Dune POWER COMPM Powra Utzwmo 422 Socin Cuencu Srnrrr. Cn.ARWTTN, N.C.bo532UC,','J;O[
r-p -
, I. l WILLIAM O. PA R M E R, J R.
i,cr Patsiot,
August 23, 198Q
},0 (
$sta= PmODuC?iose
,J 6 {b 2 A.fl,, }$c.-o~t: Aata 7o.
3D'*003 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:GFM 50-413/80-14 50-414/80-14
Dear Mr. O'Reilly:
Please find attached a response to Infraction No.
identified in the above referenced Inspectica Report.413/80-14-01 whi h c was be proprietary.does not consider any information contained in this inspection re ort to t
V ry truly yours, s
(.Q. cLx ses - -
William O. Parker, Jr.
RWO:ses NRC Resident Inspector cc:
Catawba Nuclear Station eo10310 g j y *g I [' $ h h 8ND
7 g
DUKE POWER COMPANY CATAWBA NUCLEAR STATION Response to Infraction 413/80-14-01 Infraction:
As required by Criterion V of Appendix B to 10CFR 50, as imple=ented by Duke's Topical Report, paragtaph 17.1.5.2, work is to be performed in accordance with drawings and procedures.
Contrary to the above, a unit 1 pipe strut was found to have its ball bushing wedged with a piece of metal; restricting movement of the strut bar.
Placement of this wedge in the bushing was not according to procedure.
Response
The supplemental inspection instructions to be issued for the final walk-down inspectica described in QA Procedure M-15 will include a check for freedom of movement on applicable supports. This action will be complete by October 1, 1980.