S BLOC A A na lysis 09/2016 Topical Report DOM-NAF-2 Appendix E (A GORA 12/2016 CHF Correlation) RLBL OCA for Vend or Qualification

Program 04/2017 AGORA Vendor Qualificat

i on Program Submitta l 04/201 7 Spent Fuel Poot Criticality

An alys i s 2018 Full Spectrum LOCA An a lysis 2018 R elocation

of L eak Tes ting of Misce llan eous 2018 Rad ioactive Matera il s to TRM LAR to rely on off-s i te EMrs rather than on-site 2017 EM rs LAR to m ove the Local Emergen cy O pera tions 2017 Facili ty (LEOF) to an EOF located at Innsbrook

Page 1of1 Outage Outage Related Can the NRC staff Proprietary

make the Information

Comments Related? Date public? Yea or No Information

No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (S PS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Y es No Yes Yes No Yes No No Yes No No Yes No