ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code
ML21054A33024 February 2021Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection RequirementTime of Discovery
Nondestructive Examination
VT-2
Through-Wall Leak
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)12 August 2020Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)Nondestructive Examination
Incorporated by reference
ML19254A60319 September 2019Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1
ML19039A14925 February 2019Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4Incorporated by reference
Dissimilar Metal Weld
DM weld
CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 131 January 2019Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Nondestructive Examination
Dissimilar Metal Weld
ML18251A00418 September 2018Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127)Probabilistic Risk Assessment
Large early release frequency
DM weld
ML18193B03018 July 2018Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval ExtensionNon-Destructive Examination
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
ML18099A3739 April 201804/09/2018 E-mail from R. Guzman to R. Walpole, Verbal Authorization for Relief Request IP2-ISI-RR-06
ML18059A1566 March 2018Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4Locked High Radiation Area
ML18005A06623 January 2018Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection ProgramVT-2
Incorporated by reference
Pressure Boundary Leakage
CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 117 November 2017Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1Nondestructive Examination
Finite Element Analysis
Through-Wall Leak
ML17174B14412 July 2017Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME CodeNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML17069A28316 March 2017Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification RequirementIncorporated by reference
DM weld
ML16358A44411 January 2017Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3Through-Wall Leak
ML16167A08115 July 2016Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600Incorporated by reference
ML16096A2696 June 2016Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1Functionality Assessment
Liquid penetrant
ML16053A0253 March 2016IP2-ISI-44-18, Relief from the Requirements of the ASME CodeIncorporated by reference
Dissimilar Metal Weld
CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D5 June 2015Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, DivisionLiquid penetrant
ML14198A33123 July 2014Safety Evaluation for Relief Request IP3-ISI-RR-06 for Reactor Vessel Weld Examinations (Tac No. MF3345)Probabilistic Risk Assessment
Incorporated by reference
NL-13-041, Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency Extension20 February 2013Relief Request IP2-ISI-RR-17: Code Case N-770-1 Weld Inspection Frequency ExtensionDissimilar Metal Weld
ML12334A3173 December 2012Relief Request IP2-ISI-RR-15 - Proposed Alternative to the Use of a Weld Reference SystemIncorporated by reference
NL-12-065, 2012 Summary Report for In-Service Inspection and Repairers and Replacements13 June 20122012 Summary Report for In-Service Inspection and Repairers and ReplacementsLiquid penetrant
NL-12-069, Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System23 May 2012Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System
ML11105A12225 April 2011Relief from the Requirements of the ASME Code to Perform Essentially 100 Percent Volumetric Examination of the Weld and Adjacent Base Material for the Third 10-Year Inservice InspectionNondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML11109A01625 April 2011Relief Request No. IP2-ISI-RR-12, Reactor Vessel Shell-To-Flange Weld Inspection for the Fourth 10-Year Inservice Inspection Interval (Tac No. ME5180)Incorporated by reference
NL-10-136, Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval14 December 2010Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval
ML10174004815 July 2010Relief Request RR-11 for the Fourth 10-Year Inservice Inspection IntervalNon-Destructive Examination
Nondestructive Examination
VT-2
Incorporated by reference
NL-10-061, CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval5 July 2010CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection IntervalVT-2
Dissimilar Metal Weld
ML1015303127 June 2010Relief Request RR-02 for the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
NL-09-022, Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program6 February 2009Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program
NL-09-0111, Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection Program22 January 2009Submittal of Relief Requests No. 3-45, 3-46, 3-47(I) and 3-48 to Support the Unit 3 Refuel Outage 15 Inservice Inspection ProgramBoric Acid
Nondestructive Examination
Locked High Radiation Area
Pressure Boundary Leakage
NL-09-003, Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination20 January 2009Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld ExaminationLarge early release frequency
NL-08-096, Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses8 July 2008Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and AnalysesProbabilistic Risk Assessment
ML0721304875 September 2007Relief Request No. RR-01Hydrostatic
VT-2
Incorporated by reference
NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations14 June 2006Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic ExaminationsNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML0602600768 February 2006Relief Request (RR) No. 74Hydrostatic
VT-2
Incorporated by reference
Pressure Boundary Leakage
NL-05-0720, Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld Examination8 June 2005Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Reactor Vessel Weld ExaminationProbabilistic Risk Assessment
Dissimilar Metal Weld
ML0509401364 April 2005Relief, Relaxation of First Revised Order on Reactor Vessel NozzlesHydrostatic
Nondestructive Examination
Finite Element Analysis
ML05077001018 March 2005Relaxation of First Revised Order on Reactor Vessel NozzlesHydrostatic
Nondestructive Examination
Finite Element Analysis
Liquid penetrant
Scaffolding
ML04274066414 October 2004Relief Request Nos. R-33, R-71, R 3-40(A) and R-41, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 2 and No. 3 and Pilgrim Nuclear Power StationIncorporated by reference
ML04274062814 October 2004Relief Request Nos. 65, 66, 3-34 and 3-35 Regarding Alternative Nondestructive Examination Qualification RequirementsNon-Destructive Examination
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML0425203925 October 2004Relief, Requirements of American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section III, 1965 Edition, & Section XI, 1989 Edition, for Repair & Inspection of Reactor Pressure Vessel Head PenetrationsNondestructive Examination
Incorporated by reference
Code Reconciliation
ML0418901547 July 2004Relief, Relief Request Nos. RR-67 and RR 3-36, TAC Nos. MC1698 and MC1699Incorporated by reference
ML0410700886 July 2004Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600
ML04082051622 March 2004Relief Request Nos. RR-68, RR3-37, and PRR-34 (TAC MC1559, MC1560, & MC1561)Boric Acid
Non-Destructive Examination
Incorporated by reference
ML04085066819 March 2004Relief Request Nos. 70 and 3-39 Regarding Alternative Depth Sizing Criteria.(Tac MC1696 & MC1697)Nondestructive Examination
Incorporated by reference
ML04086000619 March 2004Relief Request No. RR 63 Regarding risk-informed Inservice Inspection ProgramProbabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Dissimilar Metal Weld
ML03350000916 December 2003Inservice Testing Program Relief Request Nos. 47 and 48, MB9111 and MB9112Incorporated by reference