Action Request - Corrective Action Program (CAP) (CAP064648)
ML062650395
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/18/2005
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
CAP064648, FOIA/PA-2006-0113
Download: ML062650395 (1)


Text

TeamTrack Reports Page 10 of 47 NMC > Sites > Point Beach -Action Request > Corrective Actn Program (CAP) AR 4! C " Section 1 Activity Request Id: qCAP06464484 Activity Type: CAP Submit Date: 5/18/2005 10:59:43 AM I One Line

Description:

24-Hour FFD ENS Report Issued by NRC Operations Center Contained Error Detailed

Description:

5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: A 24-hour FFD ENS report (EN # 41705) was submitted by PBNP on 05/17105.

The report was submitted on the Unit I docket, as is the practice for reporting of events that are non-physical plant and not unit-specific, such as security events. The NRC daily report of the event indicated that Unit 2 was at full power. Unit 2 is shut down for its refueling outage. (Copies of the as -submitted ENS worksheet and daily event report are attached.)

Initiator:

FLENTJE, FRITZIE C Initiator Department:

SRL Licensing 1 Date/Time of Discovery:

5/18/2005 10:41:35 AM Datemme of Occurrence:

5/18/2005 10:41:35 AM Identified By: Site-identified System: (None) Equipment

  1. (1st): (None) Equipment Name (1st): (None) Equipment
  1. (2nd): (None) Equipment Name (2nd): (None) Equipment
  1. (3rd): (None) Equipment Name (3rd): (None) SitelUnit:

Point Beach -None Why did this occur?: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Data provided appears to have been modified following receipt at NRC Operations Center. Immediate Action Taken: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Discussed with PBNP NRC Senior Resident Inspector.

Item was also noted by NRC during daily phone call. NRC will follow up with Operations Center. Recommendations:

5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: None. Per NRC Senior Resident Inspector, no further action is required on the part of NMC. 0 SRO Review Required?:

N Section 2 Operability Status: Basis for Operability:

0 Unplanned TSAC Entry: NA 0 Compensatory Actions: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Not an operability issue.N 5/18/2005 12:30:26 PM -JESSESSKY, TOM: No system, structure or component important to nuclear safety is identified as being degraded.

N @ External Notification:

N C/In/lnnr