Issue date | Title | Topic | |
---|---|---|---|
ML19324C282 | 30 October 1989 | Forwards Proposed Administrative Changes to Util 871028 Application for Amends to Licenses NPF-35 & NPF-52.Request Included Changes to Tech Spec Index & Are Administrative in Nature | |
ML19325C532 | 10 October 1989 | Responds to NRC 891010 Ltr Re Violations Noted in Insp Repts 50-413/89-09 & 50-414/89-09.Corrective Actions:Maint Mgt Procedure Re Control of Standing Work Request Program Will Be Revised to Ensure Experts Notified | |
ML19325E160 | 23 October 1989 | Forwards Addl Info Re Five Section D Items in SER Accepting Steam Generator Tube Rupture Analysis Methodology Documented in WCAP-10698,per NRC Request.Revised FSAR Table 15.6.3-1 Will Be Included in Future FSAR Update | |
ML19326D703 | 1 July 1980 | Forwards Application for Amend to CPPR-116 Consisting of Addition of co-owners & co-applicants | |
ML19326E258 | 17 July 1980 | Ack Receipt of IE Insp Repts 50-413/80-08 & 50-414/80-08 on 800512-16.No Proprietary Info | |
ML19327A551 | 28 July 1980 | Submits Info Re Target Dates for Fuel Loading in Response to 800711 Ltr.Mcguire 2 Scheduled for Jun 1982,Catawba 1 Scheduled for Aug 1983 & Catawba 2 Scheduled for Feb 1985 | |
ML19330B440 | 16 July 1980 | Responds to NRC 800702 Ltr & Forwards Evacuation Time Estimates for Evacuation of Areas Around Units 1 & 2. Oversize Map Forwarded to a Schwencer | Siren |
ML19330B629 | 29 July 1980 | Forwards Compilation of Projected Loads,Capacities & Reserves,Reflecting long-term Forecast for 1983-1991.Results Indicate Reserve Levels in 17-25% Range | |
ML19331C375 | 5 August 1980 | Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Fusion Welded Pipe Not Used in safety-related Sys | |
ML19332A298 | 13 August 1980 | Ack Receipt of IE Insp Repts 50-413/80-13 & 50-414/80-13 on 800618-20.No Proprietary Info | |
ML19332A667 | 20 August 1980 | Responds to IE Bulletin 80-20 Re Failures of Westinghouse W-2 Spring Return to Neutral Control Switches.Identified Switches Are Not Used or Planned for Use in safety-related Areas.Thirteen Manhours Expended for Review | |
ML19332B924 | 15 November 1989 | Forwards 12th Quarterly Update to Unit Startup Rept for Cycle 1,per Tech Spec 6.9.1.3.Addl Quarterly Updates to Startup Rept Will Be Submitted | |
ML19332C463 | 15 November 1989 | Forwards Monthly Operating Repts for Oct 1989 & Monthly Operating Status Rept for Sept 1989 for Catawba Nuclear Station,Units 1 & 2 | |
ML19332C929 | 9 November 1989 | Forwards Public Version of Revised Epips,Including RP/0/A/5000/02, Notification of Unusual Event, RP/0/A/5000/03, Alert, RP/0/A/5000/04, Site Area... & RP/0/A/500/05, General.... W/891120 Release Memo | Earthquake |
ML19332E746 | 30 November 1989 | Responds to NRC 891103 Ltr Re Violations Noted in Insp Repts 50-413/89-29 & 50-414/89-29.Corrective Actions:Control Room Penetrations Inspected & Changes Will Be Made to Performance Surveillance Test Procedure | Fire Watch |
ML19332E771 | 30 November 1989 | Withdraws 880701 Proposed Amend to Licenses NPF-35 & NPF-52 | |
ML19332F359 | 7 December 1989 | Forwards Supplemental Response to Insp Repts 50-413/89-33 & 50-414/89-33 Re Type C Valves,Per H Whitener Request | |
ML19332F372 | 8 December 1989 | Forwards Updated 890331 Prioritized Listing of OL Amends & Tech Spec Amends.Listing Intended as Guidance to Be Used in Allocating Resources for Review & Issuance of Proposed Amends | Boric Acid |
ML19332F589 | 8 December 1989 | Forwards Suppl Info Re Basis of Composite Spectra Shown in Figure 2 of 891017 Submittal | Earthquake |
ML19332F779 | 13 December 1989 | Forwards Rev 25 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML19336A642 | 15 August 1980 | Responds to NRC 800718 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05,50-413/80-09,50-414/80-09, 50-491/80-07,50-492/80-06 & 50-493/80-06.Corrective Actions: Records Storage Facility Constructed | |
ML19337B011 | 29 August 1980 | Forwards Supplemental Response to NRC 800715 Ltr Re Violations Noted in IE Insp Repts 50-413/80-11 & 50-414/80-11.Corrective Actions:Insp Program for Electrical Cables Revised | |
ML19337B017 | 5 August 1980 | Responds to NRC 800715 Ltr Re Violations Noted in IE Insp Repts 50-413/80-11 & 50-414/80-11.Corrective Actions:Insp Instructions Revised to Reflect Insp of All Interconnecting Wiring & Cabling & Const Procedure Implemented | |
ML19338C583 | 6 August 1980 | Responds to IE Bulletin 80-16, Potential Misapplication of Rosemount,Inc Model 1151 & 1152 Pressure Transmitters W/ Either a or D Output Codes. Review of Pressure Transmitters Conducted | |
ML19338D091 | 16 September 1980 | Responds to NRC 800520 Ltr Re NUREG-0577, Potential for Low Fracture Toughness & Lamellar Tearing on PWR Steam Generator & Reactor Coolant Pump Supports. No Response Needed,Pending Addl NRC Guidance | |
ML19338D981 | 19 August 1980 | Responds to NRC 800623 Ltr Re Violations Noted in IE Insp Repts 50-413/80-10 & 50-414/80-10.Corrective Actions:Util Will Insp Addl Component Support Welds | |
ML19338D988 | 19 August 1980 | Responds to NRC 800725 Ltr Re Violations Noted in IE Insp Repts 50-413/80-15 & 50-414/80-15.Corrective Actions:Qc Welding Inspectors Restrained in Requirements of QA Procedures M-19 & M-4.Emphasis Placed on Documentation | |
ML19338D989 | 15 July 1980 | Responds to NRC 800623 Ltr Re Violations Noted in IE Insp Repts 50-413/80-10 & 50-414/80-10.Corrective Actions:Insp of Component Support Welds Initiated | |
ML19338E265 | 9 September 1980 | Ack Receipt of IE Insp Repts 50-413/80-20 & 50-414/80-20 on 800804-08.No Proprietary Info | |
ML19338G521 | 25 August 1980 | Forwards Response to NRC 800801 Ltr Re Violations Noted in IE Insp Repts 50-413/80-14 & 50-414/80-14.Corrective Actions:Supplemental Insp Instructions Issued to Include Checks for Freedom of Movement on Applicable Supports | |
ML19338G527 | 9 September 1980 | Forwards Response to NRC 800815 Ltr Re Violations Noted in IE Insp Repts 50-413/80-16 & 50-414/80-16.Corrective Actions:Ltr Explaining Abbreviation & Defining All Ref Documents Will Be Sent to Design Engineering & Const Depts | |
ML19339A469 | 20 October 1980 | Ack Receipt of IE Insp Repts 50-413/80-25 & 50-414/80-25,on 800908-12.No Proprietary Info | |
ML19339A569 | 26 September 1980 | Responds to NRC 800829 Ltr Re Violations Noted in IE Insp Repts 50-413/80-17 & 50-414/80-17.Corrective Actions: Procedure 427 Issued Re Process Control Requirements for ASME Class A,B & C Welds | |
ML19339C090 | 29 October 1980 | Ack Receipt of IE Insp Repts 50-413/80-26 & 50-414/80-26. No Proprietary Info | |
ML19340B164 | 15 October 1980 | Forwards Results of Jul 1979-June 1980 Interim Nonradiological Monitoring.No Mods to Study Sampling or Analytical Techniques Implemented from Studies Previously Submitted.No Distinct Changes in Lake Wylie Water Quality | |
ML19340C650 | 21 November 1980 | Responds to NRC 801028 Ltr Re Violations Noted in IE Insp Repts 50-413/80-28 & 50-414/80-28.Corrective Actions: Supports Removed & Tray Mounted Correctly.Craftsmen Trained to Mount Supports Correctly | |
ML19340F077 | 18 December 1980 | Responds to NRC 801210 Ltr Re Violations Noted in IE Insp Repts 50-413/80-33 & 50-414/80-33.Corrective Actions: Engineers Involved Will Be Retrained in Requirements of Procedure | |
ML19341C351 | 12 February 1981 | Forwards Response to IE Bulletin 80-23.Coils of All Valcor Solenoid Valves W/Part Numbers V70900-21-1 or V70900-21-3 Will Be Replaced W/Coils of Improved Const by 810213.Valcor Is Submitting Proposed Testing Program | |
ML19341C735 | 9 February 1981 | Ack Receipt of IE Insp Repts 50-413/80-36 & 50-414/80-36 on 801202-05.No Proprietary Info | |
ML19341C741 | 31 December 1980 | Supplemental Response to NRC 801026 Ltr Re Violations Noted in IE Insp Repts 50-413/80-23 & 50-414/80-23.Corrective Actions:Battery Racks 1DGBA-B & 2DGBA-B Redesigned & Seismically Tested.Results Satisfactory | |
ML19341C743 | 26 November 1980 | Responds to NRC 801026 Ltr Re Violations Noted in IE Insp Repts 50-413/80-23 & 50-414/80-23.Corrective Actions: Verification of Seismic Design Expected from Vendor by 801215.Util Will Submit Final Response After Review | |
ML19341C744 | 10 November 1980 | Informs That CE Murphy 800926 Letter Forwarding IE Insp Repts 50-413/80-23 & 50-414/80-23 Not Received Until 801106.Response Will Be Provided by 801126 | |
ML19343A413 | 15 August 1980 | Advises That Final Response to IE Bulletin 80-09 Not Submitted Due to Necessary Info Not Available from Vendors. Final Rept Expected by 801201 | |
ML19344A508 | 17 July 1980 | Responds to NRC 800625 Ltr Re Violations Noted in IE Insp Rept 50-413/80-12 & 50-414/80-12.Corrective Actions:Qa Procedure 0-1 Revised to Include Insulation Testing Equipment | |
ML19344A629 | 18 August 1980 | Forwards $4,000 Check for CP Amend Per NRC 800805 Ltr.W/O Encl | |
ML19344D223 | 29 February 1980 | Forwards Interim Deficiency Rept Re Solid State Protective Relays & Trip Devices Not Meeting Characteristic Specs | |
ML19344F195 | 28 August 1980 | Responds to IE Bulletin 80-19.Mercury-wetted Matrix Relays Are Not Used or Planned for Use in Reactor Protection Sys | |
ML19347C595 | 18 December 1980 | Ack Receipt of IE Insp Repts 50-413/80-34 & 50-414/80-34 on 801105-07.No Proprietary Info | |
ML19347D809 | 8 April 1981 | Forwards Application for Amend to CPPR-117,adding Piedmont Municipal Power Agency as co-owner & co-applicant of Facility.Encl Agreements & Audited Financial Statements Available in Central Files Only | |
ML19347F264 | 13 May 1981 | Forwards Facility Project Power Sales Agreement Form for Inclusion in 810408 Application for Amend of CPPR-117 to Include Piedmont Municipal Power Agency as co-owner/ Applicant for Unit 2 |