December 17, 2007
Stewart B. Minahan, Vice
President-Nuclear and CNO
Nebraska Public Power District
72676 648A Avenue
Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION 05000298/2008301
Dear Mr. Minahan:
In a telephone conversation on September 25, 2007, between Messrs. Dave Werner, Training,
and Mark Haire, Chief Examiner, arrangements were made for the administration of licensing
examinations at Cooper Nuclear Station during the week of March 17, 2008.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 9 of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors, and the use of Revision 2 of NUREG-1123, Knowledge and Abilities Catalog
for Nuclear Power Plant Operators. The NRCs regional office will discuss with your staff any
changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by January 2, 2008. The written examinations, operating tests, and supporting
reference materials identified in Attachment 2 to ES-201 will be due by February 1, 2008.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,
examinations, and tests before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examination and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for onsite validation of the
examinations is required during the week of February 11, 2008.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
611 RYAN PLAZA DRIV E, SUITE 400
ARLINGTON, TEXAS 76011-4005
Nebraska Public Power District
- 2 -
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for
this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,
and completing and reviewing the collection of information. Send comments on any aspect of
this collection of information, including suggestions for reducing the burden, to the Information
and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by internet electronic mail to BJS1@nrc.gov; and to the Desk
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of
Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
Thank you for your cooperation in this matter. Mr. Werner has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mark Haire at 817-860-8117, or myself at
817-860-8159.
Sincerely,
/RA/
Ryan E. Lantz, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-298
License: DPR-46
Nebraska Public Power District
- 3 -
DISTRIBUTION:
Gene Mace
Nuclear Asset Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
John C. McClure, Vice President
and General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, NE 68602-0499
David Van Der Kamp
Licensing Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Michael J. Linder, Director
Nebraska Department of
Environmental Quality
P.O. Box 98922
Lincoln, NE 68509-8922
Chairman
Nemaha County Board of Commissioners
Nemaha County Courthouse
1824 N Street
Auburn, NE 68305
Julia Schmitt, Manager
Radiation Control Program
Nebraska Health & Human Services
Dept. of Regulation & Licensing
Division of Public Health Assurance
301 Centennial Mall, South
P.O. Box 95007
Lincoln, NE 68509-5007
H. Floyd Gilzow
Deputy Director for Policy
Missouri Department of Natural Resources
P. O. Box 176
Jefferson City, MO 65102-0176
Nebraska Public Power District
- 4 -
Director, Missouri State Emergency
Management Agency
P.O. Box 116
Jefferson City, MO 65102-0116
Chief, Radiation and Asbestos
Control Section
Kansas Department of Health
and Environment
Bureau of Air and Radiation
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Melanie Rasmussen, State Liaison Officer/
Radiation Control Program Director
Bureau of Radiological Health
Iowa Department of Public Health
Lucas State Office Building, 5th Floor
321 East 12th Street
Des Moines, IA 50319
John F. McCann, Director, Licensing
Entergy Nuclear Northeast
Entergy Nuclear Operations, Inc.
440 Hamilton Avenue
White Plains, NY 10601-1813
Keith G. Henke, Planner
Division of Community and Public Health
Office of Emergency Coordination
930 Wildwood, P.O. Box 570
Jefferson City, MO 65102
Paul V. Fleming, Director of Nuclear
Safety Assurance
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Ronald L. McCabe, Chief
Technological Hazards Branch
National Preparedness Division
DHS/FEMA
9221 Ward Parkway
Suite 300
Kansas City, MO 64114-3372
Nebraska Public Power District
- 5 -
Daniel K. McGhee, State Liaison Officer
Bureau of Radiological Health
Iowa Department of Public Health
Lucas State Office Building, 5th Floor
321 East 12th Street
Des Moines, IA 50319
Ronald D. Asche, President
and Chief Executive Officer
Nebraska Public Power District
1414 15th Street
Columbus, NE 68601
Nebraska Public Power District
- 6 -
Electronic distribution by RIV:
Regional Administrator (EEC)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (NHT)
Branch Chief, DRP/C (MCH2)
Senior Project Engineer, DRP/C (WCW)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
Only inspection reports to the following:
D. Pelton, OEDO RIV Coordinator (DLP)
ROPreports
CNS Site Secretary (SEF1)
SUNSI Review Completed: __Y____ADAMS: Yes
No Initials: msh
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
S:\\DRS\\REPORTS\\CNS2008301LTR-MSH2.doc
SOE:OB
C:OB
MSHaire/lmb
RELantz
/RA/
/RA/
12/6/07
12/17/07
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax