Letter Sequence Approval |
---|
EPID:L-2017-LLR-0128, Relief Request IP3-ISl-RR-13 - Lnservice Inspection Interval Extension (Approved, Closed) |
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML21299A0032021-10-28028 October 2021 And Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML21054A3302021-02-24024 February 2021 Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19039A1492019-02-25025 February 2019 Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18251A0042018-09-18018 September 2018 Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127) ML18193B0302018-07-18018 July 2018 Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval Extension ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18099A3732018-04-0909 April 2018 04/09/2018 E-mail from R. Guzman to R. Walpole, Verbal Authorization for Relief Request IP2-ISI-RR-06 ML18059A1562018-03-0606 March 2018 Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4 ML18005A0662018-01-23023 January 2018 Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML17069A2832017-03-16016 March 2017 Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification Requirement ML16358A4442017-01-11011 January 2017 Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3 ML16167A0812016-07-15015 July 2016 Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16053A0252016-03-0303 March 2016 IP2-ISI-44-18, Relief from the Requirements of the ASME Code CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML14198A3312014-07-23023 July 2014 Safety Evaluation for Relief Request IP3-ISI-RR-06 for Reactor Vessel Weld Examinations (Tac No. MF3345) NL-13-041, Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency Extension2013-02-20020 February 2013 Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency Extension ML12334A3172012-12-0303 December 2012 Relief Request IP2-ISI-RR-15 - Proposed Alternative to the Use of a Weld Reference System NL-12-065, 2012 Summary Report for In-Service Inspection and Repairers and Replacements2012-06-13013 June 2012 2012 Summary Report for In-Service Inspection and Repairers and Replacements NL-12-069, Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System2012-05-23023 May 2012 Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System ML11105A1222011-04-25025 April 2011 Relief from the Requirements of the ASME Code to Perform Essentially 100 Percent Volumetric Examination of the Weld and Adjacent Base Material for the Third 10-Year Inservice Inspection ML11109A0162011-04-25025 April 2011 Relief Request No. IP2-ISI-RR-12, Reactor Vessel Shell-To-Flange Weld Inspection for the Fourth 10-Year Inservice Inspection Interval (Tac No. ME5180) NL-10-136, Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval2010-12-14014 December 2010 Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval ML1017400482010-07-15015 July 2010 Relief Request RR-11 for the Fourth 10-Year Inservice Inspection Interval NL-10-061, CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval2010-07-0505 July 2010 CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval ML1015303122010-06-0707 June 2010 Relief Request RR-02 for the Fourth 10-Year Inservice Inspection Interval NL-09-022, Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program2009-02-0606 February 2009 Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program NL-09-0111, Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program2009-01-22022 January 2009 Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program NL-09-003, Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination2009-01-20020 January 2009 Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination NL-08-096, Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses2008-07-0808 July 2008 Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses ML0721304872007-09-0505 September 2007 Relief Request No. RR-01 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0602600762006-02-0808 February 2006 Relief Request (RR) No. 74 NL-05-0720, Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld Examination2005-06-0808 June 2005 Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld Examination ML0509401362005-04-0404 April 2005 Relief, Relaxation of First Revised Order on Reactor Vessel Nozzles ML0507700102005-03-18018 March 2005 Relaxation of First Revised Order on Reactor Vessel Nozzles ML0427406642004-10-14014 October 2004 Relief Request Nos. R-33, R-71, R 3-40(A) and R-41, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 2 and No. 3 and Pilgrim Nuclear Power Station ML0427406282004-10-14014 October 2004 Relief Request Nos. 65, 66, 3-34 and 3-35 Regarding Alternative Nondestructive Examination Qualification Requirements ML0425203922004-10-0505 October 2004 Relief, Requirements of American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section III, 1965 Edition, & Section XI, 1989 Edition, for Repair & Inspection of Reactor Pressure Vessel Head Penetrations ML0418901542004-07-0707 July 2004 Relief, Relief Request Nos. RR-67 and RR 3-36, TAC Nos. MC1698 and MC1699 ML0410700882004-07-0606 July 2004 Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600 ML0408205162004-03-22022 March 2004 Relief Request Nos. RR-68, RR3-37, and PRR-34 (TAC MC1559, MC1560, & MC1561) ML0408506682004-03-19019 March 2004 Relief Request Nos. 70 and 3-39 Regarding Alternative Depth Sizing Criteria.(Tac MC1696 & MC1697) ML0408600062004-03-19019 March 2004 Relief Request No. RR 63 Regarding risk-informed Inservice Inspection Program ML0335000092003-12-16016 December 2003 Inservice Testing Program Relief Request Nos. 47 and 48, MB9111 and MB9112 2021-02-24
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] Category:Safety Evaluation
MONTHYEARML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23243A8452023-11-30030 November 2023 Enclosure 3: Issuance - IP LAR for SE Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23050A0022023-11-17017 November 2023 Enclosure 2 - Safety Evaluation for Indian Point Unit 2 License Amendment Request to Modify Technical Specifications for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23067A0822023-11-0101 November 2023 Enclosure 2 - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Safety Exemption Evaluation for Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications ML21054A3302021-02-24024 February 2021 Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML20297A3332020-11-23023 November 2020 Enclosure 3, Safety Evaluation for Transfer of Renewed Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline ML20100H9922020-06-0202 June 2020 Issuance of Amendment No. 269 Proposed Technical Specification Changes to City Water Surveillance Requirement and Condensate Storage Tank Required Action A.1 ML20122A2622020-05-0404 May 2020 Correction to Amendment No. 294 Dated April 28, 2020, Permanently Defueled Technical Specifications ML20081J4022020-04-28028 April 2020 Issuance of Amendment No. 294 Permanently Defueled Technical Specifications ML20078L1402020-04-15015 April 2020 Issuance of Amendment Nos. 62, 293, and 268 Changes to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML20099A1822020-04-13013 April 2020 Issuance of Relief Request IP3-IST-RR-001 - Alternative to Certain Requirements of the ASME Code for Extension of the Fourth 10-Year Inservice Test Interval ML20071Q7172020-04-10010 April 2020 Issuance of Amendment Nos. 292 and No. 267 Changes to Technical Specification Sections 1.1, 4.0, and 5.0 for a Permanently Defueled Condition ML19333B8682019-12-18018 December 2019 Approval of Certified Fuel Handler Training and Retraining Program ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19209C9662019-09-0404 September 2019 Issuance of Amendment No. 290 Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool ML19065A1012019-03-21021 March 2019 Issuance of Amendment No. 61 and No. 289 Deletion of License Conditions Related to Decommissioning Trust Provision ML19039A1492019-02-25025 February 2019 Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4 ML18337A4222018-12-20020 December 2018 Issuance of Amendment No. 265 One-Time Extension of 10 CFR Part 50, Appendix J, Type a, Integrated Leakage Rate Test Interval ML18251A0042018-09-18018 September 2018 Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127) ML18193B0302018-07-18018 July 2018 Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval Extension ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18142A4312018-05-31031 May 2018 Safety Evaluation for Relief Request IP2-ISI-RR-06 Approval of Alternative to Use Embedded Weld Repair ML18059A1562018-03-0606 March 2018 Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4 ML18005A0662018-01-23023 January 2018 Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17348A6952018-01-11011 January 2018 Issuance of Amendment Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank (CAC No. MF9578; EPID L-2017-LLA-0202) ML17320A3542017-12-22022 December 2017 Issuance of Amendments Amendment of Inter-Unit Transfer of Spent Fuel (CAC Nos. MF8991 and MF8992; EPID L-2016-LLA-0039) ML17315A0002017-12-0808 December 2017 Issuance of Amendments Cyber Security Plan Implementation Schedule (CAC Nos. MF9656, MF9657, and MF9658; EPID: L-2017-LLA-0217) ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML17065A1712017-03-27027 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17069A2832017-03-16016 March 2017 Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification Requirement ML16336A4922017-01-27027 January 2017 Transmittal Letter: Order Approving Transfer of Master Decommissioning Trust Funds for Indian Point, No. 3 & FitzPatrick Nuclear Plant from the Power Authority of the State of New York to Entergy Nuclear Operations, Inc. ML16358A4442017-01-11011 January 2017 Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3 ML16215A2432016-11-15015 November 2016 Issuance of Amendment Nos. 285 and 261 Conditional Exemption from End-of-Life Moderator Temperature Coefficient ML16179A1782016-09-14014 September 2016 Safety Evaluation for Relief Request IP2-ISI-RR-01, Examination of Upper Pressurizer Welds ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16167A0812016-07-15015 July 2016 Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600 ML16147A5192016-07-14014 July 2016 Safety Evaluation for Relief Request IP2-ISI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16064A2152016-04-12012 April 2016 Issuance of Amendments Cyber Security Plan Implementation Schedule 2023-05-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. O.C 20555-0001 July 18, 2018 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3-SAFETY EVALUATION FOR RELIEF REQUEST IP3-ISI-RR-13 REGARDING FOURTH TEN-YEAR INSERVICE INSPECTION INTERVAL EXTENSION (EPID L-2017-LLR-0128)
Dear Sir or Madam:
By letter dated October 18, 2017 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML17297A455}, Entergy Nuclear Operations, Inc. (the licensee) submitted Relief Request IP3-ISI-RR-13 for Indian Point Nuclear Generating Unit No. 3 (Indian Point Unit 3) to the U.S. Nuclear Regulatory Commission (NRC). Entergy Nuclear Operations, Inc., proposed an alternative to the requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," 2001 Edition through 2003 Addenda. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.55a(z)(1 ), the licensee proposed to extend the current 10-year inservice inspection (ISi) interval 12 months beyond the one-year extension allowed by the ASME Code,Section XI, paragraphs IWA-2430(d)(1) and (d)(3). The licensee requested to use the alternative on the basis that the alternative provides an acceptable level of quality and safety.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject request remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
If you have any questions concerning this matter, please contact the Indian Point Unit 3 Project Manager, Mr. Richard Guzman, at (301) 415-1030 or Richard.Guzman@nrc.gov.
1~,J~~--
Sincerely, James G. Danna, Chief Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D C 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO RELIEF REQUEST IP3-ISI-RR-13 FOURTH TEN-YEAR INSERVICE INSPECTION INTERVAL EXTENSION ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 DOCKET NO. 50-286 EPID: L-2017-LLR-0128
1.0 INTRODUCTION
By letter dated October 18, 2017 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML17297A455), Entergy Nuclear Operations, Inc. (the licensee) submitted Relief Request IP3-ISI-RR-13 for Indian Point Nuclear Generating Unit No. 3 (Indian Point Unit 3) to the U.S. Nuclear Regulatory Commission (NRC). Entergy Nuclear Operations, Inc., proposed an alternative to the requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," 2001 Edition through 2003 Addenda.
The proposed alternative would allow the licensee to extend the current 10-year lnservice Inspection (ISi) interval 12 months beyond the one year extension allowed by the ASME Code,Section XI, paragraphs IWA-2430(d)(1) and (d)(3). Specifically, pursuant to Title 10 of the Code of Federal Regulations ( 10 CFR) 50.55a(z)( 1), the licensee requested to use the alternative on
- the basis that the alternative provides an acceptable level of quality and safety.
2.0 REGULATORY EVALUATION
Adherence to Section XI of the ASME Code is mandated by 10 CFR 50.55a(g)(4), which states, in part, that ASME Code Class 1, 2, and 3 components will meet the requirements, except the design ar:,d access provisions and the pre-service examination requirements, set forth in ASME Code,Section XI.
Paragraph 10 CFR 50.55a(z) states that alternatives to the requirements of paragraphs (b) through (h) of 10 CFR 50.55a or portions thereof may be used when authorized by the Director, Office of Nuclear Reactor Regulation. A proposed alternative must be submitted and authorized prior to implementation. The licensee must demonstrate that: (1) the proposed alternatives provide an acceptable level of quality and safety, or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Enclosure
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for Entergy to request the use of an alternative and the NRC to authorize the proposed alternative.
3.0 TECHNICAL EVALUATION
3.1 ASME Code Component(s) Affected The affected components are contained in the Indian Point Unit 3 fourth 10-year ISi/Containment lnservice Inspection (CII) Program Plan. Specifically, the affected components are the Examination Categories of the ASME Code,Section XI, which are the Class 1, 2, and 3 pressure retaining components and their supports in accordance with subsections IWA, IWB, IWC, IWD, IWE, IWF, IWL and the Risk Informed ISi Program Examination Category R-A.
3.2 Applicable ASME Code Edition and Addenda The Code of Record for the fourth 10-year ISi interval at Indian Point Unit 3 is the ASME Code,Section XI, 2001 Edition with 2003 Addenda.
3.3 Applicable ASME Code Requirements Paragraph IWA-2430(d) of ASME Code,Section XI, requires compliance with 10-year intervals for components inspected under Program B, and paragraphs IWA-2430(d)(1) and (d)(3) allow an extension of the interval by as much as one year. The Indian Point Unit 3 Fourth 10-year ISi interval is defined by Inspection Program B (IWA-2432).
3.4 Licensee's Reason for Request The current Indian Point Unit 3 fourth 10-Year Interval ISI/CII Program Plan became effective on July 21, 2009, and is scheduled to expire on July 20, 2020. The Indian Point Unit 3 ISI/CII Program Plan established the fourth 10-year interval in accordance with 10 CFR 50.55a and is compliant with ASME Code,Section XI. As a result of the recent decision to permanently cease operation of Indian Point Unit 3 by April 30, 2021, the licensee requests approval to extend the expiration date for the end of the Indian Point Unit 3 fourth 10-year interval ISI/CII Program Plan from July 20, 2020 to July 20, 2021. The 12-month interval extension of the ISI/CII Program Plan will allow the licensee to more effectively schedule and perform the inspections to be completed during refueling outage (RFO) 20 (spring 2019).
3.5 Licensee's Proposed Alternative and Basis for Use The licensee proposes to extend the current fourth 10-year ISi interval by 12 months (in addition to the one-year extension allowed by ASME Code,Section XI) to accommodate the recent decision to cease operation of Indian Point Unit 3 by April 30, 2021. This 12-month extension will allow one additional RFO (RFO 21) to complete the remainder of the inspections scheduled for the fourth 10-year interval, if the plant does not shutdown. The licensee states that these inspections would only be completed if the current plan to permanently cease operation of Indian Point Unit 3 is changed in the future.
The licensee has performed the inspections and non-destructive examinations of the applicable Indian Point Unit 3 systems, structures, and components (SSCs) to the extent practical and possible as permitted by existing designs, equipment arrangements, available access, and
radiological conditions for the fourth 10-year interval from 2009 to 2017. The inspections and examinations completed to date provide assurance that the ISi Program and applicable SSCs have been maintained in accordance with the requirements in ASME Code,Section XI.
The ASME Code,Section XI, requires that 100 percent of the scheduled inspections be completed during the 10-year ISi interval and that pre-determined percentages be completed during each of the three inspection periods within the interval. The percentage of examinations required for Indian Point Unit 3 by ASME Code,Section XI, Table IWB-2412-1, were completed during the first two periods of the current fourth 10-year interval and first refueling outage of the third period. The licensee stated that the proposed extension of the current 10-year inspection interval will not result in a decrease in safety because the inspections completed to date have not identified any active degradation mechanisms which could impact the SSCs affected by this relief request. Not having to perform the remainder of the fourth interval inspections will give the licensee additional flexibility and optimization of the required resources and a reduction in the personnel radiation exposure associated with performing these inspections. The expected personnel radiation dose avoidance by not performing these inspections is 1.0 person Roentgen equivalent man (Rem).
3.6 NRC Staff Evaluation As indicated in the licensee's submittal, the fourth 10-year ISi interval started on July 21, 2009.
The original end date scheduled for the fourth 10-year ISi interval is July 20, 2019. However, the licensee extended the original end date of the fourth ISi 10-year ISi interval to July 20, 2020, which does not require NRC approval because this action is permitted by the ASME Code,Section IX, IWA-2430(d)(1) and (d)(3). In the relief request, the licensee is proposing to extend the current fourth 10-year ISi interval by an additional 12 months from July 20, 2020 to July 20, 2021 to accommodate the recent decision to cease operation of Indian Point Unit 3 by April 30, 2021.
The inspection schedule for the Indian Point Unit 3 fourth 10-year interval is divided into three periods. The first period is from July 21, 2009 to July 20, 2013 which covers RFO 16 (spring 2011) and RFO 17 (spring 2013). The second period is from July 21, 2013 to July 20, 2016, which covers RF0-18 (spring 2015). The proposed third period is from July 21, 2016 to July 20, 2021 which covers RFO 19 (spring 2017), RFO 20 (spring 2019) and RFO 21 (spring 2021).
There are two more refueling outages remaining in the fourth 10-year ISi interval: RF0-20 and RF0-21.
Approximately one-third of the 10-year ISi's are normally scheduled to be completed during each period, except for items that may be deferred until the end of the interval. The NRC staff noted that during the first two periods of the current fourth 10-year interval and RFO 19 of the third period, the licensee completed the pre-determined percentage of the inspections required by ASME Code,Section XI, Table IWB-2412-1, and that their inspections to-date have not identified any active degradation mechanisms which could impact the SSCs affected by this relief request. The NRC staff noted that the licensee has been in full compliance in its ISl's for their first two periods.
As stated above, the licensee will complete all required inspections in the fourth 10-year ISi interval to satisfy the ASME Code,Section XI by July 20, 2021, if the current plan to permanently cease operation of Indian Point Unit 3 by April 30, 2021, is changed. The NRC staff noted that inspections such as the thermal fatigue inspections identified as a result of industry operating experience and any follow up inspections from previously identified
non-conforming conditions will still be completed as required by Materials Reliability Program No. 146, Revision 1, and the ASME Code,Section XI.
The NRC staff concludes that based on: (1) the licensee's current plan to complete all required inspections if they do not cease operation before the proposed end date of the fourth ISi 10-year interval; (2) the licensee's full compliance with ASME Code,Section XI, Table IWB-2412-1; and (3) their operating experience showing no active degradation on SSCs; there is reasonable assurance of structural integrity of affected components covered by IP3-ISI-RR-13 for the proposed ISi interval extension.
4.0 CONCLUSION
As set forth above, the NRC staff determines that the licensee has demonstrated that the proposed alternative provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)( 1). Therefore, the NRC staff approves the use of RR 13 at Indian Point Unit 3 for the fourth 10-year ISi interval until July 20, 2021.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: D. Render D~e: July 18, 2018
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 - SAFETY EVALUATION FOR RELIEF REQUEST IP3-ISI-RR-13 REGARDING FOURTH TEN-YEAR INSERVICE INSPECTION INTERVAL EXTENSION (EPID L-2018-LLR-0128)
DATED JULY 18, 2018 DISTRIBUTION:
PUBLIC JBowen, OEDO PM File Copy LBurkhart, OEDO RidsNrrDmlrMphb Resource RidsACRS_MailCTR Resource RidsNrrDeEseb Resource RidsRgn1 MailCenter Resource RidsNrrDorlLpl1 Resource DRender, NRR RidsNrrLAKGoldstein Resource SCaudrado de Jesus RidsNrrPMlndianPoint Resource ADAMS Access1on No.: ML181938030 *b1y e-ma1 OFFICE NRR/DORL/LPL 1/PM NRR/D0RL/LPL2-1/LA N RR/DM LR/MPH B/BC* NRR/DORL/LPL 1/BC NAME RGuzman KGoldstein SRuffin JDanna DATE 7/12/18 7/13/18 6/12/18 7/18/18 OFFICIAL RECORD COPY