Category:Letter
MONTHYEARML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09
[Table view] Category:Code Relief or Alternative
MONTHYEARML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML21054A3302021-02-24024 February 2021 Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19039A1492019-02-25025 February 2019 Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18251A0042018-09-18018 September 2018 Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127) ML18193B0302018-07-18018 July 2018 Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval Extension ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18099A3732018-04-0909 April 2018 04/09/2018 E-mail from R. Guzman to R. Walpole, Verbal Authorization for Relief Request IP2-ISI-RR-06 ML18059A1562018-03-0606 March 2018 Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4 ML18005A0662018-01-23023 January 2018 Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML17069A2832017-03-16016 March 2017 Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification Requirement ML16358A4442017-01-11011 January 2017 Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3 ML16167A0812016-07-15015 July 2016 Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16053A0252016-03-0303 March 2016 IP2-ISI-44-18, Relief from the Requirements of the ASME Code CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML14198A3312014-07-23023 July 2014 Safety Evaluation for Relief Request IP3-ISI-RR-06 for Reactor Vessel Weld Examinations (Tac No. MF3345) NL-13-041, Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency Extension2013-02-20020 February 2013 Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency Extension ML12334A3172012-12-0303 December 2012 Relief Request IP2-ISI-RR-15 - Proposed Alternative to the Use of a Weld Reference System NL-12-065, 2012 Summary Report for In-Service Inspection and Repairers and Replacements2012-06-13013 June 2012 2012 Summary Report for In-Service Inspection and Repairers and Replacements NL-12-069, Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System2012-05-23023 May 2012 Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System ML11105A1222011-04-25025 April 2011 Relief from the Requirements of the ASME Code to Perform Essentially 100 Percent Volumetric Examination of the Weld and Adjacent Base Material for the Third 10-Year Inservice Inspection ML11109A0162011-04-25025 April 2011 Relief Request No. IP2-ISI-RR-12, Reactor Vessel Shell-To-Flange Weld Inspection for the Fourth 10-Year Inservice Inspection Interval (Tac No. ME5180) NL-10-136, Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval2010-12-14014 December 2010 Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval ML1017400482010-07-15015 July 2010 Relief Request RR-11 for the Fourth 10-Year Inservice Inspection Interval NL-10-061, CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval2010-07-0505 July 2010 CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval ML1015303122010-06-0707 June 2010 Relief Request RR-02 for the Fourth 10-Year Inservice Inspection Interval NL-09-022, Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program2009-02-0606 February 2009 Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program NL-09-0111, Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program2009-01-22022 January 2009 Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program NL-09-003, Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination2009-01-20020 January 2009 Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination NL-08-096, Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses2008-07-0808 July 2008 Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses ML0721304872007-09-0505 September 2007 Relief Request No. RR-01 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0602600762006-02-0808 February 2006 Relief Request (RR) No. 74 NL-05-0720, Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld Examination2005-06-0808 June 2005 Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld Examination ML0509401362005-04-0404 April 2005 Relief, Relaxation of First Revised Order on Reactor Vessel Nozzles ML0507700102005-03-18018 March 2005 Relaxation of First Revised Order on Reactor Vessel Nozzles ML0427406642004-10-14014 October 2004 Relief Request Nos. R-33, R-71, R 3-40(A) and R-41, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 2 and No. 3 and Pilgrim Nuclear Power Station ML0427406282004-10-14014 October 2004 Relief Request Nos. 65, 66, 3-34 and 3-35 Regarding Alternative Nondestructive Examination Qualification Requirements ML0425203922004-10-0505 October 2004 Relief, Requirements of American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section III, 1965 Edition, & Section XI, 1989 Edition, for Repair & Inspection of Reactor Pressure Vessel Head Penetrations ML0418901542004-07-0707 July 2004 Relief, Relief Request Nos. RR-67 and RR 3-36, TAC Nos. MC1698 and MC1699 ML0410700882004-07-0606 July 2004 Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600 ML0408205162004-03-22022 March 2004 Relief Request Nos. RR-68, RR3-37, and PRR-34 (TAC MC1559, MC1560, & MC1561) ML0408506682004-03-19019 March 2004 Relief Request Nos. 70 and 3-39 Regarding Alternative Depth Sizing Criteria.(Tac MC1696 & MC1697) ML0408600062004-03-19019 March 2004 Relief Request No. RR 63 Regarding risk-informed Inservice Inspection Program ML0335000092003-12-16016 December 2003 Inservice Testing Program Relief Request Nos. 47 and 48, MB9111 and MB9112 2021-02-24
[Table view] Category:Safety Evaluation
MONTHYEARML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23243A8452023-11-30030 November 2023 Enclosure 3: Issuance - IP LAR for SE Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0022023-11-17017 November 2023 Enclosure 2 - Safety Evaluation for Indian Point Unit 2 License Amendment Request to Modify Technical Specifications for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23067A0822023-11-0101 November 2023 Enclosure 2 - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Safety Exemption Evaluation for Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications ML21054A3302021-02-24024 February 2021 Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML20297A3332020-11-23023 November 2020 Enclosure 3, Safety Evaluation for Transfer of Renewed Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline ML20100H9922020-06-0202 June 2020 Issuance of Amendment No. 269 Proposed Technical Specification Changes to City Water Surveillance Requirement and Condensate Storage Tank Required Action A.1 ML20122A2622020-05-0404 May 2020 Correction to Amendment No. 294 Dated April 28, 2020, Permanently Defueled Technical Specifications ML20081J4022020-04-28028 April 2020 Issuance of Amendment No. 294 Permanently Defueled Technical Specifications ML20078L1402020-04-15015 April 2020 Issuance of Amendment Nos. 62, 293, and 268 Changes to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML20099A1822020-04-13013 April 2020 Issuance of Relief Request IP3-IST-RR-001 - Alternative to Certain Requirements of the ASME Code for Extension of the Fourth 10-Year Inservice Test Interval ML20071Q7172020-04-10010 April 2020 Issuance of Amendment Nos. 292 and No. 267 Changes to Technical Specification Sections 1.1, 4.0, and 5.0 for a Permanently Defueled Condition ML19333B8682019-12-18018 December 2019 Approval of Certified Fuel Handler Training and Retraining Program ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19209C9662019-09-0404 September 2019 Issuance of Amendment No. 290 Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool ML19065A1012019-03-21021 March 2019 Issuance of Amendment No. 61 and No. 289 Deletion of License Conditions Related to Decommissioning Trust Provision ML19039A1492019-02-25025 February 2019 Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4 ML18337A4222018-12-20020 December 2018 Issuance of Amendment No. 265 One-Time Extension of 10 CFR Part 50, Appendix J, Type a, Integrated Leakage Rate Test Interval ML18251A0042018-09-18018 September 2018 Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127) ML18193B0302018-07-18018 July 2018 Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval Extension ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18142A4312018-05-31031 May 2018 Safety Evaluation for Relief Request IP2-ISI-RR-06 Approval of Alternative to Use Embedded Weld Repair ML18059A1562018-03-0606 March 2018 Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4 ML18005A0662018-01-23023 January 2018 Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17348A6952018-01-11011 January 2018 Issuance of Amendment Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank (CAC No. MF9578; EPID L-2017-LLA-0202) ML17320A3542017-12-22022 December 2017 Issuance of Amendments Amendment of Inter-Unit Transfer of Spent Fuel (CAC Nos. MF8991 and MF8992; EPID L-2016-LLA-0039) ML17315A0002017-12-0808 December 2017 Issuance of Amendments Cyber Security Plan Implementation Schedule (CAC Nos. MF9656, MF9657, and MF9658; EPID: L-2017-LLA-0217) ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML17065A1712017-03-27027 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17069A2832017-03-16016 March 2017 Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification Requirement ML16336A4922017-01-27027 January 2017 Transmittal Letter: Order Approving Transfer of Master Decommissioning Trust Funds for Indian Point, No. 3 & FitzPatrick Nuclear Plant from the Power Authority of the State of New York to Entergy Nuclear Operations, Inc. ML16358A4442017-01-11011 January 2017 Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3 ML16215A2432016-11-15015 November 2016 Issuance of Amendment Nos. 285 and 261 Conditional Exemption from End-of-Life Moderator Temperature Coefficient ML16179A1782016-09-14014 September 2016 Safety Evaluation for Relief Request IP2-ISI-RR-01, Examination of Upper Pressurizer Welds ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16167A0812016-07-15015 July 2016 Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600 ML16147A5192016-07-14014 July 2016 Safety Evaluation for Relief Request IP2-ISI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16064A2152016-04-12012 April 2016 Issuance of Amendments Cyber Security Plan Implementation Schedule 2023-05-01
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 April 25, 2011 Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 INDIAN POINT NUCLEAR GENERATING UNIT NO.2 -RELIEF REQUEST NO. IP2-ISI-RR-12, REACTOR VESSEL SHELL-TO-FLANGE WELD INSPECTION FOR THE FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL (TAC NO. ME5180)
Dear Sir or By letter dated December 14,
2010, Entergy Nuclear Operations, Inc. (the licensee)
Relief Requests IP2-ISI-RR-12, to the U.S. Nuclear Regulatory Commission (NRC) for from certain American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code),Section XI requirements at Indian Point Nuclear Generating Unit Nos. 2 Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Entergy requested authorization to utilize the alternative requirements in ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VIII, Supplements 4 and 6 as by 10 CFR 50.55a in lieu of the requirements of IWA-2232, that requires Ultrasonic Testing examination of the Reactor Pressure Vessel (RPV) shell-to-flange weld to be in accordance ASME Code, Article 4 of Section V, as supplemented by Appendix I of Section The NRC staff has reviewed the licensee's proposed alternative to apply ASME Code, XI, Appendix VIII examination requirements when volumetrically examining the IP2 Shell to Flange Weld by UT, and concludes that the procedures, equipment, and qualified to ASME Code,Section XI, Appendix VIII have shown a high probability of detection, and have increased the reliability of examinations of weld configurations within scope of the POI program. Therefore, the proposed alternative will provide an acceptable of quality and safety and is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the IP2 10-year lSI interval, effective from March 2007 through May V. P. Operations
-All other ASME Code,Section XI requirements for whtch relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
If you have any questions, please contact the Indian Point Project Manager, John Boska, at (301) 415-2901.
Sincerely, Nancy L. Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247
Enclosure:
As stated cc w/encl: Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR ON THE FOURTH 10-YEAR INTERVAL INSERVICE RELIEF REQUEST NO.
ENTERGY NUCLEAR OPERATIONS. INDIAN POINT NUCLEAR GENERATING UNIT NOS. DOCKET NO.
1.0 INTRODUCTION
By letter dated December 14, 2010 (Agencywide Document Access and Management (ADAMS) ML 103560598), Entergy Nuclear Operations, Inc. (the licensee) submitted the Request IP2-ISI-RR-12, to the U.S. Nuclear Regulatory Commission (NRC) for relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Section XI requirements at Indian Point Nuclear Generating Unit No.2 Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Entergy requested authorization to utilize the alternative requirements in ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VIII, Supplements 4 and 6 as by 10 CFR 50.55a in lieu of the requirements of IWA-2232, that requires Ultrasonic Testing examination of the Reactor Pressure Vessel (RPV) shell-to-flange weld to be in accordance ASME Code, Article 4 of Section V, as supplemented by Appendix I of Section The subject Relief Request is for the Fourth 10-Year Inservice Inspection Interval at IP2, effective March 2007 through May 2016. 2.0 REGULATORY REQUIREMENTS Inservice inspection (lSI) of the ASME Code, Class 1, 2, and 3 components is performed in accordance with Section XI of the ASME Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific relief has been granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i).
10 CFR 50.55a(a)(3) states that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if: (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1,2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, "Rules for Enclosure
-2 Inservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components.
The regulations require that in service examination of components and system pressure tests conducted during the first 1 O-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR SO.SSa(b) 12 months prior to the start of the month interval, subject to the limitations and modifications listed therein. The ASME Code of Record for the IP2 fourth 10-year lSI interval program is the 2001 Edition the 2003 Addenda of Section XI of the ASME Code. 3.0 EVALUATION RR No. IP2-ISI-RR-12 ASME Code Components Reactor Pressure Vessel (RPV) Shell-to-Flange Weld. ASME Code Requirements ASME Code,Section XI, Category B-A, Item B1.30, Pressure Retaining Welds in Reactor Vessel specifies that a volumetric examination must be performed once per each 10-year interval.
The 2001 Edition, 2003 Addenda of ASME Code,Section XI, Subsection IWA-2232, requires UT examination of the RPV shell-to-flange weld to be in accordance with ASME Code,Section V, Article 4 of, as supplemented by ASME Code,Section XI, Appendix I. Additionally, Regulatory Guide (RG) 1.1S0, Revision 1, "Ultrasonic Testing of Reactor Vessel Welds during Pre-service and In-service Examinations,"
the ASME Code,Section V and Section XI requirements.
Licensee's Basis for Relief Request (As stated) Pursuant to 10 CFR SO.SSa(a)(3)(ii), relief is requested from the requirements of [ASME Code,Section XI,] Subsection IWA-2232 since the vendor performing the inspection has qualified their equipment, procedures and personnel to the requirements of ASME [Code,] Section XI, 1995 Edition with 1996 Addenda, Appendix VIII, Supplements 4 and 6 as amended by 10 CFR SO.SSa. Performing the inspection in accordance with the requirements of [ASME Code,Section XI,] IWA-2232 would require the inspection vendor to also qualify their equipment, procedures and personnel to the requirements of [ASME Code,Section V,] Article 4 of, as supplemented by [ASME Code,Section XI,] Appendix I. Since the inspection methods provided in [ASME Code,Section XI,] Appendix VIII have been proven to be more effective in detecting and sizing flaws, the use of [ASME Code,] Section V techniques would require additional resources and result in a less effective inspection.
The [RPV] flange-to-shell drawing 1 that will be developed as part of the examination program plan will be similar to the drawing 1 The RPV Flange-to-Shell Drawing is not included in this report.
-3 in Enclosure four to Entergy letter NL-09-022, dated February 9, 2009, for the [Indian Point,] Unit 3 relief request RR-3-47(1) (TAC ME0413). Licensee's Proposed Alternative Examination (As stated) Pursuant to 10 CFR 50.55a{a){3)(i), Entergy requests authorization to utilize the altemative requirements in ASME [Code,] Section XI, 1995 Edition with 1996 Addenda, [ASME Code,Section XI,J Appendix VIII, Supplements 4 and 6 as amended by 10 CFR 50.55a in lieu of the requirements of [ASME Code,Section XI,] IWA-2232, that requires UT examination of the RPV shell-to-f1ange weld to be in accordance with [ASME Code,Section V,] Article 4, as supplemented by [ASME Code,Section XI,] Appendix I. [ASME Code,Section XI,] Appendix VIII requirements were developed and adopted to ensure the effectiveness of rUT] examinations within the nuclear industry by means of a rigorous, item specific performance demonstration containing flaws of various sizes, locations, and orientations.
The performance demonstration process has established with a high degree of confidence, the capability of personnel, procedures, and equipment to detect and characterize flaws that could be detrimental to the structural integrity of the RPV. The [Performance Demonstration Initiative] (POI) approach has demonstrated that for detection and characterization of flaws in the RPV the rUT] examination techniques are equal to or better than the requirements of the ASME [Code,] Section V, Article 4 rUT] examination requirements.
Though [ASME Code,Section XI,J Appendix VIII is not required for the RPV flange weld examination, the use of [ASME Code,Section XI,J Appendix VIII, Supplements 4 and 6 criteria for detection and sizing of flaws in this weld will be equal to or exceed the requirements of ASME [Code,] Section V, Article 4. Therefore, the use of the proposed alternative will continue to provide an acceptable level of quality and safety, and approval is requested pursuant to 10 CFR 50.55a{a)(3)(i).
Staff Evaluation The 2001 Edition through the 2003 Addenda of the ASME Code,Section XI, IWA-2232 states, "Ultrasonic examination shall be conducted in accordance with Appendix I." ASME Code,Section V, Article 4 provides a prescriptive process for qualifying UT of procedures and the scanning requirements for examinations.
The UT performed to ASME Code,Section V, Article 4 uses detailed criteria for setting up and calibrating equipment, calculating coverage, and detecting indications.
The capability of an ASME Code,Section V, Article 4 UT examination is demonstrated with calibration blocks made from representative material containing holes and notches. The licensee proposes, in lieu of the ASME Code,Section V, Article 4 angle beam examination to use an examination that will be performed using examination procedures, personnel, and equipment qualified in accordance with ASME Code,Section XI, Appendix VIII, Supplements 4 and 6, as modified by 10 CFR 50.55a. 10 CFR 50.55a limits the use of ASME Code,Section XI, Appendix VIII to the 2001 Edition of the ASME Code with no Addenda. ASME Code,Section XI, Appendix VIII is a performance-based UT method. Performance-based UT requires that detailed criteria be used for performance demonstration tests. The results for the tests are compared against statistically developed screening criteria.
The tests are performed on representative mockups containing flaws similar to those found in operating plants. The performance-based tests demonstrate the effectiveness of UT personnel and procedures.
Examinations are performed with the scanning requirements for Supplements 4 and 6 that are provided in 10 CFR 50.55a(b)(2)(xv)(G), and the scanning volume identified in the ASME Code,Section XI, Figure IWB-2500-4 for the shell-to-f1ange weld. The scanning requirements are: (1) for the examination of the inner 15 percent through-wall volume, scanning will be performed in four orthogonal directions to the maximum extent possible with procedures and personnel qualified to ASME Code,Section XI, Appendix VIII, Supplement 4 or; (2) if the inner 15 percent through-wall volume examination is not possible as required above, the inner 15 percent through-wall volume is considered fully examined if coverage is obtained in at least one parallel and one perpendicular direction using personnel and procedures qualified for single side examination in accordance with ASIVIE Code,Section XI, Appendix VIII, Supplement 4 and Supplement 6; and (3) the remaining 85 percent through-wall volume is considered fully examined if coverage is obtained in one parallel and one perpendicular direction using procedures and personnel qualified for single side examination.
Single side qualification criteria are provided in 10 CFR 50.55a{b)(2)(xv){G){2) and 10 CFR 50.55a(b)(2){xvi).
The procedures, equipment, and personnel qualified to ASME Code,Section XI, Appendix VIII have shown a high probability of flaw detection, and have increased the reliability of examinations of weld configurations within the scope of the POI program. Therefore, the proposed alternative will provide an acceptable level of quality and safety.
4.0 CONCLUSION
The NRC staff has reviewed the licensee's proposed alternative to apply ASME Code,Section XI, Appendix VIII examination requirements when volumetrically examining the IP2 RPV Shell to Flange Weld by UT, and concludes that the procedures, equipment, and personnel qualified to ASME Code,Section XI, Appendix VIII have shown a high probability of flaw detection, and have increased the reliability of examinations of weld configurations within the scope of the POI program. Therefore, the proposed alternative will provide an acceptable level of quality and safety and is authorized pursuant to 10 CFR 50.55a(a){3){i) for the IP2 fourth 10-year lSI interval, effective March 2007 through May 2016. All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject requests for relief remain applicable, including third-party review by the authorized Nuclear Inservice Inspector.
Principal Contributor:
T. McLellan, NRR/OCI/CVIB Oate: April 25, 2011 V. P. Operations All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
If you have any questions, please contact the Indian Point Project Manager, John Boska, at (301) 415-2901.
Sincerely, /raJ Nancy L. Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC Ridsl'JrrDorlLpl1-1 RidsNrrPMlndianPoint RidsOGCRp LPL 1-1 Reading File RidsNrrLASLittle RidsAcrsAcnw_MailCTR RidsNrrDorlDpr RidsRgn1 MailCenter RidsNrrDciCvib TMcLellan, NRRlDCIICVIB ADAMS ACCESSION NO.: ML11109A016
(*) No substantial change in SE Input Memo ** Via e-mail NRR/LPL 1-1/LA(**)
E NRR/LPL 1-1/PM NRR/CVIB/BC(*)
NRR/LPL 1-1/BC MMitchell NAME JBoska SUttle NSalgado 04/21/11 04/18/11 DATE 04/21111 04/25/11 OFFICIAL RECORD