Summary of 971030 Meeting W/Duke Energy Corp Re Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Attendees,Meeting Agenda & Licensee Handout Matl Encl
ML20202E676
Person / Time
Site: Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 11/26/1997
From: Gleaves W
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9712080111
Download: ML20202E676 (13)


Text

-

~

.  ; [{} 'N?

p

.r"'%

t UNITED STATES 5D-4B/ffy.

p, .; NUCLEAR REGULATORY COMMISSION o '4 W ASHINGToN. D.C. 2066H001

%...../

November 26,1997 LICENSEE: Duke Energy Corporation FACILITIES: Catawba Nuclear Station, Units 1 and 2 McGuire Nuclear Station, Units 1 and 2

SUBJECT:

MEETING

SUMMARY

- MEETING OF OCTOBER 30,1997 (TAC M95298, M95299, M98964, M98965)

REFERENCE:

Meeting Notice by P. S. Tam, October 16,1997 On October 30,1997, the NRC staff met with Duke Energy Corporation (DEC or Duke) personnel to discuss matters related to the proposed improved Technical Specifications (ITS) for Catawba and McGuire nuclear stations (see individualletters from M. S. Tuckman to NRC, May 27,1997, for both Catawba and McGuire). Enclosure 1 is the list of meeting participants. .

Enclosure 2 is the meeting agenda. The licensee's handout materialis included as Enclosure 3 to this summary.

The licensee requi 4 tha meeting to explain the DEC structure, process, and implementation of the ITS at both tnu McGuire and Catawba sites. DEC policies toward supplementing the ITS submittal and preferences for the delivery of the draft Safety Evaluation (SE) were discussed.

DEC stressed the importance of the delivery times for both the draft and (nal SEs. Schedules for the implementation of the ITS program, which included DEC proprietary information, were handed out by DEC to the staff ior its information, none of which was kept by the staff and retumed to DEC at the end of the meeting. Beyond scope items in the ITS sobmittal were discussed and DEC agreed to rerei,ew its submittal and identify all beyond-scope items. DEC also agresd to review the format for the Robinson submittal and prepare a similar format for future staff use in Wordperfect format.

The NRC technical staff discussed issues related to formats for submittal of license amendment requests and their effect on review complexity. The staff also discussed its priority for completing in-house ITS reviews and its understanding of critical path items for the completion / implementation of the DEC ITS program. The staff stated that it intends to finish all in-house ITS applications before accepting new applications.

9712000111 971126 a ($h f h~MM 08057 ' '

PDR ADOCK 05000369 )

on M pf.M k p ll ll lll,IllJillJll,Ill

__.__.__m_- __.-_--- -_-_m__

ll f..* ,

4 * ,

,e: e r

.s 3

'* 2 ,

  1. {

.+

Regarding the schedule to complete the raview, the staff stated that the implementation schedule, discussed above, was reasonable and that, other than the NRC review period being approximately 1 year, no changes would have to be made to the planned implementation dates.

As requested by DEC, the staff agreed to submit comments on a section by section basis and in electronic format; however, meetings to discuss outstanding issues are encouraged only after a round of requests for additionalinformation and DEC responses are completed.

ORIGINAL SIGNED BY:

William Gleaves, Project Manager Project Directorate 112 Division of Nuclear Reactor Projects t/II Office of Nuclear Reactor Regulation Docket Nos. 50-360, 50 370, 50-413 and 50-414

Enclosures:

1, List of participants

2. Meeting Agenda
3. Handouts cc wiencls 1 and 2: See next page  :

Distribution:

See next page .

s:-

M

_o, r- [ .

t

, 3 To receive a copy of this document, Indicate in the box: "C" = Copy without attachmentlenclosure "E" =

s Copy with attenhment/ enclosure "N" = P(o copy ,

j OFFICE PM:F Dlh2p A IC LA:PDil $A ld PM:PDil-2, PM:PDij 2 ,

BC:OTSB D:PCfth2? L NAME WdeaVesien L. Berry l@ P. Tam (X j'l VJ4efses1A i V W.Becknerno H.'B4ribv/ j DATE 4 /2997 11 Ill /97 ' \ ([ /N/97' // //W97 ll/7/97 il/b/97- i DOCU;AENT NAME: G;\ CATAWBA \ CAT 95298. SUM OFFICIAL RECORD COPY

  • - , - ,, - --e . . - - . ~o.i- - - , ,

g I 2-  ;

Regarding the schedule to complete the review, the staff stated that the implementation schedule, discussed above, was reasonable and that, other than the NRC review period being  ;

approximately 1 year, no changes would have to be made to the planned implementation dates.

As requested by DEC, the staff agreed to submit comments on a section by section basis and in electronic format; however meetings to discuss outstanding issues are uncouraged only sfter a round of requests for additional information and DEC responses are completed.

M &

William Gleave Project Manager Project Directo te ll 2 Division of Nuclear Reactor Projects 1/ll  ;

Offi,:e of Nuclear Reactor Regulation Docket Nos. 50 369,50-370,50-413 and 50 414

Enclosures:

1

1. List of participants

?. Meeting Agenda

3. Handouts cc w/encls 1 and 2: See next page

- me -a-em-,wew + - y v-m -

-y V 'T "g+--ry 9-yy y h 4+9-w -'--m-T-'

Distribution for Meeting Summary: - November- 26, 1997 HAttD_C.QP_Y_WITH ALL ENCLOAUREE geelutMe:r i

PUBLIC PD ll 2 Rdg.

OGC ACRS E MAIL

SUMMARY

.WITH ENCLOSURES.1 AND 2 ,

i S.- Collins /F. Miraglia R. Zimmerman B.Boger ,

H. Berkow i

- V, Nerses "

W. Gleaves W. Beckner C. Harbuck P. Tam L. Berry C. Ogle i D. Roberts R. Franovich M. Franovich M. Gitas .

N. Dudley w J. Johnson, Ril .i C. . Ogle, Ril 3

u e o

+

I 1

l~

l e p vp q e + w e7-- e ee y + --

i McGuire Nuclear Station Mr. Richard M. Fry, Director i Catawba Nuclear Station Department of Environmental, HeaRh and Natural Resources Division of Wadiation Protection cc: 3825 Barrett Drive Mr. Paul R. Newton Raleigh, North Carolina 2760g 7721 Duke Energy Corporation, PB05E 422 South Church Street Ms. Karen E. kng ,

Charlotte, North Carolina 20242 - Assistant Attorney General North Carolina Department of County Manager of Justic' '

Meckleriberg County P. O, boa 82g 720 Cast Fourth Street Raleigh, North Carolina 27602 Charlotte, North Carolina 28202 Mr. G, A. Copp Mr. Michael T. Cash Licensing - EC050 Regulatory Compliance Manager Duke Energy Corporation Duke Energy Corporation 526 South Church Street McGuire Nuclear Site Charlotte, North Carolina 28242 0001 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission J. Michael McGarry,111. Esquire Atlanta Federal Center Winston and Strawn 61 Forsyth Street, S.W., Suite 23T85 1400 L Street, NW. Atlanta, Georgia 30303 Washington, DC 20005 Elaine Wathen Senior Resident inspector Lead REP Planner c/o U. S. Nuclear Regulatory Division of Emergency Management Commission 116 West Jones Street 12700 Hagers Fenry Road Raleigh, North Carolina 276031335 Huntersville, North Carolina 28078 Mr. T. Richard Puryear Owner's Group (NCEMC)

Duke Energy Corporation

, 4800 Concord Road York, South Carolina 29745 Dr. John M. Barry Mecklenberg County Department of Environmental Protection 700 N. Tryon Street Charlotte. North Carolina 28202 y "r -'"'-'s--*' vt -

war eer" er*-s-wy- '7^' -iv-M -

yy' w '

'7=r,--m--myi'rn_,.

McGuire Nuclear Station Catawba Nuclear Station cc:

Mr. M. S. VJtlan North Carolina Electric Membership Regulatory Compliance Mansger Corporation Duke Energy Corporation P. O. Box 27306 4800 Concord Road . Raleigh, North Carolina 27611 York, South Carolina 29745 Senior Resident inspector North Carolina Municipal Power Route 2, Box 179 N Agency Number 1 York, South Carolina 29745 1427 Meadowwood Boulevard P. O. Box 29513 Mr. G. R. Peterson Raleigh, North Carolina 27626-0513 Site Vice President Catawba Nuclear Station County Manager of York County Duke Energy Corporation York County Courthouse 4800 Concord Road York, South Carolina 29745 York South Carolina 29745-9635 Richard P. Wilson, Esquire Mr. H. 9. Barron Assistant Attorney General Vice President, McGuire Site South Carolina Attorney General's Duke Energy Corp ation Office 12700 Hagers Feny Road P. O. Box 11549 Huntersville, North Ca,olina 28078 Columbla, South Carolina 29211 Piedmont Municipal Powcr Agency 121 Village Drive Greer, South Carolina 29651 Galuda River Electric P. O. Box 929 Laurens, South Carolina 29360 Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Cclumbia, South Carolina 29201

I L[ST OF PARTICIPANTS r MEETING WITH DUKE ENERGY CORPORATION ,

OCTOBER 30.1997 NAME AFFILIATION William Beckner NRC/NRR/ Chief, Technical Specifications Branch Victor Norses NRC/NRR/ Project Directorate 112 ,

Peter Tam NRC/NRR/ Project Directorate ll 2 William Gleaves NRC/NRR/ Project Directorate ll 2 l Craig Harbuck NRC/NRR/ Technical Specifications Branch James Fisicaro DEC/ Manager, Nuclear Assessment and issues Division .

Luellen B. Jones DEC/ITS Development Project Manager MichaelT. Cash DEC/McGuire Regulatory Compliance Manager Michael S. Kitten DEC/ Catawba Nuclear Compliance Manager Jim Sndyer DEC/McGuire ITS Implementation Manager Lawrence J. Rudy DEC/ Catawba ITS Implementation Manager Donald Hoffman Excei Services (DEC contractor), President G. DarrellGardner Excel Services (DEC contractor), ITS Lead Technical Author Tom Porter Excel Services (DEC contractor), ITS Technical Author Ed Lozito Scientech (NRC contractor)

R. S. Barsh Virginia Power Co.

I.

Enclosure 1 I

L-L 1 , . -, -

e O Tentative Agenda NRC and Duke Energy Corproation Meeting on Review of Improved Technical Specifications I

Catawba and McGuire Nuclear Stations October 30,1997 Introductions and Remarks - Duke /NRR Personnel 12:30 p.m.

Introduction of Participants Purpose of Meeting Implementation Project Overview - Luellen Jones Organization Coordination of Issues Between Sites Comment Resolution Process Comments Needed on Section Basis Need Difficult Sections Early Content / format of ITS Supplements Close coordination with OTSB/ Duke Project Leads Catawba /McGuire implementation Schedule - Luellen Jones, James Snyder, Lawrence Rudy Need for Concurrent McGuire/ Catawba Review Specific Outage Windows Tralning Procedures License Amendments to the Current Technical Specifications - Luellen Jones Minimize Additional Changes Supplement to ITS Status of TS Branch Review- C. Harbuck, W. Beckner, H. Berkow 1:00 p.m.

Schedule for Completing Review Significant Technical Issues Closing Remarks -- Duke and NRC Personnel Enclosure 2 we m gyrN T'- - .. -- -c. w -+w -

w

l Agenda  !

Improved Technical Specifications (ITS) Meeting with NRC October 30,1997 - ONRR Offices Introductions and Remarks Duke /NRR

. Introduction of Participants

. Purpose of Meeting l

. Implementation Project Overview LBJ 1 i

. Organization Coordination of lesues Between Sites

. Comment Resolution Process

. Comments Needed on Section Baals i

. Need Difficult Sections Early

. Content / format of ITS Supplements Close coordination with OTSB/ Duke Project Leads

. Catawba /McGuire implementation Schedule JES/LJR Need for Concurrent McGuire/ Catawba Review

. Specific Outage Windows

. Operator Training

. Procedures License Amendments to the Current Technical Specifications LBJ

. Minimize Additional Changes

. Supplement to ITS Status of Technical Specificat!ons Branch (OTSB) Review NRR

. Schedule for Completing Review

. Specific Milestones

. Significant Technicalissues

. Closing Remarks Duke /NRC Personnel Enclosure 3

, i l Agenda improved Technical Specifications (ITS) Meeting with NRC October 30,1997 - ONRR Offices e

introduction and Remarks ,

introduction of Participants James Fisicaro/NRR Personnel Purpose of Meeting James Fisicaro Duke requests this meeting with the NRC to discuss our implementation of McGuire and Catawba improved Technical Specifications.

Significant issues to be discussed include:

Overview of the implementation phase of the conversion project The necessity for logical comment resolution process which meets both NRC and Duke needs to effectively utilize limited resources The implementation schedula priority for each site Impact of subsequent license amendments on ITS submittal Determine NRC detailed schedule for conversion review I

. o ADenda Improved Technical Specifications (ITS) Meeting with NRC '

October 30,1997 ONRR Offices

  • Implementation Project Overview Organization Coordination of issues Between Sites Comment Resolution Process Duke requests that the NRC screen contractor comments to svold problems experienced by other utilities Close coordination with OTSB/ Duke project leads is a must Comments Needed on Section Basis Effectively utilizes resources To prepare any required supplements To facilitate procedure changes Need Difficult Sections Early Sections 3.3 and 3.8 are essential Spreads the procedure change impact over the longest duration.

Content / format of ITS Supplements Written responses provided for all written co nments Comments i.eeded in electronic format to facilitate written responses ITS submittal supplements on section basis. Chan0es indicated by revision bars and/or bold markups as applicable to facilitate NRC review Timely responses needed to all supplements to facilitate comment closure and procedure preparation.

l 2

Agenda improved Technical Specifications (ITS) Meeting with NRC October 30,1937 - ONRR Offices '

Catawba /McGuire implementaticn Schedule JES/LJR Need for concurrent reviews Specific Outage Windows implementation - minimum of 3 months after issuance of draft SER McGuire driving the need date Resources needed to support outages prior to ITS implementation Maximize time to process changes to programs and procedures Minimizo the time required to maintain dual procedures Operator Training McGuire operator training for ITS scheduled Feb-April 1998 Catawba operator training for ITS scheduled May-July 1998 Proceduros Procedure changes after comment resolution on each section Minimize the time required to maintain dual procedures 3

l Agenda )

i improved Technical Specifications (ITS) Meeting with NRC '

October 30,1997 ONRR Offices i e

License Amendments to the Current Technical Specifications LBJ Minimize additional changes Necessitated by modifications or identified problems Supplomont to ITS Shuuld package for supplemental ITS submittal include?

iTS and ITS Bases markup ITS and ITS Bases retyped pages Revised CTS markup DOCS retyped pages Flevised NUREG & Bases M9rkup Justification for Deviation retyped pages No Significant Hazards retyped,pages i

4

=.