Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20151C969 | 8 April 1988 | Summary of 880406 Meeting W/Util & Alabama Electric Power Cooperative in Rockville,Md Re Status of Settlement Proposal Presented to NRC in Jan 1988,per 2.206 Antitrust Proceeding. List of Attendees Encl | |
ML20151M697 | 16 December 1985 | Summary of 851114 Meeting W/Util,B&W & NUS in Bethesda,Md Re Reliability of Emergency Feedwater Sys.List of Meeting Attendees & Viewgraphs Encl | |
ML20151Q813 | 3 August 1988 | Summary of Operating Reactors Events Meeting 88-031 on 880802.Viewgraphs & List of Attendees Encl | |
ML20151X001 | 10 September 1998 | Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl | |
ML20153B001 | 17 June 1988 | Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl.W/O Stated Encl | |
ML20153B006 | 17 June 1988 | Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl | Unanalyzed Condition Backfit |
ML20154A027 | 25 September 1998 | Summary of 980909-10 Meeting with Entergy Operations,Inc Re Implementation of risk-informed Inservice Insp Program. List of Attendees & Rept Prepared by Structural Integrity Associates,Inc Encl | Anticipated operational occurrence Dissimilar Metal Weld |
ML20154C010 | 26 February 1986 | Summary of 860122 Meeting W/B&W & Util Re B&W Plan for Licensing Fuel Loading in Plants W/Westinghouse Nsss. Viewgraphs Encl | |
ML20154C993 | 24 February 1986 | Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl | Fire Watch |
ML20154K961 | 5 February 1988 | Summary of 880204 Meeting Re Presentation Made by Allegheny Ludlum on Ferritic Stainless Steel E-Brite | |
ML20154N875 | 12 March 1986 | Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl | |
ML20154P007 | 12 March 1986 | Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl | |
ML20154S034 | 27 May 1988 | Summary of 880519 Meeting W/Middle South Utils Representatives Re Proposed Establishment & Licensing of Middle South Utils Nuclear Operating Co.Agenda Encl | |
ML20155C245 | 29 October 1998 | Summary of 981008 Meeting with Southern Nuclear Operating Co in Rockville,Md Re Util Repair of Joseph M Farley Nuclear Plant,Unit 1 B SG Tubes & Eddy Current Test Data for Tube R25C51 Submitted by .List of Attendees Encl | |
ML20155C414 | 29 October 1998 | Summary of 981014 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Md Re Justification of Certain TS Changes Needed to Implement Improved Std TS & NRC Staff Request for Addl Info, .List of Attendees Encl | |
ML20155H393 | 2 November 1998 | Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl | Coatings Temporary Modification Process Control Program Fire Protection Program |
ML20195J136 | 17 November 1998 | Summary of 981026 Meeting with Util in Rockville,Md to Discuss Plant Analysis of Replacement SG & Evaluation of Other Small Changes for FNP Units 1 & 2 Best Etimate Large Break loss-of-coolant Accident | |
ML20195J429 | 29 November 1988 | Summary of 881118 Meeting W/Util in Rockville,Md Re Four Plant Startup Issues Including:Dhr Sys Shutdown Cooling Mode of Operation,Operability of Penetration Room Ventilation Sys & Operability of Nozzles in safety-related Piping Sys | |
ML20196B146 | 11 January 1988 | Summary of CRGR Meeting 127 on 871223 Re Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nucl Nuclear Power Plants. Committee Recommended Forwarding Ofc Package to EDO Following Incorporation of CRGR Comments | Safe Shutdown Backfit |
ML20196H147 | 24 June 1999 | Summary of 990609 Meeting with Duke Energy Corp Re NRC Conclusions for TIA-98008 on Use of Compensatory Actions for Control Room Emergency Ventilation System & to Present Positions.List of Participants & Licensee Handouts Encl | |
ML20196J235 | 29 June 1999 | Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl | |
ML20196J785 | 10 March 1988 | Summary of Operating Reactors Events Meeting 88-10 on 880308.List of Attendees & Significant Elements of Events Discussed Encl | |
ML20197E072 | 7 May 1986 | Summary of 860408 Meting W/Util Re Hydrogen Control Measures,Standby Shutdown Facility & Nuclear Svc Water Sys Testing.Meeting Agenda,Attendance List & Viewgraphs Encl | Fuel cladding |
ML20197F169 | 8 May 1986 | Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors | Shutdown Margin Half scram Chernobyl |
ML20198G213 | 23 December 1997 | Summary of 971118 Meeting W/Duke Energy Corp in Rockville, Md,Re non-vital Electrical Bus,Kxa,Dual Unit Reactor Trip on 970906.List of Meeting Attendees & Licensee Handout Encl | |
ML20198G550 | 18 December 1998 | Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl | Enforcement Discretion Temporary Modification Backfit |
ML20198H277 | 20 March 1985 | Summary of 970313 Meeting W/Bg&E & AP&L in Bethesda,Md Re Reactor Coolant Pump Seal Cooling Following Loss of Offsite Power | Hydrostatic |
ML20198M703 | 29 December 1998 | Summary of 981215 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Current Steam Generator Tube Insp at Farley Nuclear Plant,Unit 1.List of Attendees & Meeting Handouts,Encl | |
ML20198S258 | 31 December 1998 | Summary of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Md to Discuss Technical Issues Associated with Kaowool Fire Barriers Installed at Farley Nuclear Plant, Units 1 & 2 | Safe Shutdown Fire Barrier Backfit |
ML20199A016 | 30 October 1997 | Summary of 971022 Meeting W/Util in Rockville,Md Re Initiatives That Focus on Planned Licensing Actions & Corrective Measures Re Problems Considered by Mgt to Warrant Special Attention | |
ML20199D465 | 10 June 1986 | Summary of 860527 Meeting W/Util,B&W & Metal Improvement Co in Bethesda,Md Re Plans to Perform Shot Peening of Unit 1 Steam Generator Tubes.Results of Unit 2 Tests of Steam Generator Tubes Also Reviewed.Attendee List Encl | Stress corrosion cracking Eddy Current Testing |
ML20202D242 | 2 July 1986 | Summary of 860610 Meeting W/Util in Bethesda,Md Re Licensee Analyses on Performance of Structural Steel Supports for Cable Trays (Electrays) in Unit 1 Mechanical Pipe Chase & Unit 2 Auxiliary Feedwater Pump Room After Fire | Fire Barrier |
ML20202E676 | 26 November 1997 | Summary of 971030 Meeting W/Duke Energy Corp Re Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Attendees,Meeting Agenda & Licensee Handout Matl Encl | |
ML20202G489 | 16 April 1986 | Summary of ACRS Combined DHR Sys/Eccs Subcommittee 860326 Meeting in Washington,Dc Re Review of Duke Power Co Request to Delete ECCS Upper Head Injection Sys & Proposed NRR Resolution Position for Generic Issue 124 | |
ML20202G498 | 22 May 1986 | Summary of ACRS Reactor Operations Subcommittee 860409 Meeting in Washington,Dc.Schedule of Items Covered, Attendance List & Meeting Handouts Encl | High Radiation Area Hydrostatic Squib |
ML20203B574 | 11 February 1998 | Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl | |
ML20203B708 | 10 February 1998 | Summary of 980127 Meeting W/Duke Energy Corp Re Proposed Rev of Topical Repts.List of Attendees & DEC Slides Encl | |
ML20203C235 | 4 February 1999 | Summary of 990127 Meeting with Duke Energy Corp Re Proposed License Amend to Take Credit for Soluble Boron & Partial Credit for Boraflex in Sf Pools at McGuire Nuclear Station. List of Attendees & Handouts Provided by Duke Encl | |
ML20203C550 | 5 December 1997 | Summary of 971120 Meeting W/Southern Nuclear Operating Co to Discuss Matters Related to Steam Generator Replacement Projects Proposed for Both Farley Nuclear Units.List of Attendees Enclosed | |
ML20203L950 | 19 February 1998 | Summary of 980204 Meeting W/Util to Discuss Info Re Design, Operabiliy & Qualifications of Grinnell Snubbers at Plant. Meeting Scheduled to Resolve Issues Re Staff Rai.List of Participants & Handouts Provided by Util Encl | Time of Discovery Safe Shutdown Earthquake Earthquake GOTHIC |
ML20204C545 | 24 July 1986 | Summary of 860715 Telcon W/Util & Westinghouse Re Alternative Steam Generator Tube Plugging Criterion for Defects Located in Tube Sheet Region.List of Participants Encl | Boric Acid Stress corrosion cracking Eddy Current Testing |
ML20204G439 | 12 October 1988 | Summary of 880908 Meeting W/Util in Arlington,Tx Re Previous Violation in Area of Contingency Response.Util Expressed Basis for Denial in Insp Rept 50-313/86-34.No New Requirements Imposed But Requirement Already in Place | |
ML20205J385 | 23 January 1986 | Summary of ACRS 309th Meeting on 860109-11 in Washington,Dc Re Final Design Approval for Gessar II Design & Proposed Rev 3 to Reg Guide 1.63, Electric Penetration Assemblies in Containment Structures for Nuclear Power Plants | Control of Heavy Loads |
ML20205J635 | 5 April 1999 | Summary of 990303 Meeting with Entergy Operations,Inc in Rockville,Maryland Re Status of Arkansas Nuclear One Backlog for Open Licensing Actions & Activities.List of Meeting Attendees & Licensee Handout Encl | Hot Short Safe Shutdown Grab sample Enforcement Discretion Exemption Request Earthquake |
ML20205J741 | 28 February 1986 | Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core | Earthquake |
ML20205J922 | 18 April 1986 | Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations | Probabilistic Risk Assessment |
ML20205K759 | 31 December 1986 | Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359) | Boric Acid Chernobyl |
ML20205P220 | 26 October 1988 | Summary of 881018 Meeting W/Util in Rockville,Md Re Results of Inservice Insp of Casings of Reactor Coolant Pumps a & B & Request for Relief from ASME Code Requirements for Inspecting Reactor Coolant Pumps.Related Info Encl | Exemption Request |
ML20206G118 | 5 May 1999 | Summary of 990419-20 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Implementation of Improved Standard TSs at Farley Nuclear Plant,Units 1 & 2 | |
ML20206L492 | 10 May 1999 | Summary of 990416 Meeting with Util in Rockville MD to Discuss Matter Re SG Operational Assessments for Current Operating Cycle at Plant,Unit 1 |