Responds to NRC 800625 Ltr Re Violations Noted in IE Insp Rept 50-413/80-12 & 50-414/80-12.Corrective Actions:Qa Procedure 0-1 Revised to Include Insulation Testing Equipment
ML19344A508
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/17/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19344A492 List:
References
NUDOCS 8008200526
Download: ML19344A508 (2)


Text

,

I DUKE Pow,,fw .i, E03fPANY Ox POWER Ubk.DUtu 422 Sot:rn Cut:acu StazEr, CnAHLOTTE, N. C. 2824a SLU ' 22 Al[] ,= 4 g wnuam o emanca.sa. July 17, 1980 VtCr Parsectat it6tnao=t. Anta 704 Seta= Paeovetion 373-4083 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:GFM 50-413/80-12 50-414/80-12

Dear Mr. O'Reilly:

Please find attached a response to Deficiency 413/414/80-12-02 which was identified in the above referenced inspection report. Duke Power Company does not consider any information contained in the subject IE Inspection Report to be proprietary.

' ry truly yours,

/

~~ u. u William O. Parker, Jr.

R0W:ses Attachmetit cc: G. F. Maxwell NRC - Catawba Nuclear Station l 1

'8008200 M$

DUKE POWER COMPANY CATAWBA NUCLEAR STATION Response to Deficiency 413/414/80-12-02

" Failure to include all of the electrical mecsuring and test equipment in the applicable Duke Power Company procedure."

Deficiency As required by Criterion XII of Appendix B to 10CFR 50, as implemented by Duke's Topical Report, Paragraph 17.1.12.2, written procedures are to require that measuring and testing equipment be calibrated for accuracy.

Contrary to the above, Duke Power Company QA Procedure 0-1 does not require that all electrical measuring and testing equipment be calibrated for accuracy.

Response

Duke Power Company Quality Assurance Procedure 0-1 has been revised to include insulation testing equipment. Procedure 0-1 will be fully implemented in the field by August 1: 1980.