|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20196H1471999-06-24024 June 1999 Summary of 990609 Meeting with Duke Energy Corp Re NRC Conclusions for TIA-98008 on Use of Compensatory Actions for Control Room Emergency Ventilation System & to Present Positions.List of Participants & Licensee Handouts Encl ML20203C2351999-02-0404 February 1999 Summary of 990127 Meeting with Duke Energy Corp Re Proposed License Amend to Take Credit for Soluble Boron & Partial Credit for Boraflex in Sf Pools at McGuire Nuclear Station. List of Attendees & Handouts Provided by Duke Encl ML20236P1761998-07-13013 July 1998 Summary of 980709-10 Meeting W/Util Re Technical Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Meeting Participants Encl ML20249C7711998-06-29029 June 1998 Summary of 980617 & 18 Meetings W/Duke Energy Corp Re Technical Matters Related to Proposed Improved TSs for Catawba & McGuire Nuclear Stations.List of Meeting Attendees Encl ML20249B4361998-06-17017 June 1998 Summary of 980514 Meeting W/Duke Energy Corp Re Info Related to Ice Condenser Issues,Ice Weight Redistribution & Reduction & Block Ice Utilization.List of Participants & Handout Provided by Util,Encl ML20248E7911998-06-0101 June 1998 Summary of 980518 Meeting W/Duke Energy Corp Re Technical Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Meeting Participants Encl ML20203L9501998-02-19019 February 1998 Summary of 980204 Meeting W/Util to Discuss Info Re Design, Operabiliy & Qualifications of Grinnell Snubbers at Plant. Meeting Scheduled to Resolve Issues Re Staff Rai.List of Participants & Handouts Provided by Util Encl ML20203B7081998-02-10010 February 1998 Summary of 980127 Meeting W/Duke Energy Corp Re Proposed Rev of Topical Repts.List of Attendees & DEC Slides Encl ML20198G2131997-12-23023 December 1997 Summary of 971118 Meeting W/Duke Energy Corp in Rockville, Md,Re non-vital Electrical Bus,Kxa,Dual Unit Reactor Trip on 970906.List of Meeting Attendees & Licensee Handout Encl ML20202E6761997-11-26026 November 1997 Summary of 971030 Meeting W/Duke Energy Corp Re Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Attendees,Meeting Agenda & Licensee Handout Matl Encl ML20217P0651997-08-22022 August 1997 Summary of 970709 Meeting W/Util Re Issues Related to 1996 Rev of McGuire Ufsar.List of Attendees & Verbal Response Encl ML20129K3791996-11-21021 November 1996 Summary of 961016 Meeting W/Dpc at Plant Re Ongoing Current Licensing Issues & Safety Initiatives at Three Nuclear Stations.Meeting Attendees,Agenda & Handouts Encl ML20129G7761996-08-0909 August 1996 Summary of 432nd ACRS Meeting on 960612-14 Re Severe Accident Research & Draft Reg Guide DG-1047, Std Format & Content for Application to Renew Nuclear Power Plant Operating Licensees ML20129G6021996-06-26026 June 1996 Summary of 431st ACRS Meeting on 960523-25 Re Potential Ipe/ IPEEE Results to Compare Risk of Current Population of Plants W/Safety Goals,Resolution of Multiple Sys Responses Program Issues & Proposed Rule on Shutdown Operations ML20059L0651994-01-26026 January 1994 Summary of 931201 Meeting W/Util in Rockville,Md Re Presentation by Licensee on SG Replacement Project. Attendees Listed in Encl 1 ML20059H7581994-01-0303 January 1994 Summary of Operating Reactors Events Meeting 93-48 on 931222 ML20059H9901993-10-29029 October 1993 Summary of 930929 Meeting W/Util in Rockville,Md to Discuss Results of Util Investigation Into Unit 1 SG Tube Leaks. Licensee Agreed to Investigate Leakage Monitoring Program ML20059A5941993-10-14014 October 1993 Summary of 930929 Meeting W/B&W Re Generic Implications for of Steam Generator Leak for Similar Sleeves Installed at Other Facilities.List of Attendees & Meeting Handouts Encl ML20057F1471993-10-0606 October 1993 Summary of Operating Reactors Events Meeting 93-37 on 930929 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20056D6661993-06-0101 June 1993 Summary of Operating Reactors Events Briefing 93-19 on 930526 ML20126G7701992-12-21021 December 1992 Summary of 921215 Meeting W/Util Re Status of Plans to Replace Snubbers During Next Scheduled Unit 1 Outage in Mar 1993 ML20210E1761992-06-10010 June 1992 Summary of 920415 Meeting W/Representatives of Util to Discuss a Study by Kalsi Engineering on Capability of MOV Actuators.List of Attendees,Handouts,And Comments/Concerns Encl ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20217B4961991-02-0707 February 1991 Summary of 910204 Meeting W/Util in Atlanta Re self- Assessment of Facility Performance from 891101 - 910202.List of Attendees & Presentation Summary Encl ML20058H9381990-11-16016 November 1990 Summary of 901025 Meeting W/Util Re Operational Safety & Performance at Facilities.Viewgraphs Encl ML20248E8521989-10-0202 October 1989 Trip Rept of 890907 Visit to Plant Re Steel Containment Corrosion.Attendee List & Slides Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247C1091989-05-17017 May 1989 Summary of 890513 Meeting W/Util in Rockville,Md Re 890307 Steam Generator 1B Tube Rupture Event.Nrc Will Support 890504 Restart Only If Further Meetings & Reportings Result Into Effective Corrective Actions ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20235S7701989-02-21021 February 1989 Summary of 890118 Meeting W/Util at Site Re Certain Human Engineering Deficiencies Identified During Dcrdrs & Not Implemented.Attendees Listed in Encl 1 & Presentation Aids Listed in Encl 2 ML20147E8981988-02-26026 February 1988 Summary of Operating Reactors Events Meeting 88-006 on 880209 ML20148H2851988-01-22022 January 1988 Summary of ACRS Subcommittee on Generic Items 871216 Meeting W/Util in Washington,Dc Re Effectiveness of NRC Process That Deals W/Generic Issues & Usis.Viewgraphs & Presentation Schedule Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20196B1461988-01-11011 January 1988 Summary of CRGR Meeting 127 on 871223 Re Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nucl Nuclear Power Plants. Committee Recommended Forwarding Ofc Package to EDO Following Incorporation of CRGR Comments ML20236R2581987-11-18018 November 1987 Summary of 870827 Meeting W/Util Re Design Adequacy of Nuclear Svc Sys.List of Attendees & Meeting Agenda Encl ML20235W9431987-10-13013 October 1987 Summary of Operating Reactors Events Meeting 87-32 on 870922.Notes That Meeting 87-31 Did Not Occur.List of Attendees & Events Discussed & Significant Elements of Events Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20237G3891987-08-27027 August 1987 Summary of Operating Reactors Events Meeting 87-25 on 870804 Re Events That Occurred Since 870728 Meeting.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236E4291987-07-23023 July 1987 Summary of 870709 Meeting W/Util Re Groundwater Monitoring & Control at Site.Location of Wells Shown on Encl Sketch ML20215M3341987-06-22022 June 1987 Summary of 870618 Meeting W/Util & B&W Re Schedule for Review of Topical Repts Concerning Use of B&W Fuel for Plant Reloads.List of Attendees,Agenda & Presentation Matl Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E4951987-03-19019 March 1987 Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214E5711986-11-18018 November 1986 Summary of 861103 Operating Reactors Events Meeting 86-38 Re Briefing of Ofc & Div Directors on Events Occurring Since 861027 Meeting.List of Attendees,Viewgraphs & Addl Documentation Encl ML20212M8961986-08-21021 August 1986 Summary of 860801 Meeting W/Util & Westinghouse in Bethesda, MD Re Failed Fuel Due to Baffle Jetting Discovered During Unit 1,Cycle 4 Refueling Outage & Licensee Proposed Corrective Actions ML20205G9551986-08-13013 August 1986 Summary of Operating Reactors Events Meeting 86-28 on 860811 Re Briefing of Ofc Director,Div Directors & Representatives on Events Discussed at 860804 Meeting.List of Attendees & Viewgraphs Encl ML20214J6111986-08-0808 August 1986 Summary of 860725 Meeting W/Util & Westinghouse in Bethesda, MD Re Licensee Request to Change Tech Specs on Steam Generator Tube Plugging Criteria ML20204C5451986-07-24024 July 1986 Summary of 860715 Telcon W/Util & Westinghouse Re Alternative Steam Generator Tube Plugging Criterion for Defects Located in Tube Sheet Region.List of Participants Encl 1999-06-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20196H1471999-06-24024 June 1999 Summary of 990609 Meeting with Duke Energy Corp Re NRC Conclusions for TIA-98008 on Use of Compensatory Actions for Control Room Emergency Ventilation System & to Present Positions.List of Participants & Licensee Handouts Encl ML20203C2351999-02-0404 February 1999 Summary of 990127 Meeting with Duke Energy Corp Re Proposed License Amend to Take Credit for Soluble Boron & Partial Credit for Boraflex in Sf Pools at McGuire Nuclear Station. List of Attendees & Handouts Provided by Duke Encl ML20236P1761998-07-13013 July 1998 Summary of 980709-10 Meeting W/Util Re Technical Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Meeting Participants Encl ML20249C7711998-06-29029 June 1998 Summary of 980617 & 18 Meetings W/Duke Energy Corp Re Technical Matters Related to Proposed Improved TSs for Catawba & McGuire Nuclear Stations.List of Meeting Attendees Encl ML20249B4361998-06-17017 June 1998 Summary of 980514 Meeting W/Duke Energy Corp Re Info Related to Ice Condenser Issues,Ice Weight Redistribution & Reduction & Block Ice Utilization.List of Participants & Handout Provided by Util,Encl ML20248E7911998-06-0101 June 1998 Summary of 980518 Meeting W/Duke Energy Corp Re Technical Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Meeting Participants Encl ML20203L9501998-02-19019 February 1998 Summary of 980204 Meeting W/Util to Discuss Info Re Design, Operabiliy & Qualifications of Grinnell Snubbers at Plant. Meeting Scheduled to Resolve Issues Re Staff Rai.List of Participants & Handouts Provided by Util Encl ML20203B7081998-02-10010 February 1998 Summary of 980127 Meeting W/Duke Energy Corp Re Proposed Rev of Topical Repts.List of Attendees & DEC Slides Encl ML20198G2131997-12-23023 December 1997 Summary of 971118 Meeting W/Duke Energy Corp in Rockville, Md,Re non-vital Electrical Bus,Kxa,Dual Unit Reactor Trip on 970906.List of Meeting Attendees & Licensee Handout Encl ML20202E6761997-11-26026 November 1997 Summary of 971030 Meeting W/Duke Energy Corp Re Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Attendees,Meeting Agenda & Licensee Handout Matl Encl ML20217P0651997-08-22022 August 1997 Summary of 970709 Meeting W/Util Re Issues Related to 1996 Rev of McGuire Ufsar.List of Attendees & Verbal Response Encl ML20129K3791996-11-21021 November 1996 Summary of 961016 Meeting W/Dpc at Plant Re Ongoing Current Licensing Issues & Safety Initiatives at Three Nuclear Stations.Meeting Attendees,Agenda & Handouts Encl ML20129G7761996-08-0909 August 1996 Summary of 432nd ACRS Meeting on 960612-14 Re Severe Accident Research & Draft Reg Guide DG-1047, Std Format & Content for Application to Renew Nuclear Power Plant Operating Licensees ML20129G6021996-06-26026 June 1996 Summary of 431st ACRS Meeting on 960523-25 Re Potential Ipe/ IPEEE Results to Compare Risk of Current Population of Plants W/Safety Goals,Resolution of Multiple Sys Responses Program Issues & Proposed Rule on Shutdown Operations ML20059L0651994-01-26026 January 1994 Summary of 931201 Meeting W/Util in Rockville,Md Re Presentation by Licensee on SG Replacement Project. Attendees Listed in Encl 1 ML20059H7581994-01-0303 January 1994 Summary of Operating Reactors Events Meeting 93-48 on 931222 ML20059H9901993-10-29029 October 1993 Summary of 930929 Meeting W/Util in Rockville,Md to Discuss Results of Util Investigation Into Unit 1 SG Tube Leaks. Licensee Agreed to Investigate Leakage Monitoring Program ML20059A5941993-10-14014 October 1993 Summary of 930929 Meeting W/B&W Re Generic Implications for of Steam Generator Leak for Similar Sleeves Installed at Other Facilities.List of Attendees & Meeting Handouts Encl ML20057F1471993-10-0606 October 1993 Summary of Operating Reactors Events Meeting 93-37 on 930929 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20056D6661993-06-0101 June 1993 Summary of Operating Reactors Events Briefing 93-19 on 930526 ML20126G7701992-12-21021 December 1992 Summary of 921215 Meeting W/Util Re Status of Plans to Replace Snubbers During Next Scheduled Unit 1 Outage in Mar 1993 ML20210E1761992-06-10010 June 1992 Summary of 920415 Meeting W/Representatives of Util to Discuss a Study by Kalsi Engineering on Capability of MOV Actuators.List of Attendees,Handouts,And Comments/Concerns Encl ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20217B4961991-02-0707 February 1991 Summary of 910204 Meeting W/Util in Atlanta Re self- Assessment of Facility Performance from 891101 - 910202.List of Attendees & Presentation Summary Encl ML20058H9381990-11-16016 November 1990 Summary of 901025 Meeting W/Util Re Operational Safety & Performance at Facilities.Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247C1091989-05-17017 May 1989 Summary of 890513 Meeting W/Util in Rockville,Md Re 890307 Steam Generator 1B Tube Rupture Event.Nrc Will Support 890504 Restart Only If Further Meetings & Reportings Result Into Effective Corrective Actions ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20235S7701989-02-21021 February 1989 Summary of 890118 Meeting W/Util at Site Re Certain Human Engineering Deficiencies Identified During Dcrdrs & Not Implemented.Attendees Listed in Encl 1 & Presentation Aids Listed in Encl 2 ML20147E8981988-02-26026 February 1988 Summary of Operating Reactors Events Meeting 88-006 on 880209 ML20148H2851988-01-22022 January 1988 Summary of ACRS Subcommittee on Generic Items 871216 Meeting W/Util in Washington,Dc Re Effectiveness of NRC Process That Deals W/Generic Issues & Usis.Viewgraphs & Presentation Schedule Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20196B1461988-01-11011 January 1988 Summary of CRGR Meeting 127 on 871223 Re Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nucl Nuclear Power Plants. Committee Recommended Forwarding Ofc Package to EDO Following Incorporation of CRGR Comments ML20236R2581987-11-18018 November 1987 Summary of 870827 Meeting W/Util Re Design Adequacy of Nuclear Svc Sys.List of Attendees & Meeting Agenda Encl ML20235W9431987-10-13013 October 1987 Summary of Operating Reactors Events Meeting 87-32 on 870922.Notes That Meeting 87-31 Did Not Occur.List of Attendees & Events Discussed & Significant Elements of Events Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20237G3891987-08-27027 August 1987 Summary of Operating Reactors Events Meeting 87-25 on 870804 Re Events That Occurred Since 870728 Meeting.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236E4291987-07-23023 July 1987 Summary of 870709 Meeting W/Util Re Groundwater Monitoring & Control at Site.Location of Wells Shown on Encl Sketch ML20215M3341987-06-22022 June 1987 Summary of 870618 Meeting W/Util & B&W Re Schedule for Review of Topical Repts Concerning Use of B&W Fuel for Plant Reloads.List of Attendees,Agenda & Presentation Matl Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E4951987-03-19019 March 1987 Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214E5711986-11-18018 November 1986 Summary of 861103 Operating Reactors Events Meeting 86-38 Re Briefing of Ofc & Div Directors on Events Occurring Since 861027 Meeting.List of Attendees,Viewgraphs & Addl Documentation Encl ML20212M8961986-08-21021 August 1986 Summary of 860801 Meeting W/Util & Westinghouse in Bethesda, MD Re Failed Fuel Due to Baffle Jetting Discovered During Unit 1,Cycle 4 Refueling Outage & Licensee Proposed Corrective Actions ML20205G9551986-08-13013 August 1986 Summary of Operating Reactors Events Meeting 86-28 on 860811 Re Briefing of Ofc Director,Div Directors & Representatives on Events Discussed at 860804 Meeting.List of Attendees & Viewgraphs Encl ML20214J6111986-08-0808 August 1986 Summary of 860725 Meeting W/Util & Westinghouse in Bethesda, MD Re Licensee Request to Change Tech Specs on Steam Generator Tube Plugging Criteria ML20204C5451986-07-24024 July 1986 Summary of 860715 Telcon W/Util & Westinghouse Re Alternative Steam Generator Tube Plugging Criterion for Defects Located in Tube Sheet Region.List of Participants Encl ML20202G1711986-07-0808 July 1986 Summary of Operating Reactor Events Meeting 86-22 on 860630 W/Ofc Director,Div Directors & Representatives to Discuss Events Occurring Since 860623.List of Attendees & Viewgraphs Encl 1999-06-24
[Table view] |
Text
-
~
. ; [{} 'N?
p
.r"'%
t UNITED STATES 5D-4B/ffy.
p, .; NUCLEAR REGULATORY COMMISSION o '4 W ASHINGToN. D.C. 2066H001
%...../
November 26,1997 LICENSEE: Duke Energy Corporation FACILITIES: Catawba Nuclear Station, Units 1 and 2 McGuire Nuclear Station, Units 1 and 2
SUBJECT:
MEETING
SUMMARY
- MEETING OF OCTOBER 30,1997 (TAC M95298, M95299, M98964, M98965)
REFERENCE:
Meeting Notice by P. S. Tam, October 16,1997 On October 30,1997, the NRC staff met with Duke Energy Corporation (DEC or Duke) personnel to discuss matters related to the proposed improved Technical Specifications (ITS) for Catawba and McGuire nuclear stations (see individualletters from M. S. Tuckman to NRC, May 27,1997, for both Catawba and McGuire). Enclosure 1 is the list of meeting participants. .
Enclosure 2 is the meeting agenda. The licensee's handout materialis included as Enclosure 3 to this summary.
The licensee requi 4 tha meeting to explain the DEC structure, process, and implementation of the ITS at both tnu McGuire and Catawba sites. DEC policies toward supplementing the ITS submittal and preferences for the delivery of the draft Safety Evaluation (SE) were discussed.
DEC stressed the importance of the delivery times for both the draft and (nal SEs. Schedules for the implementation of the ITS program, which included DEC proprietary information, were handed out by DEC to the staff ior its information, none of which was kept by the staff and retumed to DEC at the end of the meeting. Beyond scope items in the ITS sobmittal were discussed and DEC agreed to rerei,ew its submittal and identify all beyond-scope items. DEC also agresd to review the format for the Robinson submittal and prepare a similar format for future staff use in Wordperfect format.
The NRC technical staff discussed issues related to formats for submittal of license amendment requests and their effect on review complexity. The staff also discussed its priority for completing in-house ITS reviews and its understanding of critical path items for the completion / implementation of the DEC ITS program. The staff stated that it intends to finish all in-house ITS applications before accepting new applications.
9712000111 971126 a ($h f h~MM 08057 ' '
PDR ADOCK 05000369 )
on M pf.M k p ll ll lll,IllJillJll,Ill
__.__.__m_- __.-_--- -_-_m__
ll f..* ,
4 * ,
,e: e r
.s 3
'* 2 ,
- {
.+
Regarding the schedule to complete the raview, the staff stated that the implementation schedule, discussed above, was reasonable and that, other than the NRC review period being approximately 1 year, no changes would have to be made to the planned implementation dates.
As requested by DEC, the staff agreed to submit comments on a section by section basis and in electronic format; however, meetings to discuss outstanding issues are encouraged only after a round of requests for additionalinformation and DEC responses are completed.
ORIGINAL SIGNED BY:
William Gleaves, Project Manager Project Directorate 112 Division of Nuclear Reactor Projects t/II Office of Nuclear Reactor Regulation Docket Nos. 50-360, 50 370, 50-413 and 50-414
Enclosures:
1, List of participants
- 2. Meeting Agenda
- 3. Handouts cc wiencls 1 and 2: See next page :
Distribution:
See next page .
s:-
M
_o, r- [ .
t
, 3 To receive a copy of this document, Indicate in the box: "C" = Copy without attachmentlenclosure "E" =
s Copy with attenhment/ enclosure "N" = P(o copy ,
j OFFICE PM:F Dlh2p A IC LA:PDil $A ld PM:PDil-2, PM:PDij 2 ,
BC:OTSB D:PCfth2? L NAME WdeaVesien L. Berry l@ P. Tam (X j'l VJ4efses1A i V W.Becknerno H.'B4ribv/ j DATE 4 /2997 11 Ill /97 ' \ ([ /N/97' // //W97 ll/7/97 il/b/97- i DOCU;AENT NAME: G;\ CATAWBA \ CAT 95298. SUM OFFICIAL RECORD COPY
- - , - ,, - --e . . - - . ~o.i- - - , ,
g I 2- ;
Regarding the schedule to complete the review, the staff stated that the implementation schedule, discussed above, was reasonable and that, other than the NRC review period being ;
approximately 1 year, no changes would have to be made to the planned implementation dates.
As requested by DEC, the staff agreed to submit comments on a section by section basis and in electronic format; however meetings to discuss outstanding issues are uncouraged only sfter a round of requests for additional information and DEC responses are completed.
M &
William Gleave Project Manager Project Directo te ll 2 Division of Nuclear Reactor Projects 1/ll ;
Offi,:e of Nuclear Reactor Regulation Docket Nos. 50 369,50-370,50-413 and 50 414
Enclosures:
1
- 1. List of participants
?. Meeting Agenda
- 3. Handouts cc w/encls 1 and 2: See next page
- me -a-em-,wew + - y v-m -
-y V 'T "g+--ry 9-yy y h 4+9-w -'--m-T-'
Distribution for Meeting Summary: - November- 26, 1997 HAttD_C.QP_Y_WITH ALL ENCLOAUREE geelutMe:r i
PUBLIC PD ll 2 Rdg.
OGC ACRS E MAIL
SUMMARY
.WITH ENCLOSURES.1 AND 2 ,
i S.- Collins /F. Miraglia R. Zimmerman B.Boger ,
H. Berkow i
- V, Nerses "
W. Gleaves W. Beckner C. Harbuck P. Tam L. Berry C. Ogle i D. Roberts R. Franovich M. Franovich M. Gitas .
N. Dudley w J. Johnson, Ril .i C. . Ogle, Ril 3
u e o
+
I 1
l~
l e p vp q e + w e7-- e ee y + --
i McGuire Nuclear Station Mr. Richard M. Fry, Director i Catawba Nuclear Station Department of Environmental, HeaRh and Natural Resources Division of Wadiation Protection cc: 3825 Barrett Drive Mr. Paul R. Newton Raleigh, North Carolina 2760g 7721 Duke Energy Corporation, PB05E 422 South Church Street Ms. Karen E. kng ,
Charlotte, North Carolina 20242 - Assistant Attorney General North Carolina Department of County Manager of Justic' '
Meckleriberg County P. O, boa 82g 720 Cast Fourth Street Raleigh, North Carolina 27602 Charlotte, North Carolina 28202 Mr. G, A. Copp Mr. Michael T. Cash Licensing - EC050 Regulatory Compliance Manager Duke Energy Corporation Duke Energy Corporation 526 South Church Street McGuire Nuclear Site Charlotte, North Carolina 28242 0001 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission J. Michael McGarry,111. Esquire Atlanta Federal Center Winston and Strawn 61 Forsyth Street, S.W., Suite 23T85 1400 L Street, NW. Atlanta, Georgia 30303 Washington, DC 20005 Elaine Wathen Senior Resident inspector Lead REP Planner c/o U. S. Nuclear Regulatory Division of Emergency Management Commission 116 West Jones Street 12700 Hagers Fenry Road Raleigh, North Carolina 276031335 Huntersville, North Carolina 28078 Mr. T. Richard Puryear Owner's Group (NCEMC)
Duke Energy Corporation
, 4800 Concord Road York, South Carolina 29745 Dr. John M. Barry Mecklenberg County Department of Environmental Protection 700 N. Tryon Street Charlotte. North Carolina 28202 y "r -'"'-'s--*' vt -
war eer" er*-s-wy- '7^' -iv-M -
yy' w '
'7=r,--m--myi'rn_,.
McGuire Nuclear Station Catawba Nuclear Station cc:
Mr. M. S. VJtlan North Carolina Electric Membership Regulatory Compliance Mansger Corporation Duke Energy Corporation P. O. Box 27306 4800 Concord Road . Raleigh, North Carolina 27611 York, South Carolina 29745 Senior Resident inspector North Carolina Municipal Power Route 2, Box 179 N Agency Number 1 York, South Carolina 29745 1427 Meadowwood Boulevard P. O. Box 29513 Mr. G. R. Peterson Raleigh, North Carolina 27626-0513 Site Vice President Catawba Nuclear Station County Manager of York County Duke Energy Corporation York County Courthouse 4800 Concord Road York, South Carolina 29745 York South Carolina 29745-9635 Richard P. Wilson, Esquire Mr. H. 9. Barron Assistant Attorney General Vice President, McGuire Site South Carolina Attorney General's Duke Energy Corp ation Office 12700 Hagers Feny Road P. O. Box 11549 Huntersville, North Ca,olina 28078 Columbla, South Carolina 29211 Piedmont Municipal Powcr Agency 121 Village Drive Greer, South Carolina 29651 Galuda River Electric P. O. Box 929 Laurens, South Carolina 29360 Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Cclumbia, South Carolina 29201
I L[ST OF PARTICIPANTS r MEETING WITH DUKE ENERGY CORPORATION ,
OCTOBER 30.1997 NAME AFFILIATION William Beckner NRC/NRR/ Chief, Technical Specifications Branch Victor Norses NRC/NRR/ Project Directorate 112 ,
Peter Tam NRC/NRR/ Project Directorate ll 2 William Gleaves NRC/NRR/ Project Directorate ll 2 l Craig Harbuck NRC/NRR/ Technical Specifications Branch James Fisicaro DEC/ Manager, Nuclear Assessment and issues Division .
Luellen B. Jones DEC/ITS Development Project Manager MichaelT. Cash DEC/McGuire Regulatory Compliance Manager Michael S. Kitten DEC/ Catawba Nuclear Compliance Manager Jim Sndyer DEC/McGuire ITS Implementation Manager Lawrence J. Rudy DEC/ Catawba ITS Implementation Manager Donald Hoffman Excei Services (DEC contractor), President G. DarrellGardner Excel Services (DEC contractor), ITS Lead Technical Author Tom Porter Excel Services (DEC contractor), ITS Technical Author Ed Lozito Scientech (NRC contractor)
R. S. Barsh Virginia Power Co.
I.
- Enclosure 1 I
L-L 1 , . -, -
e O Tentative Agenda NRC and Duke Energy Corproation Meeting on Review of Improved Technical Specifications I
Catawba and McGuire Nuclear Stations October 30,1997 Introductions and Remarks - Duke /NRR Personnel 12:30 p.m.
Introduction of Participants Purpose of Meeting Implementation Project Overview - Luellen Jones Organization Coordination of Issues Between Sites Comment Resolution Process Comments Needed on Section Basis Need Difficult Sections Early Content / format of ITS Supplements Close coordination with OTSB/ Duke Project Leads Catawba /McGuire implementation Schedule - Luellen Jones, James Snyder, Lawrence Rudy Need for Concurrent McGuire/ Catawba Review Specific Outage Windows Tralning Procedures License Amendments to the Current Technical Specifications - Luellen Jones Minimize Additional Changes Supplement to ITS Status of TS Branch Review- C. Harbuck, W. Beckner, H. Berkow 1:00 p.m.
Schedule for Completing Review Significant Technical Issues Closing Remarks -- Duke and NRC Personnel Enclosure 2 we m gyrN T'- - .. -- -c. w -+w -
w
l Agenda !
Improved Technical Specifications (ITS) Meeting with NRC October 30,1997 - ONRR Offices Introductions and Remarks Duke /NRR
. Introduction of Participants
. Purpose of Meeting l
. Implementation Project Overview LBJ 1 i
. Organization Coordination of lesues Between Sites
. Comment Resolution Process
. Comments Needed on Section Baals i
. Need Difficult Sections Early
. Content / format of ITS Supplements Close coordination with OTSB/ Duke Project Leads
. Catawba /McGuire implementation Schedule JES/LJR Need for Concurrent McGuire/ Catawba Review
. Specific Outage Windows
. Operator Training
. Procedures License Amendments to the Current Technical Specifications LBJ
. Minimize Additional Changes
. Supplement to ITS Status of Technical Specificat!ons Branch (OTSB) Review NRR
. Schedule for Completing Review
. Specific Milestones
. Significant Technicalissues
. Closing Remarks Duke /NRC Personnel Enclosure 3
, i l Agenda improved Technical Specifications (ITS) Meeting with NRC October 30,1997 - ONRR Offices e
introduction and Remarks ,
introduction of Participants James Fisicaro/NRR Personnel Purpose of Meeting James Fisicaro Duke requests this meeting with the NRC to discuss our implementation of McGuire and Catawba improved Technical Specifications.
Significant issues to be discussed include:
Overview of the implementation phase of the conversion project The necessity for logical comment resolution process which meets both NRC and Duke needs to effectively utilize limited resources The implementation schedula priority for each site Impact of subsequent license amendments on ITS submittal Determine NRC detailed schedule for conversion review I
. o ADenda Improved Technical Specifications (ITS) Meeting with NRC '
October 30,1997 ONRR Offices
- Implementation Project Overview Organization Coordination of issues Between Sites Comment Resolution Process Duke requests that the NRC screen contractor comments to svold problems experienced by other utilities Close coordination with OTSB/ Duke project leads is a must Comments Needed on Section Basis Effectively utilizes resources To prepare any required supplements To facilitate procedure changes Need Difficult Sections Early Sections 3.3 and 3.8 are essential Spreads the procedure change impact over the longest duration.
Content / format of ITS Supplements Written responses provided for all written co nments Comments i.eeded in electronic format to facilitate written responses ITS submittal supplements on section basis. Chan0es indicated by revision bars and/or bold markups as applicable to facilitate NRC review Timely responses needed to all supplements to facilitate comment closure and procedure preparation.
l 2
Agenda improved Technical Specifications (ITS) Meeting with NRC October 30,1937 - ONRR Offices '
Catawba /McGuire implementaticn Schedule JES/LJR Need for concurrent reviews Specific Outage Windows implementation - minimum of 3 months after issuance of draft SER McGuire driving the need date Resources needed to support outages prior to ITS implementation Maximize time to process changes to programs and procedures Minimizo the time required to maintain dual procedures Operator Training McGuire operator training for ITS scheduled Feb-April 1998 Catawba operator training for ITS scheduled May-July 1998 Proceduros Procedure changes after comment resolution on each section Minimize the time required to maintain dual procedures 3
l Agenda )
i improved Technical Specifications (ITS) Meeting with NRC '
October 30,1997 ONRR Offices i e
License Amendments to the Current Technical Specifications LBJ Minimize additional changes Necessitated by modifications or identified problems Supplomont to ITS Shuuld package for supplemental ITS submittal include?
iTS and ITS Bases markup ITS and ITS Bases retyped pages Revised CTS markup DOCS retyped pages Flevised NUREG & Bases M9rkup Justification for Deviation retyped pages No Significant Hazards retyped,pages i
4
=.