Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20039F4907 January 1982Notifies of Change in Discharge Flow & Discharge & Monitoring Locations Per NPDES Permit Requirements.Changes Reflect Const Progress.Future Changes Expected Due to Completion of Final Grading & Seeding
ML20040C21517 December 1981Notifies of Noncompliance W/Effluent Limitations.Samples Collected on 811209 Exceeded Permit Limitations.Caused by Sewage Treatment Sys Overload & Lack of Chlorination.Faulty Equipment Replaced
ML20040C38722 January 1982Notifies of Noncompliance W/Npdes Permit Limitations.On 820118,laundry Draining Tank Discharge Sample Exceeded Daily Max Limit for Suspended Solids.Caused by Filtration Sys Failure.Tank Contents Reprocessed
ML20042E0862 April 1990Responds to Issues Noted During 891204-06 Compliance Sampling Insp.Corrective Actions:River Level Monitoring Sys Inspected at Least Twice Per Month & Diffuser Pond Bubbler Gauge Sys Inspected Once Per Wk
ML20043A0378 May 1990Forwards Document Outlining TVA Evaluation of Options for Preventing Damage to Fish & Aquatic Life from Plant Discharges,In Response to 900117 Order
ML20052A46523 April 1982Submits NPDES Noncompliance Notification.On 820217,samples of Concrete Batch Plant Settling Pond Effluent Exceeded Daily Max Permit Limitation.Caused by Excessive Rainfall Runoff.Runoff Will Be Rerouted Away from Settling Pond
ML20055A2619 December 1981Summarizes Delivery Schedule for Prompt Notification Sys Equipment.Final Shipment Scheduled for 820129Siren
ML20062J60828 October 1980Requests 90-day Extension to Permit Mod Granted Per ,Due to Operational Problems Encountered W/Vendor Solidification Sys.Operable Solidification Sys Expected to Be Available by 810114Boric Acid
ML20062L20819 January 1981Informs of Mechanical Malfunction of Water Treatment Plant Floctreater on 801001.Equalization Tank Sludge Built Up on Hydraulic Line & Caused Crimping Which Shut Down Operations. Sludge Rerouted to Makeup Demineralizer Sump
ML20062N63611 January 1994Discusses Water Storage at Cowanesque Reservoir Power Uprate Evaluation
ML20063H16626 August 1982Advises That Author Is No Longer Counsel in Case.Name Should Be Removed from Svc List
ML20064F52030 December 1982Notifies of NPDES Noncompliance:On 821123,sewage Treatment Plant Effluent Grab Sample Collected 821116 Exceeded Limitation of 45 Mg/L.Caused by Sys Overload Due to Excessive & Surging Flow.Design Changes Being ReviewedGrab sample
ML20064N07331 August 1982Notifies of 820803 Release of Sodium Hypochlorite Solution Into Yard Drainage Sys.Cause Not Stated.Release Terminated on 820804.Monitoring Performed Until Diffusure Gate Discharge Returned to ComplianceGrab sample
ML20069B9042 March 1982Forwards NPDES Discharge Monitoring Rept for 811101-820201
ML20069H69231 March 1983Advises That Total Residual Chlorine Data Presented in Discharge Monitoring Repts from Aug 1982 to Jan 1983 Performed W/Color Comparator Instead of Amperometric Titration Method.Amperometric Titrator Inoperable
ML20070D83129 June 1994Responds to NRC Questions Posed During Telcons & Provides Current Westinghouse Position on Containment & Accumulator Initial Temp Assumptions for Large Break LOCA Analysis. Current Accumulator Water Temp Assumed in Analysis 90 FBackfit
ML20078N9197 November 1994Discusses Investigation Re Capcitors Installed in HDR Converters
ML20079P29916 February 1983Forwards NPDES Noncompliance NotificationAccidental discharge
ML20079R0967 September 1979Forwards Project Status Rept,Jul 1979
ML20079R11815 July 1981Forwards Project Schedule Change Notice 2 Which Finalizes Rev 11 Dates Under Further Study.Related Info EnclBoric Acid
ML20080E69120 August 1980Forwards Audit Trend Analysis Rept.Vendor Requested to Respond to Trends Identified within Summary & Conclusion, Indicating Corrective Actions to Prevent Reoccurrence.Dates When Corrective Actions Will Be Completed Also Requested
ML20080G64111 July 1983Responds to 830708 Telcon Request.Util Prepared to Support Exercise of Radiological Emergency Response Interim Plan for Implementing Compensating Measures for Rockland County, During Wk of 830808
ML20081C0625 April 1983Forwards Analyses of Steam Generator Tube Ruptures in Arkansas Nuclear One,Unit 2, Dtd Apr 1983.Work Documented in Rept Performed as Part of Severe Accident Analysis Program at NRC Request
ML20083H44429 December 1983Designates MP Schmierback,Rj Johnson & DM Mccarthy as Acting Officials During Author Absence
ML20083J48729 December 1983Designates MP Schmierback,Rj Johnson & DM Mccarthy as Acting Officials During Author Absence
ML20086A77814 October 1983Forwards Validation of Computerized Thermal Compliance & Plume Development at Sequoyah Nuclear Plant. EPA Approval of Compliance Method Requested
ML20086D96513 November 1991Advises That Util Intends to Bury Polychlorinated Biphenyl Sediments,Containing Low Levels of Radioactivity,Onsite.Util Will Pursue NRC Approval Per 10CFR20.302.Requests Concurrence Re Disposal of Matl
ML20087G56212 March 1984Submits Addl Info on Util Initiatives in Pra,Per Response to .Effort to Reduce Number of Violations & Risks MaintainedProbabilistic Risk Assessment
ML20087M06122 September 1983Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna
ML20090F56329 June 1983Forwards Aquatic Environ Conditions in Chickamauga Reservoir During Operation-Second Annual Rept 1982, Per NPDES Permit TN0026450
ML20092G10719 June 1984Forwards Erosion Control Rept,Winter 1983 - Spring 1984. Control Measures Implemented in Five Areas W/Five More to Be Completed in Fall 1984
ML20092N54928 June 1984Forwards Aquatic Environ Conditions in Chickamauga Reservoir During Operation of Sequoyah Nuclear Plant,Third Annual Rept,1983
ML20099B55628 February 1985Forwards Revised NPDES Discharge Monitoring Rept,Apr-Aug 1984. Rev Results from Changes in Original Flow Values Reported
ML20107J49629 October 1984Forwards Revised NPDES Discharge Monitoring Repts for Aug 1984.Revs Required Due to Typo & Transpositional Errors
ML20115D55313 October 1992Forwards Comments on Generic Fundamentals Exam,Per NUREG-1021-ES-201,administered on 921007
ML20125C07931 May 1985Forwards Revised Discharge Monitoring Rept for Dec 1984, Reflecting Permit Limit Changes
ML20126J51226 March 1981Submits Notification of Noncompliance W/Effluent Limitation. Samples Collected from Radwaste Discharge Sys on 810319 Contained Oil & Grease Exceeding Max Permit Limitation.Cause Unknown.Laundry Drain Tank Contents Reprocessed
ML20126J51716 April 1981Submits Notification of Noncompliance W/Effluent Limitation. Sample of Suspended Solids Collected 810407 Exceeded Max Permit Limitation.Caused by Poor Flow Equalization,Increased Flows & Loadings & Insufficient Aeration.Mods Underway
ML20126M1925 June 1981Forwards Two Sets of EPA Form 3510-1 & 3510-2C,Section 5, Per Discussion W/C Kaplan.Priority Pollutant Data for Current Outfall Will Be Provided by Sept 1981.Requests That Info Be Included in New 5-yr NPDES Permit
ML20133L19118 October 1985Forwards Revs to NPDES Discharge Monitoring Rept for Apr 1985. Revs Correct Figure Reported for Reservoir Temp Rise & Provides Previously Omitted Data on Downstream Temp
ML20138F58918 October 1985Forwards Revised Discharge Monitoring Rept for Aug 1985. Original Submission Indicated Min Ph of 7.2 Which Is Incorrect Rounding Off of True Min Ph of 7.62
ML20140F88525 June 1985Forwards Aquatic Environ Conditions in Chickamauga Reservoir During Operation of Sequoyah Nuclear Plant,Fourth Annual Rept 1984. Rept Provides Recommendations for Future Direction of Each Type of Aquatic Monitoring
ML20141H27611 July 1997Forwards Demolition/Removal Permit Application for SQN Re Scheduled Demolition of Four Aercw Cooling Towers from 970728 to 0831
ML20148J32825 March 1988Advises That Repairs to Sedimentation Pond Now Finished But Testing Has Not Yet Been Completed.Rept Will Be Submitted by 880515 Rather than 880401
ML20148L69230 March 1988Notifies of Proposed Use of Sodium Bromide in Addition to Sodium Hypochlorite in ERCW Sys to Control Biofouling.Use of Bromide Reduces Total Residual Chlorine & Aids in Compliance W/Npdes Permit.Info on Products Being Considered EnclGrab sample
Biofouling
ML20149K74723 July 1997Submits Cancellation of Scheduled Demolition of Four Aercw Cooling Towers to Begin 970728 & End on 970831
ML20150A82129 June 1988Responds to Re Violations Noted in Insp Repts. Corrective Actions:Sewage Being Routinely Pumped from Sys & Hauled to Chattanooga Regional Sewage Treatment Facility to Minimize Potential for Noncompliances
ML20151K49228 July 1988Notifies That Sedimentation Pond Rept Scheduled to Be Submitted on 880729 Will Be Submitted by 880901 Due to Improper Priority Assignment
ML20151T1191 September 1998Forwards Revised Flow Diagram & EPA Form 3510-2C Re NPDES Permit TN0026450 - ERCW Discharge
ML20151V36616 August 1988Confirms 880804 Telcon Between Util & Tennessee Div of Water Pollution Control Re Chickamauga Reservoir Temps.Telcon Informs That River Temps Upstream & Downstream Periodically Exceeded 86.9 Degrees F on 880801,02 & 03