Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Fusion Welded Pipe Not Used in safety-related Sys
ML19331C375
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/05/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-03A, IEB-79-3A, NUDOCS 8008180176
Download: ML19331C375 (1)


Text

r-

,, f /G DuxE POWER COMI%NY

rlR G R E Powen lienum<g ,.{A ':-

422 Sourn Cn uncu STnceT. C'uAutoTTE, N. C. usa 42 w Luau o. PAnaca,an. . 0 /' ' .' 8 0 b .* 4 2 vict Passiotut Ta t t emose r:Anta 704 Stram Pooovevio.e- 373-40s3 August 5, 1980 -

Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 slanta, Georgia 30303 Re: RII:JPO Catawba Nucl tation Docket Nog. 50-413 and 50-414

Dear Mr. O'Reilly:

In response to your letter of April 4, 1980 which transmitted IE Bulletin 79-03A, we wish to advise that a review of Catawba Nuclear Station's piping specifications has beca conducted. Duke Power Company has not used SA-312, A-312, Type 300 Series fusion welded pipe in safety-related systems at greater than 85 percent of Code allowabic pressure stresses. No future use above this limit is planned.

Ve y truly yours, g '

\ .

William O. Parker, Jr.

RWO:vr cc: NRC/0IE I4 vision of Reactor Construction Inspection

? 1 - Catawba Resident Inspector OFFICIAL COPY 8008180 I 7 6

- -