MONTHYEARML21180A4172021-06-22022 June 2021 PWR Owners Group, Table 1- Comments on the Draft Safety Evaluation (Dse) for PWROG-19047-P and PWROG-19047-NP ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML16130A5642016-05-0202 May 2016 NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML13242A0172013-08-23023 August 2013 Flood Hazard Reevaluation Supplemental Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendation 2.1 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0708602872007-02-0505 February 2007 8th Pinc Meeting Feb. 5-6, 2007, Proposed CRDM and Bmi Mockups Using Na 2 Nozzle 31 Results ML0708602742007-02-0505 February 2007 8th Pinc Meeting Feb. 5-6, 2007, DAG-01 Analysis Scheme for Pinc Round Robin Test ML0633201332006-11-28028 November 2006 Population Impacts for ABWR, MCSS2 ML0633201302006-11-28028 November 2006 Table 7-4: AP1000 Collapsed Plume Characterization Data, MACCS2 ML0708602082006-10-25025 October 2006 7th Pinc Meeting 10/25 - 27, 2006 TG-NDE Test Blocks for Pinc Round Robin ML0609500942006-04-0303 April 2006 North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power ML0501802572005-01-13013 January 2005 Stations Units 1 & 2, Millstone Power Station Units 2 & 3, Request for Approval of Appendix B of Topical Report DOM-NAF-2, Qualification of Westinghouse WRB-1 CHF Correlation in the Dominion VIPRE-D Computer Code. ML0424700192004-08-24024 August 2004 Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical Report ML0213600242002-05-14014 May 2002 ASME Section XI Inservice Inspection (ISI) Program Relief Request Partial-1. Table - North Anna, Unit 2 - Reactor Vessel Outlet Nozzle to Shell Welds 10, 12 & 14 ML0212200882002-04-0505 April 2002 Attachment 5 - Table R - Relocated Specifications and Removed Details North Anna, Units 1 and 2, Amendments 231 and 212 ML0212200672002-04-0505 April 2002 Attachment 4 - Table L - Less Restrictive Changes North Anna, Units 1 and 2, Amendmends 231 and 212 ML0212200612002-04-0505 April 2002 Attachment 3 - Table M - More Restrictive Changes North Anna, Units 1 and 2, Amendments 231 and 212 ML0212200532002-04-0505 April 2002 Attachment 2 - Table a - Administrative Changes North Anna, Units 1 and 2, Amendments 231 and 212 ML19093B0201978-02-22022 February 1978 Response to 02/02/78 Letter Possibility That Reactor Cavity Annulus Seal Ring or Associated Biological Shielding Could Become Missiles in Event of Loss of Coolant Accident Pipe... 2021-06-22
[Table view] Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 23, 2013 U.S. Nuclear Regulatory Commission Serial No. 13-121A Attention: Document Control Desk NL&OS/WDC RO Washington, DC 20555 Docket Nos. 50-338/339 License Nos. NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 FLOOD HAZARD REEVALUTION SUPPLEMENTAL RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST REGARDING FLOODING ASPECTS OF RECOMMENDATION 2.1
References:
- 1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
- 2. NRC letter to Licensees, "Prioritization of Response Due Dates for Request of Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated May 11, 2012.
- 3. Letter from Eugene S. Grecheck (Dominion) to NRC Document Control Desk, "North Anna Power Station Units 1 and 2 Flood Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendation 2.1," dated March 11, 2013.
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference I to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 2 of Reference 1 requested that each licensee perform a reevaluation of external flooding sources and report the results in accordance with the NRC's prioritization plan. On May 11, 2012, the NRC issued Reference 2. Consistent with Reference 2, in a letter dated March 11, 2013, Virginia Electric and Power Company (Dominion) completed the flood reevaluation at North Anna Power Station and submitted the results to the NRC (Reference 3). Reference 3 contained interim actions to address higher flooding hazards relative to the design basis until the integrated assessment is completed.
The attached table provides a list of the action items contained in Reference 3 with the current status.
Serial No. 13-121A Docket Nos. 50-338/339 Page 2 of 3 If you have any questions regarding this information, please contact Mr. Thomas Shaub at (804) 273-2763.
Sincerely, Eugene S. Grecheck Vice President - Nuclear Engineering and Development Virginia Electric and Power Company COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck, who is Vice President - Nuclear Engineering and Development of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this _._____day of AW6+. 2013.
My Commission Expires: bx,,er 31. 201,& CRAIG D SLY Notary Public I Commonwealth of Virgi
']aryPublic Reg. # 7518653 1 My Commission Expires December 31, 2oL&
.l=y ............. l Commitments made in this letter: No new regulatory commitments
Attachment:
- 1. Flooding Hazard Reevaluation Report Action Items List
Serial No. 13-121A Docket Nos. 50-338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission, Region II Regional Administrator Marquis One Tower 245 Peachtree Center Ave. NE Suite 1200 Atlanta, Georgia 30303-1257 Dr. V. Sreenivas Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton Gross Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Blvd.
Glen Allen, Virginia 23060
Serial No. 13-121A Docket Nos. 50-338/339 ATTACHMENT I FLOODING HAZARD REEVALUATION REPORT ACTION ITEMS LIST VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2
Serial No. 13-121A Docket Nos. 50-338/339 Attachment 1, Page 1 of 3.
item' R~epo rt Itmbem, Refec ,;
Vml~enai~ .... :ActionItem ist Implementation 1 Reference 3, Perform a visual inspection of the yard drain systems within the North Complete Attachment 2, Anna protected area and a visual inspection of the Turbine Building and May, 22, 2013 Section III, 3rd Service Building roof drain systems and a visual inspection of the paragraph Turbine Building and Service Building roof areas for potential loose materials that could potentially block drains.
Status: Inspection was performed. A new periodic test procedure was implemented for annual inspection of the yard drain systems within the North Anna protected area and a visual inspection of the Turbine Building and Service Building roof drain systems and a visual inspection of the Turbine Building and Service Building roof areas for potential loose materials that could potentially block drains. This action item is complete.
2 Reference 3, Evaluate the need for additional periodic visual inspections and/or Complete Attachment 2, preventative maintenance (PMs) of the yard drain systems within the Section 11,4 th North Anna protected area and the Turbine Building and Service paragraph Building roof drain systems.
Status: Evaluation was completed. As a result, a new periodic test procedure was implemented for annual inspection of the yard drain systems within the North Anna protected area and a visual inspection of the Turbine Building and Service Building roof drain systems. This action item is complete.
Serial No. 13-121A Docket Nos. 50-338/339 Attachment 1, Page 2 of 3" Item Number Report.Atin.t%.is Reference Implem~entation Acio Ie is Date 3 Reference 3, Evaluate the need for and/or potential designs for temporary or Complete Attachment 2, permanent barriers to prevent postulated flood water infiltration into the Section III, 6 th Fuel Oil Pump Houses. August 20, 2013 paragraph Status: Evaluation was completed. As a result, modifications were made to allow installation of flood protection barriers at the three Fuel Oil Pump House doors as mitigation for severe weather conditions.
This action item is complete.
4 Reference 3, Evaluate the need for dikes or barriers at other doors and/or louvers Integrated Attachment 2, within the protected area during the Flooding Integrated Assessment. Assessment Section III, 7 th Report due by paragraph March 11, 2015 5 Reference 3, Perform a visual inspection of the West Basin sump drain prior to June Complete Attachment 2, 1,2013.
Section rth 11, 8 Status: Inspection was performed. A new periodic test procedure was paragraph implemented for annual visual inspection of the West Basin sump drain.
This action item is complete.
6 Reference 3, Issue a preventative maintenance procedure to require annual visual Complete Attachment 2, inspections of the West Basin sump drain prior to June 1, of each year. May 2, 2013 Section 111, 8th Status: A new periodic test procedure was implemented for annual paragraph visual inspection of the West Basin sump drain. This action item is complete.
2
Serial No. 13-121A Docket Nos. 50-338/339 Attachment 1, Page 3 of 3'.
Item Report tsImplementation. .
ActioItemList NNumber.,. Referience . Date&, >
7 Reference 3, Revise North Anna abnormal procedures for hurricane preparation to Complete Attachment 2, include inspection of roof and roof drains, as well as storm drain inlets,Section III, 9 th upon notification of a major tropical storm/hurricane approaching central May 17, 2013 paragraph Virginia region.
Status: Abnormal Procedure for severe weather conditions was revised to address inspection of roof and roof drains, as well as storm drain inlets. This action item is complete.
8 Reference 3, An Integrated Assessment of the Flood Hazards for North Anna Units 1 Integrated Attachment 2, and 2 will be performed and an Integrated Assessment Report will be Assessment Section III, 1 0 th provided to the NRC prior to March 12, 2015. Report due by paragraph March 11, 2015 3