ML19341C743
| ML19341C743 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/26/1980 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19341C738 | List: |
| References | |
| NUDOCS 8103040078 | |
| Download: ML19341C743 (2) | |
Text
_
DUKE POWER COMPANY Powsm Duitmixo 422 Socin Cuuncu Srazzi, Cruntorrs. N. C. asam 9
W 8 L LI AM O, PAR M ER J R, i
TtitemoN E:Asta 704 VeCf Pettietset Strane Paoowctiose 373 40e3 il November 26, 1980 2
Mr. James P. O'Reilly, Director l
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:DKW 50-413/80-23 50-414/80-23 1
Dear Mr. O'Reilly:
}
Please find attached a response to Infraction No. 413-414/80 23-01 which was identified in the above referenced Inspection Report.
Duke Power Company does not consider any information contained in this inspection report to be proprietary.
V y truly yours, 7
d.
i William O. Parker, Jr.
RWO:vr Attachment ec: NRC - Catawba Resident Inspector i
I
(
l l
181030 4 00'E
~
e 1,
DUKE POWER COMPANY i
CATAWBA NUCLEAR STATION Response to Infraction 50-413-414/80-23-01 Infraction As required by 10CFR50, Appendix B, Criterion VII, and as implemented by
+
Duke Power Company Topical Report Section 17.1.7 which states: Duke's quality assurance program requires the control of safety-related items or services purchased from a vendor, subvendor or consultant. Table 17.0-1 of Duke Power Company Topical Report commits to the requirements of Regulatory Guide 1.123, Revision 1, which endorses ANSI N45.2.13-1976.
Paragraph 10.1 of ANSI N45.2.13 requires that the supplier verify that j
the item or service being furnished complies with the procurement require-i ments, prior to offering the item or service for acceptance.
Contrary to the above, diesel generator battery racks 1DGBA, 1DGBB, 2DGBA and 2DGBB did not meet the seismic requirements of the procurement documents.
The battery racks had been receipt inspected, accepted and installed by the licensee.
1
Response
' Verification of the seismic design is expected from the vendor by 12/15/80.
Duke will submit a final response to the NRC by 12/31/80 after a review of 1
the vendor's records.
i i
i i
c--...,
__