MONTHYEARML24205A0842024-08-0606 August 2024 Exemption Title 10 of the Code of Federal Regulations Part 73 Safety Evaluation Report - Independent Spent Fuel Storage Installation L-24-006, Independent Spent Fuel Storage Installation, Supplement to the Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Supplement to the Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24121A2802024-05-23023 May 2024 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 1 (CAC No. 001028) L-23-009, Independent Spent Fuel Storage Installation, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Independent Spent Fuel Storage Installation, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program ML23109A3602023-04-19019 April 2023 Independent Spent Fuel Storage Installation, Annual Report of Occupational Radiation Exposure for 2022 L-23-002, Independent Spent Fuel Storage Installation Annual Radiological Environmental Monitoring Report for 20222023-03-16016 March 2023 Independent Spent Fuel Storage Installation Annual Radiological Environmental Monitoring Report for 2022 ML23047A3662023-02-16016 February 2023 Independent Spent Fuel Storage Installation - Response to NRC Request for Additional Information on Revision 1 to the Humboldt Bay ISFSI Quality Assurance Plan ML22340A5362022-12-19019 December 2022 Independent Spent Fuel Storage Installation (ISFSI) Revision 1 to Humbold Bay ISFSI Quality Assurance Plan ML22200A2422022-07-19019 July 2022 Independent Spent Fuel Storage Installation (ISFSI) - Revision 1 to Humboldt Bay ISFSI Quality Assurance Plan L-22-002, Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 20212022-04-27027 April 2022 Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 2021 L-22-001, Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 20212022-03-0808 March 2022 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 2021 ML22027A4682022-02-0404 February 2022 Acceptance Letter, Humboldt Bay ISFSI License Amendment Request 21-02 L-21-009, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan L-21-007, License Amendment Request 21-02 - Proposed Revisions to Humboldt Bay Independent Spent Fuel Storage Installation - Special Nuclear Materials License Number 2514 and Technical Specifications2021-12-14014 December 2021 License Amendment Request 21-02 - Proposed Revisions to Humboldt Bay Independent Spent Fuel Storage Installation - Special Nuclear Materials License Number 2514 and Technical Specifications ML21285A0492021-11-29029 November 2021 U.S. Nuclear Regulatory Commissions Analysis of Pacific Gas and Electrics Decommissioning Funding Status Report for Humboldt Bay Power Plant Facility, Unit 3, Docket No. 50-133 ML21295A2502021-11-18018 November 2021 Cover Letter from J Marshall to J Welsch Regarding Humboldt Bay Unit 3 License Termination ML21299A2532021-11-17017 November 2021 Completion of Scheduled Decommissioning Activities at the Humboldt Bay Power Plant, Unit 3 Near Eureka, California (License No. DPR-7) ML21313A3082021-11-0404 November 2021 Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11 and Changes to Technical Specification Bases and 10 CFR 72.48 Report of Changes, Tests, and Experiments for the Period of 10/2/2019 - 10/01/2021 L-21-006, Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 20212021-11-0404 November 2021 Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 2021 ML21299A2352021-11-0202 November 2021 Approval of Final Status Survey Reports for Remaining Facility Survey Units HBL-21-017, Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant2021-10-28028 October 2021 Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant HBL-21-016, Request to Terminate the Humboldt Bay Power Plant 10 CFR Part 50 License2021-10-21021 October 2021 Request to Terminate the Humboldt Bay Power Plant 10 CFR Part 50 License IR 07200027/20214012021-10-21021 October 2021 Independent Spent Fuel Storage Installation - Independent Spent Fuel Storage Installation Security Inspection Report 07200027/2021401 DCL-21-056, Pacific Gas & Electric Co - Proposed Revision to the Pacific Gas and Electric Company Quality Assurance Program Approval Form for Radioactive Material Packages No. 02022021-08-31031 August 2021 Pacific Gas & Electric Co - Proposed Revision to the Pacific Gas and Electric Company Quality Assurance Program Approval Form for Radioactive Material Packages No. 0202 ML21225A7752021-08-25025 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC - Hbpp, Unit 3 - Approval of Final Status Survey Reports for Multiple Survey Units ML21225A7722021-08-24024 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC - Humboldt Bay Power Plant, Unit 3 - Approval of Final Status Survey Reports for Trailer City Survey Units (OOL09-01 Through OOL09-10) ML21214A1002021-08-0303 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC, Humboldt Bay Power Plant, Unit 3 - Approval of Final Status Survey Reports for Caisson Survey Units NOL01-09/NOL01-09-FSR HBL-21-012, Errata for Humboldt Bay Power Plant 2020 Annual Radioactive Effluent Release Report2021-07-28028 July 2021 Errata for Humboldt Bay Power Plant 2020 Annual Radioactive Effluent Release Report HBL-21-011, Final Status Survey Report for the Humboldt Bay Power Plant2021-07-13013 July 2021 Final Status Survey Report for the Humboldt Bay Power Plant ML21189A0752021-07-0808 July 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC, Correction to License Numbering Humboldt Bay Power Plant, Unit 3 - Issuance of License Termination Plan Amendment ML21158A1262021-06-24024 June 2021 Letter - Humboldt Bay Power Plant Unit 3 - Issuance of Amendment No. 46 Re License Termination Plan HBL-21-009, Supplemental Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan2021-05-20020 May 2021 Supplemental Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan HBL-21-007, Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan2021-04-29029 April 2021 Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan HBL-21-008, Annual Radiological Environmental Monitoring Report for 20202021-04-28028 April 2021 Annual Radiological Environmental Monitoring Report for 2020 HBL-21-006, Annual Report of Occupational Radiation Exposure for Year 20202021-04-15015 April 2021 Annual Report of Occupational Radiation Exposure for Year 2020 ML21099A1192021-04-0808 April 2021 Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 2020 ML21091A0472021-04-0101 April 2021 Request for Additional Information on License Amendment Request to Revise the License Termination Plan DCL-21-030, 2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant2021-04-0101 April 2021 2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant HBL-21-004, Annual Radioactive Effluent Release Report for 20202021-03-30030 March 2021 Annual Radioactive Effluent Release Report for 2020 HBL-21-003, Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 32021-03-29029 March 2021 Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 3 ML21055A8262021-03-0303 March 2021 Letter to Welsch, Change in NRC Staff Project Management for Humboldt Bay Power Plant Unit 3 L-21-001, Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 20202021-02-18018 February 2021 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 2020 HBL-21-001, License Amendment Request 21-01 Revise Methodology in License Termination Plan2021-02-0808 February 2021 License Amendment Request 21-01 Revise Methodology in License Termination Plan IR 05000133/20200012020-12-0101 December 2020 NRC Inspection Report 05000133/2020-001 and 07200027/2020-001 HBL-20-013, Final Status Survey Report for the Humboldt Bay Power Plant (Office Annex, Security Building, Intake Structure, Count Room Building, and Waste Management Facility)2020-09-24024 September 2020 Final Status Survey Report for the Humboldt Bay Power Plant (Office Annex, Security Building, Intake Structure, Count Room Building, and Waste Management Facility) HBL-20-012, Responses to NRC Requests for Additional Information on the Final Status Survey Reports for the Humboldt Bay Power Plant2020-09-0303 September 2020 Responses to NRC Requests for Additional Information on the Final Status Survey Reports for the Humboldt Bay Power Plant ML20281A4062020-09-0303 September 2020 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Revision 10 to the Updated Final Safety Analysis Report HBL-20-011, Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR2020-07-20020 July 2020 Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR ML20161A0252020-06-10010 June 2020 Letter to J. Welsch Re. Issuance of Renewed License No. SNM-2514 2024-08-06
[Table view] |
Text
Loren D. Sharp Senior Director 735 Tank Farm Road San Luis Obispo, CA 93401 Pacific Gas and Electric Nuclear Decommissioning March 2, 2017 PG&E Letter HBL-17-004 PG&E Letter HIL-17-001 ATTN: Document Control Desk . Director, Division of Spent Fuel Managent
- Office of Nuclear Material Safety and Safeguards Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 50-133, License No. DPR-7 Humboldt Bay Power Plant, Unit 3 Docket No. 72-27, Materials License No. SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation Phone: 805.595.6481 Email: LDSL@pge.com 10 CFR 50.54 10 CFR 72.44 Report of Changes to the Humboldt Bay Emergency Plan (Revision
- 8) Dear Commissioners and Staff: Pursuant to 10 CFR 50.4, 10 CFR 50.54(q), 10 CFR 72.4 and 10 CFR 72.44(f), enclosed is a report of changes to HBI-L4, Humboldt Bay Emergency Plan previously titled Humboldt Bay Site Emergency Plan, which became effective January 10, 2017. PG&E evaluated the changes did not decrease the effectiveness of the Emergency Plan (E-Pian), and theE-Pian continues to meet the requirements of 10 CFR 50.47(b), 1 0 CFR 50 Appendix E, and 10 CFR 72.32(a).
The updated Humboldt Bay Emergency Plan has been distributed to NRC Region IV and is not included as part of this submittal.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04). Loren D. Sharp Enclosure cc: Humboldt Distribution cc/enc: William C. Allen, NRC John B. Hickman, NRC Kriss M. Kennedy, NRC Region IV Administrator Enclosure PG&E Letter HBL-17-004 , PG&E Letter HIL-17-001 Page 1 of 4 REPORT OF CHANGES TO THE HUMBOLDT BAY EMERGENCY PLAN, REVISION 8 PURSUANT TO 10 CFR 50.54(q) and 10 CFR 72.44(f) January 10, 2017 Pursuant to the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the following changes to the HBI-L4, Humboldt Bay Emergency Plan (HB E-Pian) are submitted.
The conditions onsite have changed due to current decommissioning activities.
As a result, changes to the HB
- E-Pian were made to reflect current site conditions.
These changes included the following:
- updating references to outdated or cancelled procedures,
- removing reference to an emergency locker,
- updating site description (Site map and Building list),
- revised specific actions,
- added, "There are no postulated accidents in Unit 3 nor at the ISFSI that could result in the release of radioactive materials to the environment in quantities that could require the implementation of protective actions for the general public,"
- editorial and format changes. Effectiveness screens were performed on the affected procedures and none of the changes were determined to be a reduction in effectiveness.
SECTION DESCRIPTION Format Title Humboldt Bay (HB) independent spent fuel storage installation (ISFSI) procedures are being reconfigured with new headers. The content of this document was transferred to new header format, along with a new title number (HBI-L4).
Paragraph 3 1.0 Added "There are no postulated accidents in Unit 3 nor at the ISFSI that could result in the release of radioactive materials to the environment in quantities that could require the implementation of protective actions for the general public."
SECTION 2.3.1 Figure 2.1-1 3.2.1 Table 3.2-1 DESCRIPTION Paragraph 2 Enclosure PG&E Letter HBL-17-004 PG&E Letter HIL-17-001 Page 2 of4 Previously read: "The reactor primary containment is located entirely below grade and is comprised of a drywell vessel housing the reactor and a suppression chamber located concentrically around the drywell. The drywell and suppression chamber are located within a reinforced concrete caisson that, in the vicinity of the reactor, is approximately 18 m (60 feet) in diameter with an inside depth of 24 m (78 feet) below grade. A caisson access shaft extends from the top of the caisson to the space beneath the drywell." Now reads: "The drywell and suppression chamber are located within a reinforced concrete caisson that is located entirely below grade. The caisson is approximately 18 m (60 feet) in diameter with an inside depth of 24 m (78 feet) below grade. A caisson access shaft extends from the top of the caisson to the space beneath the drywell." Humboldt Bay Site Layout-Map Humboldt Bay Site Layout-Building List The site layout and building list were updated to reflect changes due to decommissioning.
Previously read: "As described in HB ISFSI FSAR Section 8.2, there are no credible accidents that would cause the leakage of fission products from the storage system. Nevertheless, an emergency locker containing portable radiation monitoring equipment, portable fire extinguishers and a first aid kit are maintained onsite." Now reads: "As described in HB ISFSI FSAR Section 8.2, there are no credible accidents that would cause the leakage of fission products from the storage system. Nevertheless, portable radiation monitoring equipment, portable fire extinguishers and a first aid kit are maintained onsite." HB ISFSI Emergency Action Levels Table 3.2-1: Emergency Coordinator Judgment.
Previously read: "HU2" Now reads: "HU7
SECTION 5.3.1.2 5.3.
3.2 DESCRIPTION
Enclosure PG&E Letter HBL-17-004 PG&E Letter HIL-17-001 Page 3 of 4 Previously read: "Onsite Personnel Accountability/Assembly Accountability procedures for site personnel are intended to provide accountability for all personnel in the Restricted Areas and assembly for other site personnel.
Site procedures describe the process of accountability/assembly of site personnel.
If the site siren is sounded to indicate the accountability (assembly), each person is instructed to immediately go to a specific assembly area. A designated individual is assigned to each assembly area and is responsible to confirm personnel accountability, if required." Now reads: "Onsite Personnel Accountability/Assembly Procedures for site personnel are intended to provide for assembly of site personnel and describe the assembly process. If the site siren is sounded to indicate assembly, each person is instructed to immediately go to a specific assembly area. A designated individual is assigned to each assembly area and is responsible to confirm personnel accountability, if required." Previously read: "Medical emergencies could consist of a serious injury, illness, or overexposure.
Site and *ISFSI personnel who receive first-aid training are authorized to take action to the extent justified.
In all cases, individuals inform the Emergency Coordinator of the situation and render first aid to the patient in accordance with company-approved techniques.
If the patient is inside the Unit 3 Restricted Area, the patient should be moved, as early as practical, to a designated area for decontamination (if possible or as necessary) and transported to the hospital, if required." Now reads: "Medical emergencies could consist of a serious injury, illness, or radiological overexposure.
Site and ISFSI personnel who receive first-aid training are authorized to take action to the extent justified.
In all cases, individuals inform the Emergency Coordinator of the situation and render first aid to the patient in accordance with company-approved techniques.
If the medical emergency involves radioactive contamination, the patient should be moved, as early as practical, to a designated area for decontamination (if possible or as necessary) and transported to the hospital, if required."
SECTION 8.1.2.a I DESCRIPTION Enclosure PG&E Letter HBL-17-004 PG&E Letter HI L-17 -001 Page 4 of 4 Previously read: "In accordance with 10 CFR 50.54(q) and 10 CFR 72.44(f), PG&E may make changes to the Site Humboldt Bay Emergency Plan without NRC approval only if the changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the applicable standards 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50 and 10 CFR 72.32. At HBPP, the specific requirements for making and evalwating changes to the Plan to determine if those changes decrease the effectiveness of the Plan are set forth in procedures HBAP C-19, "Licensing Bases Impact Evaluation (LBIE)" and EPIP R-10, "Emergency Plan Management," specifically the section on 1 OCFR50.54(q)
Screening and Effectiveness Evaluations.
If a change is made without approval, PG&E shall submit, as specified in 50.54(q), a report of each change within thirty days after the change is made (effective date of revision).
After termination of the 10 CFR Part 50 license, the remaining emergency preparedness provisions for the ISFSI are subject only to the requirements of 10 CFR Part 72. PG&E shall retain a record of each change made to the Emergency Plan without prior NRC approval for a period of three years ,." Now reads: "In accordance with 10 CFR 50.54(q) and 10 CFR 72.44(f), PG&E may make changes to the Humboldt Bay Emergency Plan without NRC approval only if the changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the applicable standards 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50 and 10 CFR 72.32. At Humboldt Bay, the specific requirements for making and evaluating changes to the Plan to determine if those changes decrease the effectiveness of the Plan are set forth in procedures HBI-109, "ISFSI Licensing Bases Impact Evaluation (LBIE)" and HBI-260, "Site Emergency Plan Administration," specifically the section on 1 OCFR50.54(q)
Screening and Effectiveness Evaluations.
If a change is made without approval, PG&E shall submit, as specified in 50.54(q), a report of each change within thirty days after the change is made (effective date of revision).
After termination of the 10 CFR Part 50 license, the remaining emergency preparedness provisions for the ISFSI are subject only to the requirements of 10 CFR Part 72. PG&E shall retain a record of each change made to the Emergency Plan without prior NRC approval for a period of three years."