ML17296B286

From kanterella
Revision as of 15:07, 15 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests That Instrumentation & Control Independent Design Review Be Rescheduled at First Available Opportunity.Delays Will Have Significant Impact on Sar,Fsar & CESSAR-F Review
ML17296B286
Person / Time
Site: Palo Verde, 05000470
Issue date: 03/11/1981
From: SCHERER A E
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, EMVC-EPS
To: DENTON H R
Office of Nuclear Reactor Regulation
References
LD-81-014, LD-81-14, NUDOCS 8103170458
Download: ML17296B286 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBRs810317045b DOC~DATEs 81/03/1f NOTARIZED:

NO FACIL'sSTN~50'>>528 Palo Vet de>>Nuclear Stat4onr Un)t.1r Ar)zone Publ i STN-50 529 Palo Ve'rde Nuclear Stationr Unit 2'r A'r izona Publi STN 50-530 Palo Verde Nuclear Stationr Un)t 3r Ar)zona Publi STN 50 592 Palo Verde Nuclear Stationr Unjt 4r Ar)zona Publi STN-50-593 Palo Verde Nuclear Stationr Unit 5r Ar izona Publi AUTH', NAME AUTHOR AFFILIATION SCHERERrA,E~, C~E Power Systems REGIP~NAME RECIPIENT'FFILIATION

~DENTONr H.Rs Of fice of Nuc1 e'ar Reactor Regu)ationr Dir ectorI DOCKET 05000528 05000529 05000530 05000592 05000593

SUBJECT:

Requests that instrumentation L control independent'esign review be rescheduled at fi,rst available opportunity

~Delays" will have significant impact>>on SARrFSAR K CESSAR F review.DISTRIBUTION CODE>>EODSS COPIES RECEIVED>>LIIR WNCI.f SI E'-'k" TITLEs~Standardized P.lants NOTES Standardl zed Pl ant~1 Standar dized Plant+i Standardized Plant~1 Inactive.Inactive, cy: C Gr imes cysC Grimes cy'.C Grimes 05000528 05000529 05000530 05000592 05000593 RECIPIENT>>

ID-CODE/NAME(ACTIONs A/D LICENSNG LEE,J, COPIES RECIPIENT LTTR ENCL ID COOK/NAME' MIRAGLIAr F~1 KERRIGANr J~03 COPIES'TTR<

KNCL INTERNALs ACC EVAL BR 05 CHEM ENG BR 07 CORE PERF BR)f EFF TR SYS BR14 EQUIP QUAL BR15 IKC SYS BR 17 LIC GUID BR 39 MECH ENG BR 25 NRC PDR 02 POWER SYS BR 29 QAB: 38.REAC SYS BR 30'TRUC ENG BR 33 1 2 I 1 2 2 2 1 1 1 3 AUX SYS BR 06 CONT SYS BR 09 DIRr DIV 0 LIC01 EMERG PREP HUM FACT>>ENG 37 I8E 19 MATL ENG BR 1'5 MPA OELD PROC/TST REV 35 S BR34 REG'1 SYS INTER BR 40 1 2 1 1 1 6 1 2 f>>1 1 EXTERNALs ACRS 41 16 1 NSIC 04 TOTAL NUMBER'F COPIES REQUIRKDs LTTR~KNCL 0 Q I II M n II 4 h rr~1 I p$'I'l~I jl~t f J II C-E Power Systems Combustion Engineering, Inc.1000 Prospect Hill Road Windsor, Connecticut 06095 Tel.203/688-1911 Telex: 99297 SYSTEMS Mr.H.R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 March ll, 1981 LD-81-014 e e$hf/lP l 8 tgst Se clihtogy'I'o 7 l~

Subject:

Instrumentation and Control Independent Design Review Meeting for CESSAR-F

Dear Mr.Denton:

As you are aware, there is a very tight licensing review schedule presently in effect on Combustion Engineering's Standard Safety Analysis Report-FSAR (CESSAR-F) and the Palo Verde Nuclear Generating Station units.Any delays at this point will have significant impact on that review schedule.On March 5, 1981, representatives of Combustion Engineering (C-E)and Arizona Public Service met with your staff to discuss the agenda and other procedural items of the subject Independent Design Review (IDR)or System Review.At that meeting, the scheduled date of the IDR was delayed by your staff from the end of March to the middle of May.The rationale provided for this six-week delay was the work load within that particular branch.Considering the amount of effort required prior to the issuance of the Safety Evaluation Re-port for CESSAR-F, this delay could result in inadequate time available for the staff to complete its review.On the other hand, should we be allowed to continue with our planned IDR a more effective and efficient use of both of our resources could result.We, therefore, request that the instrumentation and control IDR be rescheduled at the first available opportunity.

Please feel free to contact me or Mr.T.J.Price of my staff at (203)688-1911, Extension 2803 should you have any additional questions.

Very truly yours, COMBUSTION ENGINEERING, INC.A,L, 5 h r.~>>A.E.Scherer Director Nuclear Lice~sing AES:cw t l