ML19332C929
| ML19332C929 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/09/1989 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19332C930 | List: |
| References | |
| NUDOCS 8911290188 | |
| Download: ML19332C929 (4) | |
Text
.-O---
.!E q py g
9.
+
D' hM3 Duxe POWEn GOMPANY q:
P.O. box 33180 -
CHARLOTTE, N.C. 98049
'HALB. TUCKER' ret.renowe vice emmeneent (704) 373 4lb31 s wretaan enunt.ction
'){
November 9',- 1989 Document Control Desk g.
-U.iS. Nuclear = Regulatory Commission
' Wa shington',. D.. C..-
- 20555
+'
Re:
Catawba Nuclear Station-Docket Nos. 50-413 and.50-414 Emergency' Plan Implementing Procedures g
Dear. Sir:
. Enclosed'forLNRC Staff use and review is revisions to the following-Emergency Plan Implementing Procedures g
RP/0/A/5000/02 dated 11/2/89 - Notification of Unusual Event RP20/A/500d/03. dated 11/2/89 - Alert RP/0/A/5000/04 dated 11/2/89 - Site Area Emergency g
RP/0/A/5000/05-dated 111/2/89 - General' Emergency Please'deletet privacy. material.in the form of personal-telephone numbers prior to placing.in the. public document room, specifically:
~
Enclosure'4.1'of each of these; procedures.
'By copy-of this~1etter, two copies are being provided to NRC Region II, Atlanta, Georgia.
Very truly yours,
- n. -
m 44 Hal--B.. Tucker R
KLC:kic-1
- Enclosures l
h i
8911290188 891109
' PDR 'ADOCK'05000413
- c..
- F PNU 1
y p'
o N.
i LI i
'Jo Wth Page 1 of 2
{
' DUKE POWER COMPANY l
~
CATAWEA NUCLEAR STATION
- EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX 1
N PROCEDURE #
TITLE RP/0/A/5000/01 Classification'of Emergency (09/14/88)-
RP/0/A/5000/02.
Notification of Unusual Event (11/02/89)
~
RP/0/A/5000/03' Alert (11/02/89) i RP/0/A/5000/04
- Site Area Emergency (11/02/89) a RP/0/A/5000/05 General Emergency (11/02/89) i RP/0/A/5000/06 Follow-up Notification (09/01/89)
RP/0/A/5000/07' Natural Disaster and Earthquake (09/13/89)
RP/0/A/5000/08 Release of A Hazardous Substance (03/3/89)
. RP/0/A/5000/09 Collision / Explosion (07/30/87)
.RP/0/A/5000/10 ~
. Conducting A Site Assembly or Evacuation (07/15/88) y RP/0/A/5000/11-Protective Action Recommendations-Without-The OAC (10/19/88) 3
- RP/0/B/5000/12 Control of Assessment and Repair Teams (01/6/88)
RP/0/B/5000/13 NRC Notification, Requirements (05/19/89)
RP/0/B/5000/14 Follow-up Notifications From TSC (09/01/89)
HP/0/B/1000/06 Emergency Equipment Functional Check and Inventory (06/22/89)
)
E HP/0/B/1009/01 Health Physics Recovery Plan (08/18/87) l HP/0/B/1009/03-Health Physics Response Following a Primary to Secondary Leak (05/11/89)
HP/0/B/1009/04 Environmental Monitoring for Emergency Conditions Within the Ten-Mile Radius of Catawba Nuclear Station (06/13/89)
HP/0/B/1009/05 Personnel / Vehicle Monitoring for Emergency Conditions (01/12/87)
November 2, 1989
~
4 g
- N UNITED STATES bg
[
J NUCLEAR REGULATORY COMMISSION n
Nag
[ '
WASHINGTON, D. C. 20SS6
. November 20, 1989 h
k,.....
l.4 i
,i:
t i
(
50-413/414-Catawba i
o.
MEMORANDUM FOR:
Chief,. Document Management Branch. TIDC.
.FROM:
. Director, Division of Rules and Records, ADM
,j
. SUB' JECT:-
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION
.The Division of Rules and Records has reviewed the attached-document and has determined that it may now be made publicly available, l-hhpWk "l)
Donnie H. Grimsley Director Division of Bules and Rec rds Office of Administration
Attachment:
As stated o
'\\
?
k
?
L 1
l~
l l
.