Responds to NRC 800702 Ltr & Forwards Evacuation Time Estimates for Evacuation of Areas Around Units 1 & 2. Oversize Map Forwarded to a Schwencer
ML19330B440
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/16/1980
From: Parker W
DUKE POWER CO.
To: Harold Denton, Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8008040025
Download: ML19330B440 (8)


Text

e ,

DUKE POWER COMPANY Powra Betwswo 402 Socra Cacaca Srazzi, CnAnt ortz, N. C. 2e242 wiwu o. panaca,sm.

Scr Petssotut TEL g n= c q g:Aags 704 Stra= *acoverio= 373-4c s 3 July 16, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. A. Schwencer, Acting Chief Licensing Branch No. 3 Re: Catawba Nuclear Station Docket Nos.: 50-413 and -414

Dear Mr. Denton:

As requested by Mr. Darrell G. Eisenhut's letter of July 2, 1980, evacuation time estimates for evacuation of various areas around the Catawba Nuclear Station are provided in Attachment 1.

A color overlay map of the site is provided as Attachment 2.

A V y truly yours,

{ s Q-~' '__ lh . )% 0 -

William O. Parker, Jr.

ROS:vr Attachments cc: County Civil Preparedness Agency (Mecklenburg, Gaston, Lancaster, York)

G. F. Maxwell, NRC/ Catawba Construction

\

pf/

800804'OO 2 5 b M /

<b s DUKE POWER COMPANY CATAWBA NUCLEAR STATION Attachment 1 EVACUATION TIME ESTDfATES l

1 1

l

4_' .;

EVACUATION TIME ESTIMATES (Including Notification) For Areas Near Catawba Nuclear Station Clover, South Carolina

'1. Area 1 consists of the NW, NNW, N, NNE, NE, ENE, E and ESE sectors at 0 to 2 miles from the Station. Population total is 785 of which 301 are average-daily attendance at recreational areas on Lake Wylie.

Schools: None Special Facilities: None Population Concentrations: None Notification Time: 70 minutes Best Estimate Evaluation Time: 90 minutes Adverse Weather Evacuation Time: 105 minutes Evacuation Confirmation Time: 55 minutes

2. Area 2 consists of the SE, SSE, S, SSW, SW, WSW, W and WNW sectors at 0 to 2 miles from the Station. Population total is 911 of which 591 are average daily attendance at recreational areas on Lake Wylie.

Schools: None Special Facilities: None Population Concentrations: None Notification Time: 60 minutes Best Estimate Evacuation Time 90 minutes Adverse Weather Evacuation Time: 105 minutes Evacuation Confirmation Time: 45 minutes

. 3. Area 3 consists of the NW, NNW, N and NNE sectors at 2 to 5 miles from the Station. Population is 5,616 of.which 2,940 are average daily attendance at recreational areas on Lake Wylie.

Schools: 1 Special Facilities: None Population Concentrations: None Notification Time: 75 minutes Best Estimate Evccuatica Time 110 minutes

! Adverse Weather Evacuation Time 125 minutes Evacuation Confirmation Time: 70 minutes

4 ,

4. Area 4 consists of the NE, ENE, E and ESE sectors at 2 to 5 miles from the Station. Population total is 3,479 of which 727 are average daily attendance at recreational areas on Lake Wylie.

Schools: None Special Facilities: None Population Concentrations: None Notification Time: 75 minutes Best Estimate Evaluation Time 100 minutes Adverse Weather Evacuation Time: 115 minutes Evacuation Confirmation Time: 75 minutes

5. Area 5 consists of the SW, WSW, W and WNW sectors at 2 to 5 miles from the Station. Population total is 726 of which 3 are average daily attendance at recreational areas on Lake Wylie and 43 are industrial transients.

Schools: None Special Facilities: None Population Concentrations: None Notification Time: 70 minutes Best Estimate Evacuation Time: 95 minutes Adverse Weather Evacuation Time: 110 minutes Evacuation Confirmation Time 70 minutes

6. Area 6 consists of the SE, SSE, S and SSW sectors at 2 to 5 miles from the Station. Population total is 6,028 of which 1,658 are average daily attendance at recreational areas on Lake Wylie.

Schools: 1 Special Facilities: None Population Concentrations: None Notification Time: 65 minutes Best Estimate Evacuation Time: 110 minutes Adverse Weather Evacuation Time: 125 minutes Evacuation Confirmation Time: 60 minutes

7. Area 7 consiste of the NW, NNW, N and'NNE sectors at 5 to 10 miles from the Station. Population total 3,141 of which 939 are average daily attendance at recreational areas on Lake Wylie and 560 are industrial ,

l transients.

l Schools: None Special Facilities: None Population Concentrations: None Notification Time: 115 minutes I Best Estimate Evacuation Time: 185 minutes Adverse Weather Evacuation Time: 200 minutes Evacuation Confirmation Time: 160 minutes

L .

8. Area 8 consists of the NE, ENE, E and ESE sectors at 5 to 10 miles from the Station. Population is 22,842 of which 11,148 are average daily attendance at recreational areas on Lake Wylie and 8,434 are industrial transients.

Schools: 7 Special Facilities: None Population Concantrations: 2 Notification Time: 150 minutes Best Estimate Evacuaci.n Time: 205 minutes Adverse Weathter Evacuat.sn Time: 220 minutes Evacuation Confirmation Time: 165 minutes

9. Area 9 consists of the SW, WSW, W and WNW sectors at 5 to 10 miles from the Station. Population.cotal is 5,931 with no average daily attendance at recreational areas and 1,345 industrial transients.

Schools: 2 Special Facilities: (Combined peak patient load is 99 with 34 requiring ambulance service)

Population Concentrations: 2 Notification Time: 150 minutes Best Estimate Evacuation Time: 180 minutes Adverse Weather Evacuation Time: 195 minutes Evacuation Confirmation Time: 165 minutes Special Facilities, Best Estimate Ev cuation Time: 390 minutes SpecLal Facilities, Adverse Weather Evacuation Time: 450 minutes

10. Area 10 consists of the SE, SSE, S and SSW sectors at 5 to 10 miles from the Station. Population is 41,576 with no average daily attendance at recreational areas and 8,632 industrial transients.

Schools: 18 Technical Institutes:

Colleges: 3 Special Facilities: 5 (Combined peak patient load is 554 with 138 requiring amtulance service)

Population Concentrations: 1 Notification Time: 150 minutes Best Estimate Evacuation Time: 180 minutes Adverse Weather Evacuation Time: 195 minutes Evacuation Confirmation Time 165 minutes

-Special Facilities, Best Estimate Evacuation Time: 1935 minutes Special Facilities, Adverse Weather Evacuation Time: 2445 minutes l

r c

4 .

NOTES

1. Population and population distribution are based on the 1970 census.

Population distributions for the year 1980 are based on projections made by the United States Department of Commerce, Bureau of Economic Analysis (Series E Projections) .

2. Average daily attendance at recreational areas and daily industrial transient population is 1977 actual information obtained by contact with individual facilities.
3. Special facility patient load estimates represent current date (March, 1980).
4. Special facility evacuation times are reported for the combined patient load of all special facilities in an area rather than for each separate special facility. Patient loads were combined because of the trans-portation restrictions encountered when dealing with that percentage of patients which could not be evacuated by any means other than an ambulance. By evacuating that percentage of patients requiring ambulance service to shelters within the vicinity of Catawba Nuclear Station, rather than evacuating them to other hospitals or nursing homes, special facility evacuation times could be considered reduced, and in addition, spedial facility evacuation times greater than 240 minutes may be reduced by the utilization of ambulance service capability outside the counties included in the plume exposure pathway emergency planning zone. At this time specific agreements for this additional cervice have not been made.
5. Evacuation of any area would proceed to predesignated evacuation centers located outside the 10 mile Emergency Planning Zone. Evacuation times are calculated to evacuate only the required area (0-2 miles, 2-5 miles, or 5-10 miles for the respective 180 or 90 degree sector) and not for evacuees to physically reach a predesignated evacuation site.
6. Evacuation times are based on studies of population density, road capacity for evacuation of the designated area (i.e. , 1, 2, 3, 4, 5, 6, 7, 8, 9 or 10), nearness of volunteer and municipal agencies responsible for the actual evacuation planning plus experience and comments of the Area E, Emergency Management Coordinator, N. C. Department of Crime Control and Public Safety, and the County Manager of York County, S. C. Evacuation times for areas ou: side the 2 mile zone incorporate transit time for personnel passing through to reach their predesignated evacuation site, thereby increasing traffic on evacuation routes. The primary mode of transportation within Catawba's 10 mile radius is via private automobile.
7. Evacuation of educational facilities is not included in Special Facility tines. Bus and private auto transportation out of an evacuation zone from the facility in session or during special activities are provided and are close at hand.

o .

8. Notification times are included for each designated area. Present means of notification is via sirens, bullhorns and house-to-house warnings.

Notification times for fishing and recreational boating on Lake Wylie and Catawba River assume that a direct contact search will be made utilizing police and coast guard auxiliary capabilities.

9. Local civil defense agencies were consulted in preparing the above evacuation time estimates. There were no areas of disagreement.

l

-- -- - --,-_____,__y

9

. c

  • DUKE POWER COMPANY CATAWBA NUCLEAR STATION Attachment 2 SITE MAP l-