ML091751067

From kanterella
Revision as of 17:00, 9 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Beaver Valley Power Station, Unit No. 2-Acceptance of Requested Licensing Action Spent Fuel Pool Rerack
ML091751067
Person / Time
Site: Beaver Valley
Issue date: 06/25/2009
From: Morgan N S
Plant Licensing Branch 1
To: Sena P P
FirstEnergy Nuclear Operating Co
morgan n
References
TAC ME1079
Download: ML091751067 (3)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 June 25, 2009 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 BEAVER VALLEY POWER STATION, UNIT NO.2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE:

SPENT FUEL POOL RERACK (TAC NO. ME1079)

Dear Mr. Sena:

By letter dated April 9, 2009, FirstEnergy Nuclear Operating Company submitted a license amendment for Beaver Valley Power Station, Unit NO.2 (BVPS-2). The proposed amendment would modify Technical Specifications (TSs) to support the installation of high density fuel storage racks in the BVPS-2 spent fuel pool. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review is performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

P.Sena -2If you have any questions, please contact me at (301)

Sincerely, Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-412 cc: Distribution via Listserv P.Sena -If you have any questions, please contact me at (301) 415-1016.

Sincerely, IRA! Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-412 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDssSrxb Resource Branch Reading File KWood RidsAcrsAcnw_MailCTR Resource RidsNrrDeEmcb Resource RidsNrrDorl Resource MHartzman RidsNrrDorlDpr Resource RidsNrrDssSbpb Resource RidsNrrDorlLpl1-1 Resource SJones RidsNrrLASLittle Resource MHamm RidsNrrPMNMorgan Resource EWong RidsOgcRp Resource GLapinsky RidsRgn1 MailCenter Resource DWerkheiser RidsNrrDciCsgb Resource RidsNrrDirsltsb Resource ADAMS Accession No*.. ML091751067 *Via email OFFICE DORLlLPL 1-1/PM DORULPL 1-1/LA DIRS/IOLB/BC DCI/CSGB DIRS/ITSB/BC DE/EMCB/BC NAME NMorgan SUttle NSalgado MGavriias REIliot MKhanna DATE 6/25/09 6/25/09 OFFICE DSS/SBPB/BC (A) DSS/SRXB/BC DORULPL 1-1/BC NAME GPurciarelio GCranston NSalgado DATE 6/25/09 OFFICIAL RECORD COpy