Category:Code Relief or Alternative
MONTHYEARML21299A0032021-10-28028 October 2021 And Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML21054A3302021-02-24024 February 2021 Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19039A1492019-02-25025 February 2019 Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18251A0042018-09-18018 September 2018 Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127) ML18193B0302018-07-18018 July 2018 Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval Extension ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18099A3732018-04-0909 April 2018 04/09/2018 E-mail from R. Guzman to R. Walpole, Verbal Authorization for Relief Request IP2-ISI-RR-06 ML18059A1562018-03-0606 March 2018 Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4 ML18005A0662018-01-23023 January 2018 Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML17069A2832017-03-16016 March 2017 Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification Requirement ML16358A4442017-01-11011 January 2017 Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3 ML16167A0812016-07-15015 July 2016 Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16053A0252016-03-0303 March 2016 IP2-ISI-44-18, Relief from the Requirements of the ASME Code CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML14198A3312014-07-23023 July 2014 Safety Evaluation for Relief Request IP3-ISI-RR-06 for Reactor Vessel Weld Examinations (Tac No. MF3345) NL-13-041, Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency Extension2013-02-20020 February 2013 Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency Extension ML12334A3172012-12-0303 December 2012 Relief Request IP2-ISI-RR-15 - Proposed Alternative to the Use of a Weld Reference System NL-12-065, 2012 Summary Report for In-Service Inspection and Repairers and Replacements2012-06-13013 June 2012 2012 Summary Report for In-Service Inspection and Repairers and Replacements NL-12-069, Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System2012-05-23023 May 2012 Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System ML11105A1222011-04-25025 April 2011 Relief from the Requirements of the ASME Code to Perform Essentially 100 Percent Volumetric Examination of the Weld and Adjacent Base Material for the Third 10-Year Inservice Inspection ML11109A0162011-04-25025 April 2011 Relief Request No. IP2-ISI-RR-12, Reactor Vessel Shell-To-Flange Weld Inspection for the Fourth 10-Year Inservice Inspection Interval (Tac No. ME5180) NL-10-136, Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval2010-12-14014 December 2010 Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval ML1017400482010-07-15015 July 2010 Relief Request RR-11 for the Fourth 10-Year Inservice Inspection Interval NL-10-061, CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval2010-07-0505 July 2010 CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval ML1015303122010-06-0707 June 2010 Relief Request RR-02 for the Fourth 10-Year Inservice Inspection Interval NL-09-022, Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program2009-02-0606 February 2009 Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program NL-09-0111, Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program2009-01-22022 January 2009 Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program NL-09-003, Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination2009-01-20020 January 2009 Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination NL-08-096, Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses2008-07-0808 July 2008 Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses ML0721304872007-09-0505 September 2007 Relief Request No. RR-01 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0602600762006-02-0808 February 2006 Relief Request (RR) No. 74 NL-05-0720, Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld Examination2005-06-0808 June 2005 Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld Examination ML0509401362005-04-0404 April 2005 Relief, Relaxation of First Revised Order on Reactor Vessel Nozzles ML0507700102005-03-18018 March 2005 Relaxation of First Revised Order on Reactor Vessel Nozzles ML0427406642004-10-14014 October 2004 Relief Request Nos. R-33, R-71, R 3-40(A) and R-41, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 2 and No. 3 and Pilgrim Nuclear Power Station ML0427406282004-10-14014 October 2004 Relief Request Nos. 65, 66, 3-34 and 3-35 Regarding Alternative Nondestructive Examination Qualification Requirements ML0425203922004-10-0505 October 2004 Relief, Requirements of American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section III, 1965 Edition, & Section XI, 1989 Edition, for Repair & Inspection of Reactor Pressure Vessel Head Penetrations ML0418901542004-07-0707 July 2004 Relief, Relief Request Nos. RR-67 and RR 3-36, TAC Nos. MC1698 and MC1699 ML0410700882004-07-0606 July 2004 Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600 ML0408205162004-03-22022 March 2004 Relief Request Nos. RR-68, RR3-37, and PRR-34 (TAC MC1559, MC1560, & MC1561) ML0408506682004-03-19019 March 2004 Relief Request Nos. 70 and 3-39 Regarding Alternative Depth Sizing Criteria.(Tac MC1696 & MC1697) ML0408600062004-03-19019 March 2004 Relief Request No. RR 63 Regarding risk-informed Inservice Inspection Program ML0335000092003-12-16016 December 2003 Inservice Testing Program Relief Request Nos. 47 and 48, MB9111 and MB9112 2021-02-24
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] Category:Safety Evaluation
MONTHYEARML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23243A8452023-11-30030 November 2023 Enclosure 3: Issuance - IP LAR for SE Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23050A0022023-11-17017 November 2023 Enclosure 2 - Safety Evaluation for Indian Point Unit 2 License Amendment Request to Modify Technical Specifications for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23067A0822023-11-0101 November 2023 Enclosure 2 - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Safety Exemption Evaluation for Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications ML21054A3302021-02-24024 February 2021 Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML20297A3332020-11-23023 November 2020 Enclosure 3, Safety Evaluation for Transfer of Renewed Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline ML20100H9922020-06-0202 June 2020 Issuance of Amendment No. 269 Proposed Technical Specification Changes to City Water Surveillance Requirement and Condensate Storage Tank Required Action A.1 ML20122A2622020-05-0404 May 2020 Correction to Amendment No. 294 Dated April 28, 2020, Permanently Defueled Technical Specifications ML20081J4022020-04-28028 April 2020 Issuance of Amendment No. 294 Permanently Defueled Technical Specifications ML20078L1402020-04-15015 April 2020 Issuance of Amendment Nos. 62, 293, and 268 Changes to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML20099A1822020-04-13013 April 2020 Issuance of Relief Request IP3-IST-RR-001 - Alternative to Certain Requirements of the ASME Code for Extension of the Fourth 10-Year Inservice Test Interval ML20071Q7172020-04-10010 April 2020 Issuance of Amendment Nos. 292 and No. 267 Changes to Technical Specification Sections 1.1, 4.0, and 5.0 for a Permanently Defueled Condition ML19333B8682019-12-18018 December 2019 Approval of Certified Fuel Handler Training and Retraining Program ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19209C9662019-09-0404 September 2019 Issuance of Amendment No. 290 Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool ML19065A1012019-03-21021 March 2019 Issuance of Amendment No. 61 and No. 289 Deletion of License Conditions Related to Decommissioning Trust Provision ML19039A1492019-02-25025 February 2019 Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4 ML18337A4222018-12-20020 December 2018 Issuance of Amendment No. 265 One-Time Extension of 10 CFR Part 50, Appendix J, Type a, Integrated Leakage Rate Test Interval ML18251A0042018-09-18018 September 2018 Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127) ML18193B0302018-07-18018 July 2018 Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval Extension ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18142A4312018-05-31031 May 2018 Safety Evaluation for Relief Request IP2-ISI-RR-06 Approval of Alternative to Use Embedded Weld Repair ML18059A1562018-03-0606 March 2018 Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4 ML18005A0662018-01-23023 January 2018 Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17348A6952018-01-11011 January 2018 Issuance of Amendment Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank (CAC No. MF9578; EPID L-2017-LLA-0202) ML17320A3542017-12-22022 December 2017 Issuance of Amendments Amendment of Inter-Unit Transfer of Spent Fuel (CAC Nos. MF8991 and MF8992; EPID L-2016-LLA-0039) ML17315A0002017-12-0808 December 2017 Issuance of Amendments Cyber Security Plan Implementation Schedule (CAC Nos. MF9656, MF9657, and MF9658; EPID: L-2017-LLA-0217) ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML17065A1712017-03-27027 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17069A2832017-03-16016 March 2017 Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification Requirement ML16336A4922017-01-27027 January 2017 Transmittal Letter: Order Approving Transfer of Master Decommissioning Trust Funds for Indian Point, No. 3 & FitzPatrick Nuclear Plant from the Power Authority of the State of New York to Entergy Nuclear Operations, Inc. ML16358A4442017-01-11011 January 2017 Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3 ML16215A2432016-11-15015 November 2016 Issuance of Amendment Nos. 285 and 261 Conditional Exemption from End-of-Life Moderator Temperature Coefficient ML16179A1782016-09-14014 September 2016 Safety Evaluation for Relief Request IP2-ISI-RR-01, Examination of Upper Pressurizer Welds ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16167A0812016-07-15015 July 2016 Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600 ML16147A5192016-07-14014 July 2016 Safety Evaluation for Relief Request IP2-ISI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16064A2152016-04-12012 April 2016 Issuance of Amendments Cyber Security Plan Implementation Schedule 2023-05-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 6, 2018 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - SAFETY EVALUATION FOR RELIEF REQUEST IP2-ISI-RR-05 ALTERNATIVE EXAMINATION VOLUME REQUIRED BY ASME CODE CASE N-729-4 (EPID L-2017-LLR-0157)
Dear Sir or Madam:
By letter dated December 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17362A038), Entergy Nuclear Operations, Inc. (the licensee) submitted Relief Request IP2-ISI-RR-05 to the U.S. Nuclear Regulatory Commission (NRC). Entergy Nuclear Operations, Inc. requested to implement a proposed alternative to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(g)(6)(ii)(D), which mandates the use of the American Society of Mechanical Engineers (ASME) Code Case N-729-4, "Alternative Examination Requirements for PWR [Pressurized-Water Reactor] Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds," with conditions. The request pertains to the volumetric and/or surface examinations of reactor vessel upper head nozzles, most of which are used to house control rod drive mechanisms of the PWR vessel at Indian Point Nuclear Generating Unit No. 2 (Indian Point 2). Specifically, pursuant to 10 CFR 50.55a(z)(2), the licensee requested to use the proposed alternative in Relief Request IP2-ISI-RR-05 on the basis that complying with the specified requirement would result in hardship or unusual difficulty, without a compensating increase in the level of quality and safety.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC staff authorizes the proposed alternative for the fifth 10-year inservice inspection interval at Indian Point 2, which began on June 1, 2016, and is scheduled to end on May 31, 2026.
All other ASME Code requirements for which relief was not specifically requested and approved remain applicable.
If you have any questions concerning this matter, please contact the Indian Point 2 Project Manager, Mr. Richard Guzman, at (301) 415-1030 or Richard.Guzman@nrc.gov.
Sincerely,
~~
~ G. Danna, Chief Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO RELIEF REQUEST IP2-ISI-RR-05 REGARDING ASME CODE CASE N-729-4 ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247
1.0 INTRODUCTION
By letter dated December 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17362A038), Entergy Nuclear Operations, Inc. (the licensee) submitted Relief Request IP2-l!SI-RR-05 for U.S. Nuclear Regulatory Commission (NRC) review and approval.
The licensee requested to implement a proposed alternative to the requirements of Title 10 of the Code of Federal Regulations (1 O CFR) Section 50.55a(g)(6)(ii)(D), which mandates the use of the American Society of Mechanical Engineers (ASME) Code Case N-729-4, "Alternative Examination Requirements for PWR [Pressurized-Water Reactor] Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds," with conditions. The request pertains to the volumetric and/or surface examinations of reactor vessel upper head nozzles, most of which are used to house control rod drive mechanisms of the PWR vessel at Indian Point Nuclear Generating Unit No. 2 (Indian Point 2).
Specifically, pursuant to 10 CFR 50.55a(z)(2), the licensee requested to use the proposed alternative in Relief Request IP2-ISI-RR-05 on the basis that complying with the specified requirement would result in hardship or unusual difficulty, without a compensating increase in the level of quality and safety.
2.0 REGULATORY EVALUATION
In accordance with 10 CFR 50.55a(z)(2), the licensee proposed to use an alternative to the requirements of 10 CFR 50.55a(g)(6)(ii)(D), which mandate the use of ASME Code Case N-729-4, with conditions.
In accordance with 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components, including supports, must meet the requirements, except the design and access provisions and the preservice examination requirements set forth in the ASME Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," to the extent practical within the*
limitations of design, geometry and materials of construction of the components.
As stated in 10 CFR 50.55a(z), alternatives to the requirements of paragraph (g) of 10 CFR 50.55a may be used when authorized by the NRC if the licensee demonstrates that (1) the proposed alternatives would provide an acceptable level of quality and safety or Enclosure
(2) compliance with the specified requirements would result in hardship or unusual difficulty, without a compensating increase in the level of quality and safety.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request, and the NRC to authorize, the alternative requested by the licensee.
3.0 TECHNICAL EVALUATION
3.1. ASME: Code Components ASME Code Class: 1 Code Item Number: 84.20 of Table 1 of ASME Code Case N-729-4
==
Description:==
ASME Code Case N-729 examination volume for all reactor pressure vessel head penetration nozzles 3.2. Applicable Code Edition and Addenda The Code of Record for the fifth 10-year inservice inspection (ISi) interval for Indian Point 2 is the 2007 Edition/2008 Addenda. For the components under consideration, ISi is governed by 10 CFR 50.55,a(g)(6)(ii)(D), which mandates the use of ASME Code Case N-729-4, with conditions.
3.3. Inspection Requirements for the Component under Consideration The requirements of 10 CFR 50.55a(g)(6)(ii)(D)(3) stipulate that the licensee perform a volumetric and/or surface examination of essentially 100 percent of the required volume, or equivalent surfaces of the nozzle tube, as identified by Figure 2 of ASME Code Case N-729-4.
Figure 2 identifies the required volume of the tube to be inspected, a distance "a" above the highest point of the root of the J-groove weld to a distance "a" below the lowest point of the toe of the J-groove weld. Distance "a" is equal to 1.5 inches for incidence angle less than or equal to 30 degrees to the horizontal plane, or 1.0 inch for incidence angle greater than 30 degrees to the horizontal plane.
3.4. Proposed Alternative The licensee proposed to perform a volumetric inspection of each penetration nozzle from a distance "a" above the J-groove weld and the minimum required ultrasonic test (UT) coverage below the J-groove weld as defined in Table 1 below.
Ta bl e 1: Minimum nspect1on Coverage Requirement Nozzle Penetration Nozzle Angle Minimum Required UT Time, Effective Full Power No. of Incidence Coverage Below J-groove Years to Reach the Lowest
{degrees} Weld with >2 Effective Full Point of the Toe of the Power Years by Crack J-groove Weld {year)
Growth Evaluation {inches) 1 throuah 25 0 to 23.3 0.55 4.6 26 through 69 24.8 to 38.6 0.45 4.4 70 throuah 8*1 44.3 0.25 8.4 82 throuah 89 45.4 0.25 6.8 90 through 97 48.7 0.18 5.0
3.5. Licensee's Technical Basis The licensee provided a basis for the adequacy of the proposed alternative based on three components: (1) a finite element stress analysis of the nozzles near the J-groove weld; (2) a postulation of an initial flaw size and crack growth rate based on the stress analysis; and (3) a proposal for an alternate inspection area such that the postulated crack is not expected to grow sufficiently to reach the toe of the J-groove weld prior to the next inspection, which is scheduled for the next refueling outage in 2 years.
As indicated by the licensee, surface examination techniques are an available option to meet the current regulatory requirements. However, radiation dose rates under the head near the J-groove weld areas are expected to be in the 3 to 5 roentgen equivalent man (rem)/hour (hr) range. Additionally, the area under the head is posted as a locked high radiation area and high contamination area. Performance of a surface exam is considered a hardship as a result of the high radiation exposure.
The licensee stated that, in all cases, the inspection requirements of Figure 2 of the Code Case for inspection above the J-groove could be met. Based on the stress analysis and crack growth rate predictions, the licensee proposed minimum UT inspection coverage requirements. These values are contained in Table 1 above. The licensee also confirmed that the proposed UT inspection area for each of the nozzles is at least as large as the required inspection area as listed in the table.
3.6 Duration of Proposed Alternative The licensee requested relief for the fifth 10-year ISi Interval, which is currently scheduled to end on May 31, 2026.
- 3. 7 NRC Staff Evaluation The NRC staff finds that the inspection requirements found in 10 CFR 50.55a(g)(6)(ii)(D)(3) are the appropriate inspection requirements for the components identified in the licensee's relief request.
The NRC staff reviewed the licensee's basis for requesting relief from the inspection requirements for these components. The NRC staff finds that satisfactory UT inspection of the threaded regions at the lower ends of the penetration nozzles is unlikely. The NRC staff also finds that the distance between the toe of the J-groove welds and the top of the threaded region of the nozzle is, in some cases, less than the inspection distance required by Figure 2 of Code Case N-729-4. The NRC staff also finds that, although surface examination of the components is an acceptable option, the length of time required to perform the inspection, in combination with the projected dose rate (3 to 5 rem/hr), would result in a significant radiation exposure to the individuals performing the inspection.
The NRC staff reviewed the basis upon which the licensee's proposed alternative inspection area is based. This basis relies upon stress analyses and crack growth projections to predict that a crack, which lies outside the proposed inspection area in one inspection, cannot reasonably be expected to grow to the toe of the J-groove weld prior to the next scheduled
inspection. Cracks in the nozzle material below the J-groove weld are not part of the pressure boundary of the reactor coolant system and only pose a loose parts condition.
The NRC staff reviewed the minimum inspection coverage. The NRC staff noted that the end of the required inspection area lies at the postulated location of the crack. Based on the values reported in Table 1 above, this point is either 0.18, 0.25, 0.45, or 0.55 inches below the toe of the J-groove weld. The licensee's flaw analysis predicted the length of time required for the postulated crack to grow from the uninspected area to the toe of the J-groove weld. These projections are reported in Table 1 as the time and effective full power year to reach the toe of the J-groove weld. The NRC staff performed a series of independent flaw evaluations and determined that an inspection area of 0.18, 0.25, 0.45, or 0.55 inches, respectively, is adequate because, in all instances, the time required for the postulated crack to grow the necessary distance to reach the toe of the J-groove weld exceeds the time interval between inspections.
The NRC staff reviewed the licensee's proposal to determine whether the specified requirement created a hardship. The NRC staff noted that meeting the specified requirement through the use of internal UT inspection is not possible for all penetrations. The NRC staff also noted that the specified requirement could be met through the use of a manual surface exam, but that the length of time required to perform the inspection, in combination with the projected dose rate (3 to 5 rem/hr), would result in a significant radiation exposure to the inspector. The NRC staff considers this to be a hardship.
Given that the licensee's flaw analysis demonstrates that a hypothetical flaw in the area of missed coverage will not grow into the reactor coolant pressure boundary during the period of operation between required inspections, the NRC staff finds that the licensee has demonstrated that the proposed alternative provides reasonable assurance of structural integrity and of public health and safety. Additionally, given the hardship described above, the NRC staff finds that compliance with the specified requirement would result in hardship or unusual difficulty, without a compensating increase in the level of quality and safety. Therefore, the NRC staff finds a sufficient basis to authorize relief under 10 CFR 50.55a(z)(2).
4.0 CONCLUSION
As set forth above, the NRC staff determined that the proposed alternative, Relief Request IP2-ISI-RR-05, provides reasonable assurance of structural and leaktightness of the subject component and that complying with the specified requirement would result in hardship or unusual difficulty, without a compensating increase in the level of quality or safety.
Accordingly, the staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, pursuant to 10 CFR 50.55a(z)(2), the NRC staff authorizes the use of Relief Request IP2-ISI-RR-05 at Indian Point 2 for the fifth 10-year ISi interval, which started on June 1, 2016, and is scheduled to end May 31, 2026.
All other requirements for which relief was not specifically requested and approved in this relief request remain applicable, including the third party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: J. Collins Date: March 6, 2018
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - SAFETY EVALUATION FOR RELIEF REQUEST IP2-ISI-RR-05 ALTERNATIVE EXAMINATION VOLUME REQUIRED BY ASME CODE CASE N-729-4 (EPID L-2017-LLR-0157)
DATED MARCH 6, 2018 DISTRIBUTION:
PUBLIC JBowen, OEDO RidsNrrDmlrMvib Resource LBurkhart, OEDO RidsNrrDorlLpl1 Resource RidsACRS_MailCTR Resource RidsNrrLALRonewicz Resource RidsRgn1 MailCenter Resource RidsNrrPMlndianPoint Resource JCollins, NRR ADAMS Access1on No.: ML18059A156 *b1y e-ma1*1 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DMLR/MPHB/BC* NRR/DORL/LPL 1/BC NAME RGuzman LRonewicz DAIiey JDanna DATE 03/05/2018 03/01/2018 02/26/2018 03/06/2018 OFFICIAL RECORD COPY