Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562
ML14071A069
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/20/2014
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-14-0249
Download: ML14071A069 (39)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. QIN23POOIB Equip. Class Equipment Description AUX FODWA TER PUMP 1B Sheet 1 of.2 5 Status: Y[E'ND] U[Location:

Bldg. AUXILIARY Floor El. 100 Room, Area 16z.Manufacturer, Model, Etc. (optional but recommended)

Instructlons for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anehoraee 1. Is the anchorage configuration verification required (i.e., is the itein one Y@1'ND of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y[(NN3 UD N/AO Y4 NEI ur N/AD YC/ NDI UD N/AD YE NO UO N/AO Y6 uNU 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 234 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 FT 40 Seismic Walkdown Checklist (SWC)Sheet 2 ofX !Statm: YGý NO UE[]Equipment ID No. QIN23POOIB Equip. Class, Equipment Description AUX FEEDWA TER PUMP 1B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YE4NC UEJ N/AC Y[f"NO UW N/AD YEYND UE] N/AD YZA'TD UEJ Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YLP oD UID adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by- Y1VA0$ T/M Date: 4Z-PAOL A419ZLJ 12;1'(% Z'/Page 235 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 236 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 A I Page 237 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 , V Page 238 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS fi- 1 NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 oft 5'J4d4)Status: Y[A'] UE-]Seismic Walkdown Checklist (SWC)Equipment ID No. QIPI1LT0516 Equip. Class, 18 Equipment Description CONDENSATE STORAGE TANK LEVEL TRANSMITTER Location:

Bldg. YARD Floor El. 155 Room, Area C -Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings, Additional space is provided at the end of this checklist for documenting other comments.Anchoraze 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YOEIý2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YNO U" N/AD)0<0l UE N/AD Y ND UD N/All Y* N] UN I Enter the equipment class name from Appendix B; Classes of Equipment.

Page 239 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet Y f uw)Status: Yj7NE] U[]F 1-4 Seismic Walkdown Checklist (SWC)EquipmentIDNo.

OtPlILT0516 Equip. Class' 18 Equipment Description CONDENSATE STORAGE TANK LEVEL TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

U- N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YVNIO U-1 N/AC and masonry block walls not likely to collapse onto the equipment?

9. Do attached fines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?P1UO N/AD Tki46Luo Other Adverse Condtions 11, Have you looked for and found no other seismic conditions that could W U0 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: 4c I Vtok QAptLOt~ A Date:I.-ý

-'0/>6/'Page 240 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 I -* ! --.................

11 ....................

Page 241 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 U'Page 242 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 71/t Page 243 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of , Status: Yw [-] U[]Seismic Walkdown Checklist (SWC)Equipment ID No. QIPTO01 Equip.Equipment Description CONDENSATE STORAGE TANK Location:

Bldg. YARD FloorEl. 155 Roo: Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y NO of the 50% of SWEL items requiring such verification)?

ýý.g "bI7/38q ;lek., 6.o A.yj B-617/i007

-,Wz ee. Piz 2. Is the anchorage flee of bent, broken, missing or loose hardware?U- N/AD 3. Is the anchorage free of corrosion that is more than mild surface Yj1 ND UD N/AD oxidation?

4. Is'p7.G- r o "r/ O UO f/A/..4. Is the anchorage free of visible cracks in the concrete near the anchors? UD- N/AD 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

pp,,, .ýb /-7/ z 6 3reV., , a.,A 1,-7/oo7.4.42 Ver..zo 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YNO UD N/AD YONOUn Enter the equipment class name from Appendix B: Classes of Equipment.

Page 244 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of )Status: U[]Seismic Walkdown Checklist (SWC)Equipment ID No. OllITO01 Equip. Class'Equipment Description CONDENSATE STORAGE TAN, Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y[N14 UD N/AD 8. Are overhead equipment, distribution systems, ceiling files and lighting, YtNrl UD N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZNE=] UDI N/AD Ytý/N UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YfANID UDI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: *^,I Date: 9o //2OZ.~-// -2NL Page 245 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 246 of 562 NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS A.Page 247 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. QIP15HV3100 Equip. Class, Pouinment Desrintinn RHR HXiSAMPLE VALVE Sheet 1 of 3 Status: Y@"NE] U]Location:

Bldg. AUXILIARY Floor El. 77 Room, Area / 8 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorane 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yf ND U0 N/AD YVND UO" N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y UD N/AD 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YD ND UD N/A&'te 'NOUD I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 248 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Sthaeet of 3 Status: U[-]Equipment ID No. QIP15HV310A

&'. Equip. Class'Equipment Description RHR HXA SAMPLE VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?U' N/AC Y'4NrJ U" N/ACl YtN2I" UM N/A[UEJ Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could U[0 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

YIl1, 0 v 3 it 5, 4 I- (/-IfAjýI" ; -t ý y Evaluated by:-., -Date: 19. /0, ZOF?I Page 249 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0'3 I I Page 250 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 1 1 1111 111 11 , I IN I Fl-'Seismic Walkdown Checklist (SWC)Equipment ID No. QIOJI.F50.A

-Equip.Equipment Description SW STRAINER IA Sheet 1 of 4 Status: Y[1 N1UO Location:

Bldg. $WIA Floor El, l7 Room, Area : f12,A Manmfacftr, Model, Etc. (optional but recommended)

Insttmetions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Aichorane 1. Is the anchorage configuration verification required (i.e., is the item one Y$ No of the 50% of SWEL items requiring such verification)?

YK TM "110/61-1.

2. Is the anchorage fre of bent, broken, missing or loose hardware?3. Is the anchorage fre of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete ner the anchors?5. Is the anchorage configuration consistent with plant documentaion?(Note: This question only applies if the item is one of dhe 50% for which an anchorage configuration vafication is required.)

t24- 6U9 .A-Iiacýt VC r. z2-0 6. Based on the above anchmrage evaluations, is the anchorage free of potentially adverse seismic conditions?

YINEJ U0 N/AU.NIJ UD N/AD YK UUI i EDWe the equipmment ca name from Appendi B: Classe of Equpmeat.Page 251 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. Q1PfIFWOIA

-,Equ. Clasw Sheet 2 04 64 Sfttus: YO) NO U!]T Equipmeant Deacaiption, SW STINNE&i1 7. Are soft targets free from impact by nearby equipment or stncturcs?

Yr$ NO 110 N/AIJ 8. Are overhead equipment, distribution systems, cefling tiles and lighting.

NEI ur N/AC)and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?A~ NO 110 N/AO 7-N -1 Other Advm-se Conditions
11. Have you looked for and found no other seismic conditions that could A[fiND UOaffect the safety li~mcdions of the equipment?

C=mmts (Additional pages may be added as necessary) tt-w-iolt cormsion , Evaluaxted by:rý &I IAAa17 7wtY~aco*

LoamroModa/

t1/4fiz Date: _q/'i/r.L2 Page 252 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 253 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 254 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. QIPI6FV3009A Equip. Class, Sheet i of:# I?Status: YdNON" U[]Equipment Description CCW HEAT EXCHANGER SERVICE WATER DISCHARGE Location:

Bldg. AUXILIARY Floor El. 100 Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraze 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?YO -YO] NEI UE] N/A1 I IQ -I- I of CZ tpcoN e-.3 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YO] NO] UO]N/c NIAIV 4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UO 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE] NE UE] N/Ab" e'N] UOE]I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 255 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Ss t(Seismic Walkdown Checklist (SWC)Sheet 2 Of a+Status: Y[]'N[N]

Ut-Equipment ID No. Q1PI6FV3009A Equip. Class 1 7 Equipment Description CCW HEAT EXCHANGER SERVICE WA TER DISCHARGE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YfKq lVO N/AE]r YeD U0 N/AD Y UD N IAU0 Yt~$Io U0 Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could INC UEJ adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

/111014L hS(~~~ ~ ( Po i~16~f(t/~/N

-, 614 dXVs Evaluated by: Date: , 21. ,2.4-2/Z1~/Page 256 of 562 NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 257 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS PileF V3rm 14pl (v(0 NO. SNCF164-RPT-01, VERSION 2.0ýrI el f for Page 258 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 rf -&-I Seismic Walkdown Checklist (SWC)Sheet 1 of 3 Status: Yl NR- UI"J Equipment ID No. QIP16G517B Equip. ClassL 20 Equipment Description TURB BLDG SW ISO VALVE RELAY BOX Location:

Bldg. DIESEL Floor El. 155 Room, Area 0O03'5(;.Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Yf No of the 50% of SWEL items requiring such verification)?

1 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yq NO U- N/AC Yý. NO U[] N/A[4. Is the anchorage free of visible cracks in the concrete near the anchors? YQA NIO UC N/AO 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Ylq NC UC N/AC Y4 N UC IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 259 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Fl-,0 Seismic Walkdown Checklist (SWC)Sheet 2 of 3 Status: Yo Nn U]Equipment ID No. Q1P16G517B Equip. Class' 20 Equipment Description TURB BLDG SW ISO VALVE RELA Y BOX Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YNO UD N/AU 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y NO UO N/AO and masonry block walls not likely to collapse onto the equipment?

14 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y NC] UO N/AO YERNO U0 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YI" NEI UO]adversely affect the safety functions of the equipment?

P-Comments (Additional pages may be added as necessary)

Evaluated by: ~~I ~h)&CJLu ~4 ?l6~z. Q..A4 TA MK{Lý" Date: _/ _,/ ,,', oI -z.Ol I I/ / 7 I I Page 260 of 562 A T T C H A E N 3 : s S S A 4 C A L K D O V W V C H E C K L IS T S No. SNCF164_RPT., VRFSION 2.0 4 Page 261 Of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)She1 of4 q Status: U[-]Equipment ID No. QIPlOMOV3149 Equip. Classý 8 Equipment Description BLOWDOWN HX ISOLATION MOV Location:

Bldg. AUXILIARY Floor El. 121 Room, Area 2:ýo Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorase 1. Is the anchorage configuration verification required (i.e., is the item one YO- NE of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YO NO UC N/A.E YO NO UF N/A['4. Is the anchorage free of visible cracks in the concrete near the anchors? YF'] NO U[L N/A[Y knr' Q~~-NYO0 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

YO NO UQ NIAY 1 Y11 NO UO Page 262 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Sheet 2 ofjq Status: Y/ NEI UE]Equipment ID No. QIP16MOV3149 Equip. Class, Equipment Description BLOWDOWN HX ISOLATION N1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEA NO U[ N/AO Yrj NO UC N/AC YIA NO UC N/AC Yi NO UC Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y9/"N UC adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: -Q Date: 9 1 3I7 jtV/f Page 263 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 264 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Ff..,P NO. SNCF164-RPT-01, VERSION 2.0 it ,-, 1-1 Page 265 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 nI- ý1 Seismic Walkdown Checklist (SWC)Equipment ID No. QIPf6POO1C Equip. Class, Equipment Description SERVICE WATER PUMP 1 C Sheet I of 3 Status: Y$] NC UE]Location:

Bldg. SWIS Floor El. 188 Room, Area 72.. A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorate I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Yg ND 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YJ NO UEJ N/AD NO UD N/AD Y'(N[ UD N/AD¥/6N[0 UD N/AD N[3 uNJ I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 266 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Ps 0 Seismic Walkdown Checklist (SWC)Sheet 2 of 3 Status: Yo Nn U[]Equipment ED No. QIP16POOIC Equip. Class' 6 Equipment Description SERVICE WATER PUMP IC Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y4.,,,NE U0 N/AEI Yj:ifm U- N/Afl Yý NE UFC N/AEI YI NEI UE Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y NEI UE]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

  • JfwtAiTj, O Ia t iuvin KA/2-la'L. j.A, U~Uf Date: .43 )& 12.1ý\jý,f \j , Page 267 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTSf,,,Q NO. SNCF164-RPT-01, VERSION 2.0 D Page 268 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 SI-7D Fl- 70 Seismic Walkdown Checklist (SWC)Sheet i of/Y4 Status: YP N[] Ut]Equipment U) No. Q1P16V514 Equip. Class' 8 Equipment Description SERVICE WA TER TO TURBINE BLDG ISOLA TION VALVE Location:

Bldg. YARD Floor El. 155 Room, Area ,'49 A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE) NJ of the 50% of SWEL items requiring such verification)?

I 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE) NE) UE) N/Alp YE NE) UE) N/A.YE) NEI UE) N/Ar9 YE NE) UE) N/A[ýY? NEI U-IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 269 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Waikdown Checklist (SWC)Sheet 2 Of 14 Status: Y N] No -]Equipment ED No. QIP16V514 Equip. Class, 8 Equipment Description SERVICE WATER TO TURBINE BLDG ISOLATION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Ylp NrJ UMJ N/AOJ 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI NOl UO N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?'iiP NO UQ N/Afl V NO UO Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could "V3 NE UQ" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Law-n Date: '____oC_ __z, A,"9Mt/ ,-Date: Page 270 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0\I Page 271 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS I t- "7o NO. SNCF164-RPT-01, VERSION 2.0 f 1- 70-Page 272 of 562