|
---|
Category:Letter
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:License-Operator
MONTHYEARIR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis ML17122A0872017-03-16016 March 2017 2017-03 Final Written Exam ML17122A0852017-03-16016 March 2017 2017-03 Final Operating Test ML17122A0842017-03-16016 March 2017 2017-03 Proposed Written Exam ML17122A0862017-03-16016 March 2017 2017-03 Final Outlines 2023-09-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis ML17122A0872017-03-16016 March 2017 2017-03 Final Written Exam ML17122A0842017-03-16016 March 2017 2017-03 Proposed Written Exam ML17122A0852017-03-16016 March 2017 2017-03 Final Operating Test ML17122A0812017-03-16016 March 2017 2017-03 Proposed Outline Comments ML17122A0832017-03-16016 March 2017 2017-03 Proposed Written Exam Comments 2023-09-01
[Table view] |
See also: IR 05000298/2008301
Text
December 17, 2007
Stewart B. Minahan, Vice
President-Nuclear and CNO
Nebraska Public Power District
72676 648A Avenue
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000298/2008301
Dear Mr. Minahan:
In a telephone conversation on September 25, 2007, between Messrs. Dave Werner, Training,
and Mark Haire, Chief Examiner, arrangements were made for the administration of licensing
examinations at Cooper Nuclear Station during the week of March 17, 2008.
As agreed during the telephone conversation, your staff will prepare the examinat
ions based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors," and the use of Revision 2 of NUREG-1123, "Knowl
edge and Abilities Catalog for Nuclear Power Plant Operators." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 2, 2008. The written examinations, operating tests, and supporting
reference materials identified in Attachment 2 to ES-201 will be due by February 1, 2008. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examination and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for onsite validation of the
examinations is required during the week of February 11, 2008.
In order to conduct the requested written examinations and
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV611 RYAN PLAZA DRIVE, SUITE 400ARLINGTON, TEXAS 76011-4005
Nebraska Public Power District
- 2 -Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for
this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,
and completing and reviewing the collection of information. Send comments on any aspect of
this collection of information, including suggestions for reducing the burden, to the Information
and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of
Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public
inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Werner has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mark Haire at 817-860-8117, or myself at
817-860-8159.
Sincerely,
/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety
Docket: 50-298
License: DPR-46
Nebraska Public Power District
- 3 -
DISTRIBUTION:
Gene Mace
Nuclear Asset Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
John C. McClure, Vice President
and General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, NE 68602-0499
David Van Der Kamp
Licensing Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Michael J. Linder, Director
Nebraska Department of
Environmental Quality
P.O. Box 98922
Lincoln, NE 68509-8922
Chairman
Nemaha County Board of Commissioners
Nemaha County Courthouse
1824 N Street
Auburn, NE 68305
Julia Schmitt, Manager
Radiation Control Program
Nebraska Health & Human Services
Dept. of Regulation & Licensing
Division of Public Health Assurance
301 Centennial Mall, South
P.O. Box 95007
Lincoln, NE 68509-5007
H. Floyd Gilzow
Deputy Director for Policy
Missouri Department of Natural Resources
P. O. Box 176
Jefferson City, MO 65102-0176
Nebraska Public Power District
- 4 -Director, Missouri State Emergency Management Agency
P.O. Box 116
Jefferson City, MO 65102-0116
Chief, Radiation and Asbestos
Control Section
Kansas Department of Health
and Environment
Bureau of Air and Radiation
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Melanie Rasmussen, State Liaison Officer/
Radiation Control Program Director
Bureau of Radiological Health
Iowa Department of Public Health
Lucas State Office Building, 5th Floor
321 East 12th Street
Des Moines, IA 50319
John F. McCann, Director, Licensing
Entergy Nuclear Northeast
Entergy Nuclear Operations, Inc.
440 Hamilton Avenue
White Plains, NY 10601-1813
Keith G. Henke, Planner
Division of Community and Public Health
Office of Emergency Coordination
930 Wildwood, P.O. Box 570
Jefferson City, MO 65102
Paul V. Fleming, Director of Nuclear
Safety Assurance
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Ronald L. McCabe, Chief
Technological Hazards Branch
National Preparedness Division
DHS/FEMA
9221 Ward Parkway
Suite 300
Kansas City, MO 64114-3372
Nebraska Public Power District
- 5 -Daniel K. McGhee, State Liaison Officer Bureau of Radiological Health
Iowa Department of Public Health
Lucas State Office Building, 5th Floor
321 East 12th Street
Des Moines, IA 50319
Ronald D. Asche, President
and Chief Executive Officer
Nebraska Public Power District
1414 15th Street
Columbus, NE 68601
Nebraska Public Power District
- 6 -Electronic distribution by RIV: Regional Administrator (EEC)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (NHT)
Branch Chief, DRP/C (MCH2)
Senior Project Engineer, DRP/C (WCW)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
Only inspection reports to the following:
DRS STA (DAP)
D. Pelton, OEDO RIV Coordinator (DLP)
ROPreports
CNS Site Secretary (SEF1)
SUNSI Review Completed: __Y____ADAMS: Yes No Initials: msh Publicly Available Non-Publicly Available Sensitive Non-Sensitive
S:\DRS\REPORTS\CNS2008301LTR-MSH2.doc SOE:OB C:OB MSHaire/lmb RELantz /RA/ /RA/ 12/6/07 12/17/07 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax