Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000327/2002004 | 28 October 2002 | NRC Integrated IR-05000327-02-004 & IR-05000328-02-004 | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Fire Barrier Hydrostatic Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program Fire Watch Power change |
IR 05000327/2002007 | 18 December 2002 | IR 05000327-02-007, on 09/13 - 11/18-19/2002, Sequoyah, Units 1 & 2. Event Follow-Up. Non-Cited Violation Noted | Significance Determination Process |
IR 05000327/2002301 | 20 December 2002 | NRC Examination Reports 50-327/2002-301 and 50-328/2002-301, on December 2-6, 2002. Licensed Operator Examinations | |
ML022810325 | 7 October 2002 | NRC Staff Request for Denial of Tennessee Valley Authority, August 22, 2002, Motion to Compel Staff to Pay Additional Travel Expenses to Mcarthur | |
ML022810404 | 7 October 2002 | September 2002 Monthly Operating Report for Sequoyah Units 1 & 2 | |
ML022810579 | 7 October 2002 | NRC Staff Objection to Submission of TVA Exhibit 75 | |
ML022820270 | 3 October 2002 | NRC Office of Investigations Case Number 2-2002-008 | |
ML022820398 | 9 October 2002 | Secy Memorandum to Board and Parties Re LBP-02-14 | |
ML022830808 | 10 October 2002 | Meeting with Public in Dayton, Tenn. to Discuss Recently Completed NRC Safety Evaluations for Tritium Production | Open House |
ML022830835 | 10 October 2002 | Meeting with TVA Regarding Various Topical Reports Associated with the Steam Generator Replacement at Sequoyah, Unit 1 | |
ML022870008 | 16 October 2002 | Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D | |
ML022880577 | 15 October 2002 | G20020558/LTR-02-0620 - Keith Bustos Ltr. Nuclear Energy | |
ML022940477 | 4 October 2002 | Seqouyah Units 1 & 2 Technical Specification (TS) Change No. 02-07, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt). | Non-Destructive Examination Probabilistic Risk Assessment Coatings Large early release frequency Moisture barrier |
ML022950112 | 17 October 2002 | Application for Technical Specification (TS) Change - Missed Surveillances Using the Consolidated Line Item Improvement Process (Revision 1) | Time of Discovery Missed surveillance Liquid penetrant |
ML022960514 | 10 October 2002 | Unit 1 - Technical Specification (TS) Change No. 02-02, Steam Generator (SG) Alternate Repair Criteria (ARC) Deletion and SG Inspection Interval Revision - Partial Withdrawal | Operating Basis Earthquake |
ML022980016 | 24 October 2002 | LB Memorandum and Order (Rejection of Late-Filled Exhibit; Closing of Evidentiary Record; Transcript Corrections; Schedules for Proposed Findings of Fact and Conclusions of Law) | |
ML022980051 | 31 October 2002 | Falsification of Background Investigations (Investigation Report No. 2-2002-028) and Exercise of Enforcement Discretion | Enforcement Discretion |
ML022980100 | 18 October 2002 | Tennessee Valley Authority'S Response in Support of the Admission of TVA Exhibit No. 75 | |
ML022980193 | 31 October 2002 | EN-02-053 Order Prohibiting Involvement in NRC-Licensed Activities (Immediately Effective) | Enforcement Discretion |
ML023010683 | 25 October 2002 | Cycle 11 12-Month Steam Generator Inspection Report | |
ML023020081 | 25 October 2002 | Letter Regarding TVA Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | Fitness for Duty Health Physics Network |
ML023020148 | 9 October 2002 | Tennessee Valley Authority - Discharge Monitoring Report for Sequoyah Nuclear Plant | |
ML023030290 | 22 October 2002 | Public Meeting Summary - Meeting Category 1 - TVA Nuclear Facilities | Power change |
ML023030301 | 15 October 2002 | TVA Nuclear Strategic Performance Improvement Initiatives | Power change |
ML023080179 | 1 November 2002 | Meeting with Ice Condenser Users Group Regarding Review of Topical Report ICUG-001 and TS Change TSFT-429 Sequoyah, Watts Bar, D.C.Cook, McGuire and Catawba | |
ML023090379 | 25 October 2002 | Letter from Tennessee Valley Authority, Sequoyah Nuclear Plant (SQN) - Fire Protection Report Changes (Revisions 9, 10, 11, 12, and 13) | |
ML023090395 | 25 October 2002 | Part 2 of 3, Sequoyah Nuclear Plant Fire Protection Report, Revision 9 Dated 10/12/2001 | Hot Short Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Hydrostatic Emergency Lighting Accidental discharge Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Grace period |
ML023090413 | 25 October 2002 | Part 1 of 3, Sequoyah Nuclear Plant Fire Protection Report, Revision 9 Dated 10/12/2001 | Hot Short Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Hydrostatic Emergency Lighting Accidental discharge Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Grace period |
ML023090415 | 25 October 2002 | Part 3 of 3, Sequoyah Nuclear Plant Fire Protection Report, Revision 9 Dated 10/12/2001 | Hot Short Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Emergency Lighting Fire Protection Program Fire Watch Grace period |
ML023100039 | 11 November 2002 | Examples of Risk-Informed Licensing Actions for Acrs/Acnw | Probabilistic Risk Assessment Large early release frequency |
ML023100383 | 28 October 2002 | Emergency Plan Implementing Procedure (EPIP) Revision | Met Tower |
ML023220113 | 15 November 2002 | Units 1 and 2 - 10CFR 50.59, Changes, Tests and Experiments Summary Report | Safe Shutdown Boric Acid Post Accident Monitoring |
ML023220122 | 15 November 2002 | Unit 2 - Technical Specification (TS) Change No. 02-03, Revision 1, License Amendment Request (LAR) to Support Unit 1 Generator Replacement Project | Safe Shutdown Ultimate heat sink Safeguards Contingency Plan Control of Heavy Loads |
ML023220198 | 13 November 2002 | TVA Central Emergency Control Center (CECC) - Emergency Plan Implementing Procedure (EPIP) Revisions | Fitness for Duty |
ML023230102 | 15 November 2002 | Tennessee Valley Authority'S Response to the October 24, 2002, Memorandum and Order | |
ML023230192 | 19 November 2002 | Summary of Public Meeting in Dayton Tennessee, Nrc'S Safety Evaluations of Tennessee Valley Authority'S License Amendment Request for Tritium Production at Watts Bar & Sequoyah | Open House |
ML023230321 | 15 November 2002 | Technical Specification Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume. | Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML023240318 | 15 November 2002 | TVA - NRC Staff Response to October 24, 2002 Memorandum and Order | |
ML023250196 | 8 November 2002 | Emergency Plan Implementing Procedure (EPIP) Revision 34 | Safe Shutdown High winds Reactor Vessel Water Level Offsite Dose Calculation Manual Earthquake Pressure Boundary Leakage |
ML023250516 | 21 November 2002 | RAI, Bulletin 2002-01 60-Day Responses | Boric Acid VT-2 |
ML023290410 | 15 November 2002 | Technical Specification (TS) Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume. | Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML023290477 | 15 November 2002 | Technical Specification Change 02-01: Nominal Trip Setpoints for Reactor Protection System (RPS) & Engineered Safety Features (ESF) Instrumentation & Relocation of Loss of Power & Radiation Monitoring Instrumentation Requirements | |
ML023300568 | 26 November 2002 | Notification of Sequoyah Nuclear Plant - Safety System Design and Performance Capability Inspection - NRC Inspection Report 50-327/2003-02 and 50-328/2003-02 | Probabilistic Risk Assessment Temporary Modification |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023370300 | 15 November 2002 | Amended Discharge Monitoring Report (DMR) for August 2002 | |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023380703 | 4 December 2002 | RAI, Unit 1 Steam Generator Replacement Topical Reports and Associated TS Amendment | Safe Shutdown Ultimate heat sink Commercial Grade Dedication Finite Element Analysis Design basis earthquake Large early release frequency Earthquake Control of Heavy Loads |
ML023400565 | 29 November 2002 | Summary of Meeting with TVA to Discuss Sequoyah Unit 1 Steam Generator Replacement | |
ML023430025 | 13 November 2002 | G20020651- Thomas Saporito Ltr 2.206 Sequoyah Unit 2, & San Onofre Units 2 and 3 | |
ML023430545 | 9 December 2002 | Notice of Meeting with Tennessee Valley Authority Re Status of Licensing Activities for Sequoyah Nuclear Plant, Units 1 & 2 |