Summary of 880621 Meeting W/Util in Rockville,Md Re Plant Restart Test Program.Meeting Roster,Agenda & Procedures Encl
ML20151L452
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/27/1988
From: Moran D
NRC OFFICE OF SPECIAL PROJECTS
To:
NRC OFFICE OF SPECIAL PROJECTS
Shared Package
ML18033A295 List:
References
TAC-62264, NUDOCS 8808040036
Download: ML20151L452 (8)


Text

.

.[6G CtGy%

. UN.TED STATES

'g

!" c o NUCLEAR REGULATORY COMMISSION h -

WASHINGTON, D. C. 20555 pY

          • July 27,1988 Cocket No. 50-260 LICEP Nnnessee Valley Authority F AC.I L - owns Ferry Nuclear Plant (BFN), Unit 2 SUBJEC .0MMARY OF MEETING WITH TVA CONCERNING BROWNS FERRY NUCLEAR (BFN) PLANT RESTART TEST PROGRAM - JUNE 21, 1988 (TAC NO. 62264)

The meeting was convened at 8 a.m. June 21, 1988 in Room 12-13-9 One White Flint North with the Tennessee Valley Authority (TVA).

The meeting roster is included as Enclosure 1; the agenda is Enclosure 2.

The purpose of this meeting was for TVA/BFN to provide certain Restart Test Program (RTP) test procedures and related data found necessary for NRC staff review of the BFN RTP, The staff was provided clarification of the preparation flow for test procedure generation. BFN provided a block diagram (Enclosure 3) which tarves to clarify the relationship of major aspects of the RTP, TVA explaiaed that Volume 3 of the Nuclear Performance Plan provides, in Section III 8, the foundation for the BFN Restart Test Program. Site Directors Standard Practice (SDSP) 12.1 and 12.2 (Enclosures 4 and 5) are TVA's guiding documents for the restart test program and system test specifications respectively. SDSP 12.1 and 12.2 are applied to the Baseline Test Requirement ,

Document which represents the source control document for most restart tests. )

The Restart Test Program encompasses tests of 47 Unit 2 plant systems (including parts of shared systems from units 1, and 3). In addition to the ,

system terts, loss of power / loss of coolant accident LOP /LOCA tests pursuant j to Regulatory Guide (RG) 1.41 are included in the RTP. The RTP provides l cold functional test to address epfrator training needs and for B0P testing. I Backup control test provides test data which varifies that shutdown boards can '

indeed be controlled from both the remote and local controls.

TVA provided information requested in the April 26, 1988 meeting concerning  ;

the Restart Test Progam. This includes documentation and justification of '

"fferences between typical preoperational test requirements and the BFN RTP.

inis information is included as Enclosure 6 entitled, "Browns Ferry Nuclear  !

Plant Assessment of Test Requirements for Fully Intergrated System Functional Testing." Also requesteo by the staff at the April 26, 1988 meeting was a list of previously run test data (sis, EMIS, etc.) which will be used by the restart test program in lieu of actual testing. This information was provided by TVA and is included as Enclosure 7. TVA was also requested to provide a general description of testing to be accomplished during integrated cold functional testing LOP /LOCA and remote shutdown drill. TVA provided the staff with two procedures in response to this; Special Test 88-16, Rev. 0, dated August 25,1987, "Diesel Generator A Emergency Load Acceptance Test," Enclosure 8 and Special Test 88-17, Rev. 0, dated December 10, 1987, "Diesel Generator B, Load Acceptance Test," Enclosure 9. TVA also made available the RTP documents used for the Standby Gas Treatment and Standby Diesel Generator Systems. These 8808040036 DR 880727 ADOCK 05000260

[ t//

are test instructions for Secondary Containment Test No. 2-BFN-RTP-065 Rev. 1-August 19, 1987; with Baseline Test Requirements BFN-BTR0-029 July 27,1^. ,

Enclosure 10 and Test Instruction for Standby Diesel Generator Test No. 2-BFN-RTP-082 Rev. 001; with Baseline Test Requirements BFN-BTRD-039 April 15, 1988, Enclosure 11. .

TVA described the RTP organization as being essentially the same as described in the July 13, 1987 TVA letter concerning Refinement of the Restart Test Program (Gridley to NRC Document Control Desk, Accession No. 870721064). The only change is that the RTP Manager reports to the Plant Manager instead of directly to the BFN Site Director.

Day orah, Pr TVA Projects Division Office of Special Projects

Enclosure:

1. Attendance List
2. Agenda cc w/ enclosures See next page 1 l

l l

l I

l

. i I

Enclosure 1 j LIST OF ATTENDEES l June 21, 1988 RTP MEETING WITH TVA l

NAME Organization Telephone David H. Moran NRC/0SP 492-0766 Thomas S Rotella NRC/0SP 492-0788 Angelo Marinos NRC/0SP 492-3317 Don Hosmer TVA 205-729-3100 David Skridulis TVA 205-729-2070 Danny Walker TVA/DNF 615-632-8479 Hukam Garg NRC/OSP 492-0789 Hugo Pomrohn TVA/BFN/ Site Director 205-729-3675 Mike May TVA/BFN/ Licensing Manager 205-729-3570 Jack Scarborough NRC/0CM/KR 301-492-1850 l 1

i i

l

Enclosure 2 Agenda TVA/NRC Meeting June 21, 1988 RESTART TES'T PROGRAM

Purpose:

The purpose of the meeting is to provide the remaining clarification of items that are required for NRC to develop a safety evaluation report on BFNs restart testprogram(RTP). The items were requested by NRC in previous meetings and are detailed as follows:

- Provide a complete list of previously run tests that will be used in lieu of a restart test including justificatior, for their use and assurance that the tests incorporate changes to the plant configuration.

- Identify the total scope of testing that will not be performed by RTP that would normally be tested during the startup of a new plant.

- Review previously sent clarification of RTP and provide program summary for NRC reviewers.

l l

l l

Enclosure 3 Nuclear Performance Plan Vc ae ill Section 8 Restart Test Program .

Restart Test Program Development of System implementation Test Specifications

  • SDSP 12.1
  • SDSP 12.2

-[

Restart Test Procedures -~ System Test Specifications -2 Baseline Test Requirement Documents il Integrated RTP Loss of Power / Cold Functional MP System Loss of Cootant Test Control Tests Accident Tests Test

  • Site Directors Standard Practice

Mr. S. A. White Browns Ferry Nuclear Plant Tennessee Valley Authority Units 1, 2, and 3 cc:

General Counsel Regional Administrator, Region II Tennessee Valley Authority U.S. Nuclear Regulatory Commission 400 West Summit Hill Drive 101 Marietta Street, N.W.

Atlanta, Georgia 30323 E11 B33 Knoxville, Tennessee 37902 l Resident inspector / Browns Ferry NP Mr. R. L. Gridley U.S. Nuclear Regulatory Comniission Tennessee Valley Authority Route 12, Box 637 SN 157B Lookout Place Athens, Alabama 35611 1 Chattanooga, Tennessee 37402-2801 Or. Henry Myers, Science Advisor Mr. H. P. Pom:ehn Committee on Interior Tennessee Valley Authority and Insular Affairs Browns Ferry Nuclear Plant U.S. House of Representatives l P.O. Box 2000 Washington, D.C. 20515 l Decatur, Alabama 35602 Mr. M. J. May Tennessae Valley Authority  !

Browns Ferry Nuclear Plant P.O. Box 2000 Decatur, Alabama 35602 Mr. D. L. Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 885 Knoxville, Tennessee 37902 )

l Chairman, Limestone County Commission l P.O. Box 188 Athens, nlabara 35611 Claude Earl Fox, M.D.  :

State Health Officer l State ocoartment of Public Health State Office Building Montgomery, Alabama 36130 l l

l l

Y

I, are test instructions for Secondary Containment Test No. 2-BFN-RTP-065 Rev.1-August 19, 1987; with Baseline Test Requirements BFN-BTR0-029 July 27,1987, Enclosure 10 and Test Instruction for Standby Diesel Generator Test No. 2-BFN-RTP-082 Rev. 001; with Baseline Test Requirements BFN-BTRD-039 April 15, 1988, Enclosure 11.

TVA described the RTP organization as being essentially the same as described in the July 13, 1987 TVA letter concerning Refinement of the Restart Test Program (Gridley to NRC Document Control Desk, Accession No. 870721064). The only change is that the RTP Manager reports to the Plant Manager instead of directly to the BFN Site Director.

Original signed by David H. Moran, Project Manager TVA Projects Division Office of Special Projects

Enclosure:

1. Attendance List
2. Agenda cc w/ enclosures See next page OSP:TVA/LA 1 V Yjft .TVA/PM T .O MSinus tihY la' t- an A ack i 7/p/88 / /88 7 /88 Q /88 l 1

l

l 1

DISTRIBUTION FOR MEETING NOTICE DATED: July 27, 1988 Facility: Browns Ferry Nuclear Plant, Unit 2 i

Dockit o'r/ Central: Filed )

'NRC PDR l Local POR ,

Projects Reading J. Partlow J. Axelrad S. Richardson S. Black l B. D. Liaw j B. Hayes 3-E-4 F. McCoy Ril f F. Miraglia E. Jordan W. S. Little (BFN only) RII M. Simms l B. Zalcman E. Goodwin D. Moran W. Lanning 11-E-22 J. Rutberg 15-B-18 j T. Rotella i Angelo Marinos H. Gar I ACRS ( 0)

GPA/PA 2-G-5 GPA/CA(5)

J. Scarborough P. Gwynn 16-H-3 i

C. Ader 16-H-3 T. Elsasser 16-H-3 M. Callahan 16-G-19 Browns Ferry Rdg. File TVA-Rockville

  • cc: Licensee / Applicant & Service List I l