Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl.W/O Stated Encl
ML20153B001
Person / Time
Site: Farley  
Issue date: 06/17/1988
From: Jordan E
Committee To Review Generic Requirements
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
NUDOCS 8807120677
Download: ML20153B001 (2)


Text

.

N

,v> u m,)q UNITED STATES o

[

g NUCLEAR REGULATORY COMMISSION 5

j WASHINGTON, D. C. 20655

%,....+

June 17, 1988 MEMORANDUM FOR:

Victor Stello, Jr.

Executive Director for Operations FROM:

Edward L. Jordan, Chairman Committee to Review Generic Requirements

SUBJECT:

MINUTES OF CRGR MEETING NUMBER 137 The Committee to Review Generic Requirements (CRGR) met on Wednesday, June 8, 1988 from 1-4 p.m.

A list of~ attendees for this meeting is attached (Enclosure 1).

The following items were addressed at the meeting.

1.

M. Malsch (OGC) and S. Crockett (OGC) presented for CRGR review a proposed draft rule, 10 CFR Part 52, on Site Permits, Design Certifications, and Combined Licenses.

The Committee did not complete their review of this matter at this meeting, but planned to continue their review and provide final comments and recommendations during the week of June 13, 1988.

This matter is discussed in Enclosure 2.

2.

C. Rossi (NRR) and C. Berlinger (NRR) presented for CRGR review a proposed NRC Bulletin, Thermal Stresses in Piping Connected to Reactor Coolant Systems.

The Committee recommended in favor of issuing the proposed bulletin, subject to several minor clarifying modifications (to be coordinated with the CRGR staff).

This matter is discussed in.

3.

A. Thadani (NRR) and V. Thomas (NRR) briefed the Committee on the staff's proposed Safety Evaluation Report on generic report BAW 47-115091-00, the B&W Owners Group response to the requirements in the ATWS rule (10 CFR 50.62).

The Committee concluded that the report did not require formal review by CRGR, because it only implements the legal requirements in the ATWS rule and previously-approved staff positions.

This matter is discussed in Enclosure 4.

In accordance with the E00's July 18, 1983 directive concerning "Feedback and Closure on CRGR Reviews," a written response is required from the cognizant office to report agreement or disagreement with the CRGR recommendations in these minutes.

The response, which is required within five working days after receipt of these minutes, is to be forwarded to the CRGR Chairman and if there is disagreement with CRGR recommendations, to the EDO for decisionmaking.

t' oll ny MEETING 13, NRCCRGR f) s/

CDR R EVCP PDR

k-

. 2.

Questions concerning these meeting minutes should be referred _to Jim Conran

-(X29855).

w sigo.o e,.

E e Jorden Edward L. Jordan, Chairman Committee to Review Generic Requirements

Enclosures:

As stated cc w/ enclosures:

Commission (5)

SECY Office Directors Regional Administrators CRGR Members W. Parler M. Malsch C. Rossi A. Thadani Distribution: w/o enc.

Central File 4 PDR (NRC/CRGR)

S. Treby W. Little M. Lesar B. Doolittle (w/ enc.)

CRGR SF (w/ enc.)

CRGR CF (w/ enc.)

M. Taylor (w/ enc. )

E. Jordan (w/ enc.)

J. Heltemes (w/ enc.)

J. Conran (w/ enc.)

C. Sakenas (w/ enc.)

/ Abr OFC : CR :AE00 :

00:0D RW~ E0D :

.[.-..........-..--..:............:.........-..:......-.--

NAME : JCont :cg : CJHe temes LJ rdan 6//f./88 DATE :

6/ /8 6/ /88

\\

\\

OFFICIAL RECORD COPY