Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000327/200200428 October 2002NRC Integrated IR-05000327-02-004 & IR-05000328-02-004Safe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Fire Protection Program
Fire Watch
Power change
IR 05000327/200200718 December 2002IR 05000327-02-007, on 09/13 - 11/18-19/2002, Sequoyah, Units 1 & 2. Event Follow-Up. Non-Cited Violation NotedSignificance Determination Process
IR 05000327/200230120 December 2002NRC Examination Reports 50-327/2002-301 and 50-328/2002-301, on December 2-6, 2002. Licensed Operator Examinations
ML0228103257 October 2002NRC Staff Request for Denial of Tennessee Valley Authority, August 22, 2002, Motion to Compel Staff to Pay Additional Travel Expenses to Mcarthur
ML0228104047 October 2002September 2002 Monthly Operating Report for Sequoyah Units 1 & 2
ML0228105797 October 2002NRC Staff Objection to Submission of TVA Exhibit 75
ML0228202703 October 2002NRC Office of Investigations Case Number 2-2002-008
ML0228203989 October 2002Secy Memorandum to Board and Parties Re LBP-02-14
ML02283080810 October 2002Meeting with Public in Dayton, Tenn. to Discuss Recently Completed NRC Safety Evaluations for Tritium ProductionOpen House
ML02283083510 October 2002Meeting with TVA Regarding Various Topical Reports Associated with the Steam Generator Replacement at Sequoyah, Unit 1
ML02287000816 October 2002Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D
ML02288057715 October 2002G20020558/LTR-02-0620 - Keith Bustos Ltr. Nuclear Energy
ML0229404774 October 2002Seqouyah Units 1 & 2 Technical Specification (TS) Change No. 02-07, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt).Non-Destructive Examination
Probabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
ML02295011217 October 2002Application for Technical Specification (TS) Change - Missed Surveillances Using the Consolidated Line Item Improvement Process (Revision 1)Time of Discovery
Missed surveillance
Liquid penetrant
ML02296051410 October 2002Unit 1 - Technical Specification (TS) Change No. 02-02, Steam Generator (SG) Alternate Repair Criteria (ARC) Deletion and SG Inspection Interval Revision - Partial WithdrawalOperating Basis Earthquake
ML02298001624 October 2002LB Memorandum and Order (Rejection of Late-Filled Exhibit; Closing of Evidentiary Record; Transcript Corrections; Schedules for Proposed Findings of Fact and Conclusions of Law)
ML02298005131 October 2002Falsification of Background Investigations (Investigation Report No. 2-2002-028) and Exercise of Enforcement DiscretionEnforcement Discretion
ML02298010018 October 2002Tennessee Valley Authority'S Response in Support of the Admission of TVA Exhibit No. 75
ML02298019331 October 2002EN-02-053 Order Prohibiting Involvement in NRC-Licensed Activities (Immediately Effective)Enforcement Discretion
ML02301068325 October 2002Cycle 11 12-Month Steam Generator Inspection Report
ML02302008125 October 2002Letter Regarding TVA Central Emergency Control Center Emergency Plan Implementing Procedure RevisionsFitness for Duty
Health Physics Network
ML0230201489 October 2002Tennessee Valley Authority - Discharge Monitoring Report for Sequoyah Nuclear Plant
ML02303029022 October 2002Public Meeting Summary - Meeting Category 1 - TVA Nuclear FacilitiesPower change
ML02303030115 October 2002TVA Nuclear Strategic Performance Improvement InitiativesPower change
ML0230801791 November 2002Meeting with Ice Condenser Users Group Regarding Review of Topical Report ICUG-001 and TS Change TSFT-429 Sequoyah, Watts Bar, D.C.Cook, McGuire and Catawba
ML02309037925 October 2002Letter from Tennessee Valley Authority, Sequoyah Nuclear Plant (SQN) - Fire Protection Report Changes (Revisions 9, 10, 11, 12, and 13)
ML02309039525 October 2002Part 2 of 3, Sequoyah Nuclear Plant Fire Protection Report, Revision 9 Dated 10/12/2001Hot Short
Safe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Emergency Lighting
Accidental discharge
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Grace period
ML02309041325 October 2002Part 1 of 3, Sequoyah Nuclear Plant Fire Protection Report, Revision 9 Dated 10/12/2001Hot Short
Safe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Emergency Lighting
Accidental discharge
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Grace period
ML02309041525 October 2002Part 3 of 3, Sequoyah Nuclear Plant Fire Protection Report, Revision 9 Dated 10/12/2001Hot Short
Safe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Emergency Lighting
Fire Protection Program
Fire Watch
Grace period
ML02310003911 November 2002Examples of Risk-Informed Licensing Actions for Acrs/AcnwProbabilistic Risk Assessment
Large early release frequency
ML02310038328 October 2002Emergency Plan Implementing Procedure (EPIP) RevisionMet Tower
ML02322011315 November 2002Units 1 and 2 - 10CFR 50.59, Changes, Tests and Experiments Summary ReportSafe Shutdown
Boric Acid
Post Accident Monitoring
ML02322012215 November 2002Unit 2 - Technical Specification (TS) Change No. 02-03, Revision 1, License Amendment Request (LAR) to Support Unit 1 Generator Replacement ProjectSafe Shutdown
Ultimate heat sink
Safeguards Contingency Plan
Control of Heavy Loads
ML02322019813 November 2002TVA Central Emergency Control Center (CECC) - Emergency Plan Implementing Procedure (EPIP) RevisionsFitness for Duty
ML02323010215 November 2002Tennessee Valley Authority'S Response to the October 24, 2002, Memorandum and Order
ML02323019219 November 2002Summary of Public Meeting in Dayton Tennessee, Nrc'S Safety Evaluations of Tennessee Valley Authority'S License Amendment Request for Tritium Production at Watts Bar & SequoyahOpen House
ML02323032115 November 2002Technical Specification Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume.Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
ML02324031815 November 2002TVA - NRC Staff Response to October 24, 2002 Memorandum and Order
ML0232501968 November 2002Emergency Plan Implementing Procedure (EPIP) Revision 34Safe Shutdown
High winds
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Earthquake
Pressure Boundary Leakage
ML02325051621 November 2002RAI, Bulletin 2002-01 60-Day ResponsesBoric Acid
VT-2
ML02329041015 November 2002Technical Specification (TS) Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume.Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
ML02329047715 November 2002Technical Specification Change 02-01: Nominal Trip Setpoints for Reactor Protection System (RPS) & Engineered Safety Features (ESF) Instrumentation & Relocation of Loss of Power & Radiation Monitoring Instrumentation Requirements
ML02330056826 November 2002Notification of Sequoyah Nuclear Plant - Safety System Design and Performance Capability Inspection - NRC Inspection Report 50-327/2003-02 and 50-328/2003-02Probabilistic Risk Assessment
Temporary Modification
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02337030015 November 2002Amended Discharge Monitoring Report (DMR) for August 2002
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML0233807034 December 2002RAI, Unit 1 Steam Generator Replacement Topical Reports and Associated TS AmendmentSafe Shutdown
Ultimate heat sink
Commercial Grade Dedication
Finite Element Analysis
Design basis earthquake
Large early release frequency
Earthquake
Control of Heavy Loads
ML02340056529 November 2002Summary of Meeting with TVA to Discuss Sequoyah Unit 1 Steam Generator Replacement
ML02343002513 November 2002G20020651- Thomas Saporito Ltr 2.206 Sequoyah Unit 2, & San Onofre Units 2 and 3
ML0234305459 December 2002Notice of Meeting with Tennessee Valley Authority Re Status of Licensing Activities for Sequoyah Nuclear Plant, Units 1 & 2