Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20150F170 | 5 February 1979 | Summary of 790201 Affirmative Session 79-2 in Washington,Dc Re SECY-79-17,FOIA Appeal of a Kranish & Settlement & Termination of Special Proceeding | |
ML20151B271 | 12 July 1988 | Summary of 880620 Meeting W/Util Proposed Restart Technical Verification Program for Plant & Safety Sys Functional Insp Currenty Being Conducted at Site.Viewgraphs,List of Attendees & Insp Plan Encl | |
ML20151H734 | 21 July 1988 | Summary of 880630 Meeting W/Util in Rockville,Md Re Criteria of IE Bulletin 79-14 Resolution at Facility | |
ML20151K690 | 18 July 1988 | Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl | Stroke time |
ML20151K736 | 15 April 1988 | Summary of Operating Reactors Events Meeting 88-15 on 880412.List of Attendees & Viewgraphs Encl | Missed surveillance |
ML20151L452 | 27 July 1988 | Summary of 880621 Meeting W/Util in Rockville,Md Re Plant Restart Test Program.Meeting Roster,Agenda & Procedures Encl | |
ML20151M710 | 24 December 1985 | Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl | |
ML20151N052 | 26 July 1988 | Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl | |
ML20151N261 | 3 May 1988 | Summary of 880429 FEMA Meeting W/Util to Assure That All Parties Concerned W/Conduct of Plant Exercise Had Consistent Understanding of Situation | |
ML20151N302 | 19 December 1985 | Summary of 851216 Operating Reactor Events Meeting 85-27. Attendance List,Viewgraphs of Events Discussed,Significant Event Elements,Assignment of Followup Review Responsibility & Status of Previous Assignments Encl | |
ML20151Q813 | 3 August 1988 | Summary of Operating Reactors Events Meeting 88-031 on 880802.Viewgraphs & List of Attendees Encl | |
ML20151R539 | 8 August 1988 | Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed | |
ML20151R691 | 4 August 1988 | Summary of 880721 Meeting W/Util in Rockville,Md Re Plant Electrical Cable Installation.List of Attendees & Viewgraphs Encl | Condition Adverse to Quality FLEX Backfit |
ML20151R870 | 5 August 1988 | Summary of 880726 Meeting W/Util in Arlington,Tx Re 5-yr Business Plan.Handouts Encl | |
ML20151S867 | 9 August 1988 | Summary of 880707 Meeting W/Util at Plant Site Re Fuel Load Issues & Power Ascension Plans.Viewgraphs,Agenda & List of Attendees Encl | |
ML20151W004 | 12 March 1987 | Submits After Trip Rept | |
ML20151W514 | 21 April 1988 | Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl | Boric Acid Non-Destructive Examination Safe Shutdown Earthquake |
ML20151X001 | 10 September 1998 | Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl | |
ML20151Y630 | 19 August 1988 | Summary of 880811 Meeting W/Util in Rockville,Md Re Control Room Ventilation Sys.List of Meeting Attendees & Viewgraphs Encl | |
ML20151Z421 | 25 August 1988 | Summary of 880818 Meeting W/Util in Rockville,Md Re License Amend Application to Permit Performance of Leak Rate Tests of Containment Isolation Valves in Parallel W/Refueling Operations | Shutdown Margin |
ML20151Z792 | 25 August 1988 | Summary of 880817 Meeting W/Util in Rockville,Md Re Util 5-yr Business Plan to Improve Safety & to Reduce Operating Costs at Plant.List of Attendees & Handouts Encl | |
ML20153B002 | 14 March 1988 | Trip Rept of 880222-26 Site Visit Re Audit of Control Room Design & Procedures Generation Package | |
ML20153B028 | 22 June 1988 | Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl | Unanalyzed Condition |
ML20153C186 | 23 August 1988 | Summary of Operating Reactors Events Meeting 88-34 on 880823 | |
ML20153G548 | 4 May 1988 | Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items | |
ML20153G633 | 30 August 1988 | Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program | |
ML20154A779 | 1 September 1988 | Summary of 880810 Meeting W/Util in Decatur,Al Re Diesel Generator Concerns Resulting from Restart Test Program.List of Attendees,Agenda & Related Info Encl | |
ML20154A899 | 4 May 1988 | Summary of Operating Reactors Events 88-18 Meeting on 880503 Re Events Which Occurred Since 880426 Meeting.List of Attendees & Viewgraphs Encl | |
ML20154C010 | 26 February 1986 | Summary of 860122 Meeting W/B&W & Util Re B&W Plan for Licensing Fuel Loading in Plants W/Westinghouse Nsss. Viewgraphs Encl | |
ML20154C477 | 2 October 1998 | Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling | Anticipated operational occurrence Recently irradiated fuel |
ML20154C993 | 24 February 1986 | Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl | Fire Watch |
ML20154D272 | 9 May 1988 | Summary of 880428 Meeting W/Util Re Util 880404 Fire Protection Rept,Including App R Exemption Requests & Plant Safe Shutdown Analysis.List of Attendees,Licensee Slides & Handouts Encl | Safe Shutdown Emergency Lighting Exemption Request Fire Protection Program |
ML20154F797 | 15 September 1988 | Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl | |
ML20154J406 | 17 May 1988 | Summary of 880414 Meeting W/Representatives & Contractors of Licensee in Rockville,Md Re 870605 Amend Application for Util.Highlights of Discussion Listed.Nrc Indicated That Request for Addl Info Would Be Prepared If Needed | |
ML20154K217 | 5 March 1986 | Summary of Allegation Review Board 860210 Meeting.Listed Actions to Close Allegations RIII-86-A-002,RIII-86-A-0007, RIII-86-A-011,RIII-85-A-0188,RIII-85-A-0208 & RIII-86-A-003 Agreed Upon | |
ML20154L166 | 10 May 1988 | Trip Rept of 880412-15 Mgt Team Visit to Plant Sites,Two Matls Licensees & Region I Ofcs.List of Team Members & Summary of Observations & Perceptions from Visit Encl.Info Deleted | |
ML20154L918 | 6 March 1986 | Trip Rept of 851021-24 Site Visits Re Wrong Unit/Wrong Train Events to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented | |
ML20154N342 | 24 May 1988 | Summary of 880426 Meeting W/Tva Re Restart Testing Program at Plant.List of Attendees & Viewgraphs Encl | |
ML20154N447 | 7 September 1988 | Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl | Fuel cladding |
ML20154N831 | 11 March 1986 | Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits | Anchor Darling |
ML20154N875 | 12 March 1986 | Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl | |
ML20154P007 | 12 March 1986 | Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl | |
ML20154Q558 | 29 September 1988 | Summary of 880913 Meeting W/Util at Sequoyah Site to Discuss Browns Ferry Unit 2 Fuel Load.List of Attendees & Viewgraphs Encl | |
ML20154S034 | 27 May 1988 | Summary of 880519 Meeting W/Middle South Utils Representatives Re Proposed Establishment & Licensing of Middle South Utils Nuclear Operating Co.Agenda Encl | |
ML20155B071 | 27 May 1988 | Summary of 880518 Meeting W/Tva Re Resolution of Restart Item Identified as Plant Pra.List of Attendees & Slides Encl | Internal Flooding Probabilistic Risk Assessment |
ML20155B823 | 20 September 1988 | Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams | Fire Watch |
ML20155E405 | 13 March 1973 | Summary of 730223 Meeting W/Util in Bethesda,Md Re Fission Product Transport Modeling for Containment,Following Design Basis Loca.Meeting Attendees Encl | |
ML20155F053 | 29 March 1974 | Summary of 740116 Meeting W/Util in San Jose,Ca Re Staff Review of Proposed Containment Design.Meeting Agenda Encl | |
ML20155F176 | 2 April 1974 | Summary of ACRS 740307 Meeting to Review Util Application Re Listed Items.Transcript of Proceedings Available | |
ML20155F191 | 14 May 1974 | Summary of 740430 & 0502 Meetings W/Util in Bethesda,Md Re Applicant Proposed Rev to Combustible Gas Control Sys Design |