Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19324C28230 October 1989Forwards Proposed Administrative Changes to Util 871028 Application for Amends to Licenses NPF-35 & NPF-52.Request Included Changes to Tech Spec Index & Are Administrative in Nature
ML19325C53210 October 1989Responds to NRC 891010 Ltr Re Violations Noted in Insp Repts 50-413/89-09 & 50-414/89-09.Corrective Actions:Maint Mgt Procedure Re Control of Standing Work Request Program Will Be Revised to Ensure Experts Notified
ML19325E16023 October 1989Forwards Addl Info Re Five Section D Items in SER Accepting Steam Generator Tube Rupture Analysis Methodology Documented in WCAP-10698,per NRC Request.Revised FSAR Table 15.6.3-1 Will Be Included in Future FSAR Update
ML19326D7031 July 1980Forwards Application for Amend to CPPR-116 Consisting of Addition of co-owners & co-applicants
ML19326E25817 July 1980Ack Receipt of IE Insp Repts 50-413/80-08 & 50-414/80-08 on 800512-16.No Proprietary Info
ML19327A55128 July 1980Submits Info Re Target Dates for Fuel Loading in Response to 800711 Ltr.Mcguire 2 Scheduled for Jun 1982,Catawba 1 Scheduled for Aug 1983 & Catawba 2 Scheduled for Feb 1985
ML19330B44016 July 1980Responds to NRC 800702 Ltr & Forwards Evacuation Time Estimates for Evacuation of Areas Around Units 1 & 2. Oversize Map Forwarded to a SchwencerSiren
ML19330B62929 July 1980Forwards Compilation of Projected Loads,Capacities & Reserves,Reflecting long-term Forecast for 1983-1991.Results Indicate Reserve Levels in 17-25% Range
ML19331C3755 August 1980Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Fusion Welded Pipe Not Used in safety-related Sys
ML19332A29813 August 1980Ack Receipt of IE Insp Repts 50-413/80-13 & 50-414/80-13 on 800618-20.No Proprietary Info
ML19332A66720 August 1980Responds to IE Bulletin 80-20 Re Failures of Westinghouse W-2 Spring Return to Neutral Control Switches.Identified Switches Are Not Used or Planned for Use in safety-related Areas.Thirteen Manhours Expended for Review
ML19332B92415 November 1989Forwards 12th Quarterly Update to Unit Startup Rept for Cycle 1,per Tech Spec 6.9.1.3.Addl Quarterly Updates to Startup Rept Will Be Submitted
ML19332C46315 November 1989Forwards Monthly Operating Repts for Oct 1989 & Monthly Operating Status Rept for Sept 1989 for Catawba Nuclear Station,Units 1 & 2
ML19332C9299 November 1989Forwards Public Version of Revised Epips,Including RP/0/A/5000/02, Notification of Unusual Event, RP/0/A/5000/03, Alert, RP/0/A/5000/04, Site Area... & RP/0/A/500/05, General.... W/891120 Release MemoEarthquake
ML19332E74630 November 1989Responds to NRC 891103 Ltr Re Violations Noted in Insp Repts 50-413/89-29 & 50-414/89-29.Corrective Actions:Control Room Penetrations Inspected & Changes Will Be Made to Performance Surveillance Test ProcedureFire Watch
ML19332E77130 November 1989Withdraws 880701 Proposed Amend to Licenses NPF-35 & NPF-52
ML19332F3597 December 1989Forwards Supplemental Response to Insp Repts 50-413/89-33 & 50-414/89-33 Re Type C Valves,Per H Whitener Request
ML19332F3728 December 1989Forwards Updated 890331 Prioritized Listing of OL Amends & Tech Spec Amends.Listing Intended as Guidance to Be Used in Allocating Resources for Review & Issuance of Proposed AmendsBoric Acid
ML19332F5898 December 1989Forwards Suppl Info Re Basis of Composite Spectra Shown in Figure 2 of 891017 SubmittalEarthquake
ML19332F77913 December 1989Forwards Rev 25 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML19336A64215 August 1980Responds to NRC 800718 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05,50-413/80-09,50-414/80-09, 50-491/80-07,50-492/80-06 & 50-493/80-06.Corrective Actions: Records Storage Facility Constructed
ML19337B01129 August 1980Forwards Supplemental Response to NRC 800715 Ltr Re Violations Noted in IE Insp Repts 50-413/80-11 & 50-414/80-11.Corrective Actions:Insp Program for Electrical Cables Revised
ML19337B0175 August 1980Responds to NRC 800715 Ltr Re Violations Noted in IE Insp Repts 50-413/80-11 & 50-414/80-11.Corrective Actions:Insp Instructions Revised to Reflect Insp of All Interconnecting Wiring & Cabling & Const Procedure Implemented
ML19338C5836 August 1980Responds to IE Bulletin 80-16, Potential Misapplication of Rosemount,Inc Model 1151 & 1152 Pressure Transmitters W/ Either a or D Output Codes. Review of Pressure Transmitters Conducted
ML19338D09116 September 1980Responds to NRC 800520 Ltr Re NUREG-0577, Potential for Low Fracture Toughness & Lamellar Tearing on PWR Steam Generator & Reactor Coolant Pump Supports. No Response Needed,Pending Addl NRC Guidance
ML19338D98119 August 1980Responds to NRC 800623 Ltr Re Violations Noted in IE Insp Repts 50-413/80-10 & 50-414/80-10.Corrective Actions:Util Will Insp Addl Component Support Welds
ML19338D98819 August 1980Responds to NRC 800725 Ltr Re Violations Noted in IE Insp Repts 50-413/80-15 & 50-414/80-15.Corrective Actions:Qc Welding Inspectors Restrained in Requirements of QA Procedures M-19 & M-4.Emphasis Placed on Documentation
ML19338D98915 July 1980Responds to NRC 800623 Ltr Re Violations Noted in IE Insp Repts 50-413/80-10 & 50-414/80-10.Corrective Actions:Insp of Component Support Welds Initiated
ML19338E2659 September 1980Ack Receipt of IE Insp Repts 50-413/80-20 & 50-414/80-20 on 800804-08.No Proprietary Info
ML19338G52125 August 1980Forwards Response to NRC 800801 Ltr Re Violations Noted in IE Insp Repts 50-413/80-14 & 50-414/80-14.Corrective Actions:Supplemental Insp Instructions Issued to Include Checks for Freedom of Movement on Applicable Supports
ML19338G5279 September 1980Forwards Response to NRC 800815 Ltr Re Violations Noted in IE Insp Repts 50-413/80-16 & 50-414/80-16.Corrective Actions:Ltr Explaining Abbreviation & Defining All Ref Documents Will Be Sent to Design Engineering & Const Depts
ML19339A46920 October 1980Ack Receipt of IE Insp Repts 50-413/80-25 & 50-414/80-25,on 800908-12.No Proprietary Info
ML19339A56926 September 1980Responds to NRC 800829 Ltr Re Violations Noted in IE Insp Repts 50-413/80-17 & 50-414/80-17.Corrective Actions: Procedure 427 Issued Re Process Control Requirements for ASME Class A,B & C Welds
ML19339C09029 October 1980Ack Receipt of IE Insp Repts 50-413/80-26 & 50-414/80-26. No Proprietary Info
ML19340B16415 October 1980Forwards Results of Jul 1979-June 1980 Interim Nonradiological Monitoring.No Mods to Study Sampling or Analytical Techniques Implemented from Studies Previously Submitted.No Distinct Changes in Lake Wylie Water Quality
ML19340C65021 November 1980Responds to NRC 801028 Ltr Re Violations Noted in IE Insp Repts 50-413/80-28 & 50-414/80-28.Corrective Actions: Supports Removed & Tray Mounted Correctly.Craftsmen Trained to Mount Supports Correctly
ML19340F07718 December 1980Responds to NRC 801210 Ltr Re Violations Noted in IE Insp Repts 50-413/80-33 & 50-414/80-33.Corrective Actions: Engineers Involved Will Be Retrained in Requirements of Procedure
ML19341C35112 February 1981Forwards Response to IE Bulletin 80-23.Coils of All Valcor Solenoid Valves W/Part Numbers V70900-21-1 or V70900-21-3 Will Be Replaced W/Coils of Improved Const by 810213.Valcor Is Submitting Proposed Testing Program
ML19341C7359 February 1981Ack Receipt of IE Insp Repts 50-413/80-36 & 50-414/80-36 on 801202-05.No Proprietary Info
ML19341C74131 December 1980Supplemental Response to NRC 801026 Ltr Re Violations Noted in IE Insp Repts 50-413/80-23 & 50-414/80-23.Corrective Actions:Battery Racks 1DGBA-B & 2DGBA-B Redesigned & Seismically Tested.Results Satisfactory
ML19341C74326 November 1980Responds to NRC 801026 Ltr Re Violations Noted in IE Insp Repts 50-413/80-23 & 50-414/80-23.Corrective Actions: Verification of Seismic Design Expected from Vendor by 801215.Util Will Submit Final Response After Review
ML19341C74410 November 1980Informs That CE Murphy 800926 Letter Forwarding IE Insp Repts 50-413/80-23 & 50-414/80-23 Not Received Until 801106.Response Will Be Provided by 801126
ML19343A41315 August 1980Advises That Final Response to IE Bulletin 80-09 Not Submitted Due to Necessary Info Not Available from Vendors. Final Rept Expected by 801201
ML19344A50817 July 1980Responds to NRC 800625 Ltr Re Violations Noted in IE Insp Rept 50-413/80-12 & 50-414/80-12.Corrective Actions:Qa Procedure 0-1 Revised to Include Insulation Testing Equipment
ML19344A62918 August 1980Forwards $4,000 Check for CP Amend Per NRC 800805 Ltr.W/O Encl
ML19344D22329 February 1980Forwards Interim Deficiency Rept Re Solid State Protective Relays & Trip Devices Not Meeting Characteristic Specs
ML19344F19528 August 1980Responds to IE Bulletin 80-19.Mercury-wetted Matrix Relays Are Not Used or Planned for Use in Reactor Protection Sys
ML19347C59518 December 1980Ack Receipt of IE Insp Repts 50-413/80-34 & 50-414/80-34 on 801105-07.No Proprietary Info
ML19347D8098 April 1981Forwards Application for Amend to CPPR-117,adding Piedmont Municipal Power Agency as co-owner & co-applicant of Facility.Encl Agreements & Audited Financial Statements Available in Central Files Only
ML19347F26413 May 1981Forwards Facility Project Power Sales Agreement Form for Inclusion in 810408 Application for Amend of CPPR-117 to Include Piedmont Municipal Power Agency as co-owner/ Applicant for Unit 2