Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
NLS2003098, Technical Specification Bases Changes5 September 2003Technical Specification Bases ChangesHalf scram
Missed surveillance
Scram Discharge Volume
Feedwater Controller Failure
Offsite Circuit
Power change
NLS2003099, August 2003 Monthly Operating Report for Cooper Nuclear Station11 September 2003August 2003 Monthly Operating Report for Cooper Nuclear Station
NLS2003100, Quality Assurance Program Changes29 September 2003Quality Assurance Program ChangesProcess Control Program
Fire Protection Program
Affidavit
NLS2003101, Safeguards Plan, Revision 4517 September 2003Safeguards Plan, Revision 45
NLS2003103, Meeting - Licensee Presentation22 September 2003Meeting - Licensee Presentation
NLS2003105, License Amendment Request for LOCA Dose Calculation Methodology and Resolution of Remaining License Condition 2.C.(6) Issues9 December 2003License Amendment Request for LOCA Dose Calculation Methodology and Resolution of Remaining License Condition 2.C.(6) IssuesSafe Shutdown
Safe Shutdown Earthquake
Emergency Lighting
Seismically rugged
Earthquake
Fire Protection Program
NLS2003106, Response to Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations9 October 2003Response to Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
NLS2003107, Management Change26 November 2003Management Change
NLS2003108, September 2003 Monthly Operating Report for Cooper Nuclear Station13 October 2003September 2003 Monthly Operating Report for Cooper Nuclear Station
NLS2003113, Compliance with Compensatory Measures Related to Security Force Training and Fitness-for-Duty (EA-03-0038)22 October 2003Compliance with Compensatory Measures Related to Security Force Training and Fitness-for-Duty (EA-03-0038)
NLS2003116, Emergency Plan Implementing Procedures for Cooper Nuclear Station13 November 2003Emergency Plan Implementing Procedures for Cooper Nuclear StationHealth Physics Network
Met Tower
NLS2003117, Initial Response to NRC Generic Letter 2003-0110 November 2003Initial Response to NRC Generic Letter 2003-01Fire Protection Program
NLS2003119, October 2003 Monthly Operating Report for Cooper Nuclear Station13 November 2003October 2003 Monthly Operating Report for Cooper Nuclear Station
NLS2003120, Inservice Testing Program Relief Request RP-06, Revision 225 November 2003Inservice Testing Program Relief Request RP-06, Revision 2
NLS2003121, Reporting of Changes and Errors in ECCS Evaluation Models16 December 2003Reporting of Changes and Errors in ECCS Evaluation ModelsHydrostatic
NLS2003122, Confirmation of Commitments, Per 11/13/03 Telephone Conference Regarding Diesel Generator Fuel Oil Strainer Fouling4 December 2003Confirmation of Commitments, Per 11/13/03 Telephone Conference Regarding Diesel Generator Fuel Oil Strainer Fouling
NLS2003123, November 2003 Monthly Operating Report for Cooper Nuclear Station12 December 2003November 2003 Monthly Operating Report for Cooper Nuclear Station
NLS2003124, Revision 31 to EPIP 5.7.1, Emergency Classification.11 December 2003Revision 31 to EPIP 5.7.1, Emergency Classification.Safe Shutdown
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Abnormal operational transient
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
NLS2003128, Revisions to the Strategic Improvement Plan23 December 2003Revisions to the Strategic Improvement Plan
NLS2003132, Revision 2 to EPIP 5.7ENS, ENS Communicator.29 December 2003Revision 2 to EPIP 5.7ENS, ENS Communicator.
NLS2004001, Compliance with Compensatory Measures Related to Access Authorization7 January 2004Compliance with Compensatory Measures Related to Access Authorization
NLS2004002, December 2003 Monthly Operating Report for Cooper Nuclear Station13 January 2004December 2003 Monthly Operating Report for Cooper Nuclear Station
NLS2004004, Revision to Commitment Referenced to Amendment 201 Safety Evaluation30 January 2004Revision to Commitment Referenced to Amendment 201 Safety Evaluation
NLS2004005, License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-329 January 2004License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3Unanalyzed Condition
Hydrostatic
Finite Element Analysis
Abnormal operational transient
NLS2004006, Response to RAI Regarding License Amendment Request to Revise Technical Specifications (TS) Surveillance Requirements and TS Table for Mathematical Symbols and Use of Allowable Values in the Place of Analytical Limits9 March 2004Response to RAI Regarding License Amendment Request to Revise Technical Specifications (TS) Surveillance Requirements and TS Table for Mathematical Symbols and Use of Allowable Values in the Place of Analytical Limits
NLS2004007, License Amendment Request - One-Time Extension of Surveillance Requirements30 January 2004License Amendment Request - One-Time Extension of Surveillance RequirementsReactor Vessel Water Level
Large early release frequency
Battery sizing
Fuel cladding
NLS2004009, Inservice Inspection Relief Requests PR-03, RC-06, RC-07, R1-17, R1-31, R1-32, and R1-3312 February 2004Inservice Inspection Relief Requests PR-03, RC-06, RC-07, R1-17, R1-31, R1-32, and R1-33Packing leak
Coatings
Nondestructive Examination
VT-2
NLS2004011, Clarification of Generic Letter 96-06 Safety Evaluation16 February 2004Clarification of Generic Letter 96-06 Safety EvaluationStroke time
NLS2004013, Revision 19 to EPIP 5.7.2, Shift Supervisor Epip.13 February 2004Revision 19 to EPIP 5.7.2, Shift Supervisor Epip.Fuel cladding
NLS2004015, Semi-Annual Fitness-for-Duty Program Performance Report4 February 2004Semi-Annual Fitness-for-Duty Program Performance ReportFitness for Duty
NLS2004016, Revision 25 to EPIP 5.7.9, Activation of Eof.18 February 2004Revision 25 to EPIP 5.7.9, Activation of Eof.Minimum staff
NLS2004017, January 2004 Monthly Operating Report for Cooper Nuclear Station13 February 2004January 2004 Monthly Operating Report for Cooper Nuclear Station
NLS2004018, Revision 2 to EPIP 5.7COMMUN, Communications19 February 2004Revision 2 to EPIP 5.7COMMUN, CommunicationsHealth Physics Network
Met Tower
NLS2004019, Response to RAI Regarding Proposed License Amendment Request for Loss-of-Coolant Accident (LOCA) Dose Calculation Methodology and Resolution of Remaining License Condition 2.C0(6) Issues8 March 2004Response to RAI Regarding Proposed License Amendment Request for Loss-of-Coolant Accident (LOCA) Dose Calculation Methodology and Resolution of Remaining License Condition 2.C0(6) IssuesPower-Operated Valves
NLS2004021, Contesting of Finding in Inspection Report 05000298/2003-00726 February 2004Contesting of Finding in Inspection Report 05000298/2003-007
NLS2004022, Reply to Preliminary White Finding Regarding NRC Inspection Report 05000298/2004-00912 March 2004Reply to Preliminary White Finding Regarding NRC Inspection Report 05000298/2004-009Significance Determination Process
Preliminary White Finding
NLS2004023, Risk-Informed Inservice Inspection Program (Relief Request RI-34)11 March 2004Risk-Informed Inservice Inspection Program (Relief Request RI-34)Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Scram Discharge Volume
Large early release frequency
NLS2004034, Compliance with NRC Rule Property Insurance, Per 10 CFR 50.54(w)(3)2 March 2004Compliance with NRC Rule Property Insurance, Per 10 CFR 50.54(w)(3)
NLS2004035, February 2004 Monthly Operating Report for Cooper Nuclear Station15 March 2004February 2004 Monthly Operating Report for Cooper Nuclear Station
NLS2004038, Nebraska Public Power District - Letter - Revisions to the Strategic Improvement Plan Cooper Nuclear Station Docket 50-298, DPR-46 Dated March 30, 200430 March 2004Nebraska Public Power District - Letter - Revisions to the Strategic Improvement Plan Cooper Nuclear Station Docket 50-298, DPR-46 Dated March 30, 2004
NLS2004040, Revision 5 to EPIP 5.7.8.1, Activation of Alternate OSC and Revision 3 to EPIP 5.7COMMUN, Communications.17 March 2004Revision 5 to EPIP 5.7.8.1, Activation of Alternate OSC and Revision 3 to EPIP 5.7COMMUN, Communications.Health Physics Network
Met Tower
NLS2004042, Confirmation of Commitments Discussed in 03/05/04 Teleconference25 March 2004Confirmation of Commitments Discussed in 03/05/04 Teleconference
NLS2004043, Supplement to License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves, Figures 3.4.9-1, 3.4.9-2, & 3.4.9-38 April 2004Supplement to License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves, Figures 3.4.9-1, 3.4.9-2, & 3.4.9-3Hydrostatic
NLS2004047, 2003 Annual Radioactive Effluent Release Report23 April 20042003 Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
NLS2004048, 2003 Annual Radiological Environmental Operating Report5 May 20042003 Annual Radiological Environmental Operating ReportAnnual Radiological Environmental Operating Report
Chernobyl
NLS2004051, License Amendment Request, Revised Logic for Reactor Water Cleanup System Isolation, Secondary Containment Isolation, and Control Room Emergency Filter System Initiation27 May 2004License Amendment Request, Revised Logic for Reactor Water Cleanup System Isolation, Secondary Containment Isolation, and Control Room Emergency Filter System Initiation
NLS2004056, Emergency Plan Implementing Procedures23 April 2004Emergency Plan Implementing ProceduresHealth Physics Network
Met Tower
Minimum staff
NLS2004061, Supplemental Response to the April 29, 2003, Orders to Nebraska Public Power District29 April 2004Supplemental Response to the April 29, 2003, Orders to Nebraska Public Power DistrictEnforcement Discretion
NLS2004063, Resubmittal of Inservice Inspection Relief Request PR-0318 May 2004Resubmittal of Inservice Inspection Relief Request PR-03
NLS2004064, April 2004 Monthly Operating Report for Cooper Nuclear Station12 May 2004April 2004 Monthly Operating Report for Cooper Nuclear Station