MONTHYEARML0220005542002-07-10010 July 2002 Unit 2 - Technical Specification (TS) Change No. 02-03, Essential Raw Cooling Water (ERCW) Operability During Movement of Heavy Loads - One Time TS Change in Support of Steam Generator Replacement Project Project stage: Other ML0225502792002-09-0909 September 2002 Memo, Draft Questions for the Unit 1 Steam Generator Replacement Topical Reports & Associated Technical Specification Amendment Project stage: Draft Other ML0232201222002-11-15015 November 2002 Unit 2 - Technical Specification (TS) Change No. 02-03, Revision 1, License Amendment Request (LAR) to Support Unit 1 Generator Replacement Project Project stage: Request ML0234005652002-11-29029 November 2002 Summary of Meeting with TVA to Discuss Sequoyah Unit 1 Steam Generator Replacement Project stage: Meeting ML0233807032002-12-0404 December 2002 RAI, Unit 1 Steam Generator Replacement Topical Reports and Associated TS Amendment Project stage: RAI ML0316109082002-12-24024 December 2002 Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Attachment 1 Through Figure 3 Project stage: Other ML0316108992002-12-24024 December 2002 Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Table of Contents Through Figure 1 Project stage: Other ML0301602402003-01-15015 January 2003 Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling Topical Report, Response to NRC Request for Additional Information Project stage: Response to RAI ML0306509802003-02-26026 February 2003 Tech Spec Change No. 02-03, Rev 2, License Amendment Request to Support Unit 1 Steam Generator Replacement Project Project stage: Request ML0308502292003-03-25025 March 2003 Safety Evaluation of Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling. Project stage: Approval ML0314902592003-05-19019 May 2003 Accepted Version of Topical Report No. 24370-TR-C-002-A, Rigging and Heavy Load Handling. Project stage: Other 2002-07-10
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22115A0022022-05-17017 May 2022 Correction to Amendment No. 350 Regarding One-Time Change to Technical Specification3.4.12, Low Temperature Overpressure Protection System, CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-21-085, License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-02-24024 February 2022 License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01)2021-11-29029 November 2021 Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2021-08-0505 August 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-042, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05)2020-04-17017 April 2020 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05) CNL-20-010, Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-02-24024 February 2020 Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-19-066, Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2020-01-14014 January 2020 Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-16016 November 2019 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-005, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01)2019-02-0101 February 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-085, License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme2018-06-15015 June 2018 License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme CNL-17-010, Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)2018-03-16016 March 2018 Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06) CNL-17-150, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04)2018-03-0909 March 2018 Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) NL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .. CNL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS)2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS) .. NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-008, License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) NL-17-008, Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-03-13013 March 2017 Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days2016-07-22022 July 2016 Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days CNL-16-001, Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-05-26026 May 2016 Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-018, License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82016-05-16016 May 2016 License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 CNL-15-178, License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482)2015-08-28028 August 2015 License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482) CNL-15-164, Second Annual Update, License Renewal Application2015-08-14014 August 2015 Second Annual Update, License Renewal Application CNL-14-075, Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82014-05-27027 May 2014 Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML13329A7172013-11-22022 November 2013 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) ML13281A8062013-08-0606 August 2013 Operating License Renewal, Site 40HA22 and Revision to Phase I Cultural Resources Survey Final Report, Hamilton County, Tn ML13199A2812013-07-0303 July 2013 Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) ML13024A0072013-01-0707 January 2013 License Renewal Application, Part 5 of 8 ML13024A0112013-01-0707 January 2013 Sequoyah Nuclear Plant, Units 1 and 2 - License Renewal Application, Part 1 of 8 ML13024A0062013-01-0707 January 2013 License Renewal Application, Part 4 of 8 2023-09-20
[Table view] |
Text
November 15, 2002 TVA-SQN-TS-02-03 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of ) Docket No. 50-328 Tennessee Valley Authority )
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 - TECHNICAL SPECIFICATION (TS) CHANGE NO. 02-03, REVISION 1, LICENSE AMENDMENT REQUEST (LAR) TO SUPPORT UNIT 1 GENERATOR REPLACEMENT PROJECT
References:
- 1. TVA letter to NRC dated April 15, 2002, Sequoyah Nuclear Plant, Steam Generator Replacement Project - Topical Report No.
24370-TR-C-002, Rigging and Heavy Load Handling TAC No. MB5370
- 2. TVA letter to NRC dated July 10, 2002, Sequoyah Nuclear Plant - Unit 2 - Technical Specification Change 02-03, Essential Raw Cooling Water Operability During Movement of Heavy Loads - One Time TS Change in Support of the Steam Generator Replacement Project
- 3. NRC letter to Entergy Operations Inc. dated September 25, 2000, Arkansas Nuclear One, Unit Nos. 1 and 2 - Issuance of Amendments Re:
Steam Generator Load Handling (TAC Nos. MA6573 and MA 6574)
In accordance with the provisions of 10 CFR 50.90, TVA is requesting an amendment to Unit 2 Operating License (OL) DPR-
- 79. The proposed request adds a one-time condition for
U.S. Nuclear Regulatory Commission Page 2 November 15, 2002 conduct of heavy load lifts associated with the SQN Unit 1 steam generator replacement (SGR) project. The one-time condition establishes special provisions and requirements for safe operation of Unit 2 while heavy load lifts are performed on Unit 1. The provision for heavy load lifts is described in Topical Report 24370-TR-C-002 that was previously submitted by Reference 1 for NRC review and approval. The topical report contains prerequisite actions for heavy load movement, active monitoring during heavy load movement, and compensatory measures in response to the unlikely event of a heavy load drop. Similar provisions were approved for use during the SGR project at Arkansas Nuclear One, Unit 2 (see Reference 3).
The enclosed LAR replaces TVA TS Change 02-03 previously provided by Reference 2. As discussed during an October 24, 2002 meeting between TVA, Bechtel, and NRC staff, TVA is withdrawing the Reference 2 request.
TVA has determined that there are no significant hazards considerations associated with the proposed change and that the change is exempt from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). The SQN Plant Operations Review Committee and the SQN Nuclear Safety Review Board have reviewed this proposed change and determined that operation of SQN Unit 2, in accordance with the proposed change, will not endanger the health and safety of the public. Additionally, in accordance with 10 CFR 50.91(b)(1),
TVA is sending a copy of this letter and enclosure to the Tennessee State Department of Public Health. to this letter provides the description and evaluation of the proposed license amendment. This includes TVA's determination that the proposed change does not involve a significant hazards consideration, and is exempt from environmental review. Enclosure 2 contains a page from Unit 2 OL marked-up to show the proposed change.
TVA requests NRC review and approval by December 31, 2002, to support the SQN Unit 1 SG replacement outage currently scheduled to begin March 16, 2003. There are no additional commitments contained in this submittal. This letter is
ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
UNIT 2 DOCKET NO. 328 PROPOSED LICENSE AMENDMENT DESCRIPTION AND EVALUATION OF THE PROPOSED CHANGE I. DESCRIPTION OF THE PROPOSED CHANGE The proposed license amendment provides a one-time change to the SQN Unit 2 Operating License. The proposed change establishes a one-time license condition for safe operation of Unit 2 when conducting heavy load lift activities during the Unit 1 steam generator replacement (SGR) project. The proposed change is submitted in accordance with NRC Bulletin 96-02, Movement of Heavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety-Related Equipment. The proposed amendment provides controls during heavy load lifts over underground sections of ERCW piping that serve Unit 2. In addition, compensatory measures establish safe shutdown capability for Unit 2 in the event of a postulated heavy load drop affecting the ERCW system. The proposed one-time change is as follows:
During the Unit 1 Cycle 12 refueling and steam generator replacement outage, lifts of heavy loads will be performed in accordance with NRC Bulletin 96-02 and will adhere to the prescribed compensatory measures contained in Topical Report 24370-TR-C-002, as approved in NRC SER dated As stated in the above change, the details of the heavy load lifts are described and contained in Topical Report 24370-TR-C-002. This report was previously submitted to NRC for review and approval by TVA letter dated April 15, 2002. The topical report supports TVAs proposed license amendment.
II. REASON FOR THE PROPOSED CHANGE The reason for the proposed change is to establish one-time special requirements for SQNs ERCW system that support operation of Unit 2 during change out of the Unit 1 steam generators (SGs). TVA has scheduled E1-1
replacement of the Unit 1 SGs in the spring of 2003. The replacement of the Unit 1 SGs requires heavy load lifts over portions of underground ERCW system piping that supplies cooling water to safety-related plant equipment/components on Unit 2. These activities are not described in the SQN Updated Final Safety Analysis Report (UFSAR). The technical justification for these activities is described in Topical Report 24370-TR-C-002 that documents specific provisions that will ensure the heavy load handling activities are accomplished safely without impacting operation of Unit 2. Accordingly, a license amendment request is submitted in advance of the planned movement of loads in accordance with guidance provided by NRC Bulletin 96-02.
III. SAFETY ANALYSIS Four SQN Unit 1 SGs will be replaced during the Unit 1 Cycle 12 refueling outage scheduled for the spring of 2003. The SGR project will utilize a special heavy lift crane (referred to as an Outside Lift System [OLS]) that will be used to lift the old SGs vertically out through the top of the Unit 1 containment structure. The SGR project will involve heavy loads that will traverse over safety-related structures, systems, and components (SSCs) on both units. The SSCs potentially affected by a postulated load drop are described and evaluated in Topical Report 24370-TR-C-002, (Section 6.0).
The OLS for the SGR project is commercially available equipment and is not specifically designed as single failure proof and is not specifically designed to withstand the external events that are part of the SQN licensing basis. Accordingly, the effects of postulated load drops were analyzed for the SQN SGR project in accordance with NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. An issue was identified for heavy load movement during the SGR project that involves the SQN ERCW system. The ERCW system will be supporting operation of Unit 2 during the Unit 1 SGR project. This system is a safety-related system that has piping common to both units. The system supplies cooling water from the Tennessee River (ultimate heat sink) for the various safety-related components within the plant. The ERCW system is described in Section 9.2.2 of the SQN UFSAR. A postulated load drop from the OLS has the potential for affecting sections of ERCW piping in the load path. The sections of piping affected include the ERCW supply piping (Unit 1, Trains A and B) and/or the ERCW Train A discharge piping (discharge piping common to both units). This E1-2
piping is routed inside an underground pipe tunnel adjacent to the Unit 1 containment structure. Failure of this ERCW piping due to a postulated load drop could affect safety-related components associated with both operation and safe shutdown of Unit 2. The effects of the SGR project on SSCs required for safe operation and safe shutdown capability for Unit 2 is evaluated in Topical Report 24370-TR-C-002. The topical report provides the technical justification for the use of cranes and rigging of heavy loads in support of Unit 1 SGR project and provides the technical basis for the proposed license amendment. Mitigation of an assumed load drop requires compensatory measures be implemented to isolate the affected ERCW piping and restore ERCW flow to required equipment. The compensatory measures are NRC commitments in TVAs letter dated April 15, 2002 (contains Topical Report 24370-TR-C-002). It may be noted that compensatory measures have been utilized for SGR projects at other plant sites (reference NRC letter to Entergy Operations Inc. dated September 25, 2000, Arkansas Nuclear One, Unit Nos. 1 and 2, - Issuance of Amendments Re: Steam Generator Load Handling, TAC Nos. MA6573 and MA6574). Based on the provisions and compensatory measures described in the topical report, safe operation/safe shutdown capability of Unit 2 is maintained during the heavy load lifts over underground sections of piping associated with SQNs ERCW system.
IV. NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION TVA has concluded that operation of Sequoyah (SQN)
Unit 2, in accordance with the proposed change does not involve a significant hazards consideration. TVA's conclusion is based on its evaluation, in accordance with 10 CFR 50.91(a)(1), of the three standards set forth in 10 CFR 50.92(c).
TVAs proposed license amendment is a one-time change to the SQN Unit 2 operating license. The proposed change includes a provision for maintaining operability of the essential raw cooling water (ERCW) system during performance of heavy load lifts associated with the Unit 1 steam generator replacement (SGR) project. The one-time license provision provides reference to Topical Report 24370-TR-C-002 that contains heavy load lift requirements that ensure safe operation of Unit 2. In addition, compensatory measures ensure safe shutdown capability of Unit 2 in the unlikely event a heavy load drop occurs over specific sections of ERCW system piping.
E1-3
A. The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
No changes in event classification as discussed in SQN Updated Final Safety Analysis Chapter 15 will occur due to the proposed license amendment. The one-time provision ensures that the SQN ERCW system remains functional for continued safe operation of Unit 2 during heavy load lifts performed on Unit 1 during SGR replacement activities.
Accordingly, the proposed modification to SQN Unit 2 operating license and the implementation of compensatory measures for a postulated load drop will not significantly increase the probability or consequences of an accident previously evaluated.
B. The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The possibility of a new or different accident scenario occurring as a result of activities conducted during the SQN Unit 1 SGR project are not created. Three postulated scenarios related to heavy load handling during the SGR project were examined for their potential to represent a new or different kind of accident from those previously evaluated: (1) a breach of the old steam generator (OSG),
resulting in the release of contained radioactive material, (2) flooding in the Auxiliary Building caused by the failure of piping in the ERCW tunnel, and (3) loss of ERCW to support safe shutdown of the operating unit.
Failure of an OSG that results in a breach of the primary side of the steam generator (SG) could potentially result in a release of a contained source outside containment.
The consequences of this event, both offsite and in the control room, were examined and found to be within the consequences of the failure of other contained sources outside containment at the SQN site (i.e., within the SQN design basis).
With regard to flooding of the Auxiliary Building from a heavy load drop, the protective measure taken prior to the lifting of heavy loads include installation of a wall in the ERCW tunnel near the Auxiliary Building interface. The wall provides protection against a postulated flood of the ERCW tunnel and protects against flooding of the Auxiliary Building beyond those events previously evaluated.
E1-4
With regard to the potential for a heavy load drop causing the loss of ERCW cooling water to the operating unit (i.e.,
Unit 2), TVA is implementing provisions to preclude a load drop. A heavy load drop is considered an unlikely accident for the following reasons:
- The lifting equipment was specifically designed and chosen for the subject heavy lifts,
- Crane operators will be specially trained in the operation of the lift equipment and in the SQN site conditions,
- Qualifying analyses and administrative controls will be used to protect the lifts from the effects of external events,
- The areas over which a load drop could cause loss of ERCW are a small part of the total travel path of the loads.
In addition, protection against the potential for a loss of ERCW is established prior to any heavy load lifts.
Compensatory measures ensure the ERCW system is isolated should a pipe break occur, and that ERCW flow is redirected to equipment essential for safe shutdown capability of Unit 2.
Accordingly, the possibility of a new or different kind of accident from any accident previously evaluated is not created.
C. The proposed amendment does not involve a significant reduction in a margin of safety.
The proposed change to the Unit 2 operating license supports safe operation and safe shutdown capabilities of Unit 2 during replacement of the Unit 1 SGs. These measures do not result in changes in the design basis for plant structures, systems, and components (SSCs).
Consequently, the proposed change will not affect any margins of safety for plant SSCs.
Accordingly, a significant reduction in the margin of safety is not created by the proposed change.
V. ENVIRONMENTAL IMPACT CONSIDERATION The proposed change does not involve a significant hazards consideration, a significant change in the types of or significant increase in the amounts of any effluents that may be released offsite, or a E1-5
significant increase in individual or cumulative occupational radiation exposure. Therefore, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), an environmental assessment of the proposed change is not required.
E1-6
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY SEQUOYAH PLANT (SQN)
UNIT 2 PROPOSED LICENSE AMENDMENT MARKED PAGES I. AFFECTED PAGE LIST Unit 2 Operating License Page 11 II. MARKED PAGES See attached.
E2-1
- s. Primary Coolant Outside Containment (Section 22.2, III.D.1.1)
Prior to exceeding 5 percent power level, TVA is required to complete the leak tests on Unit 2, and results are to be submitted within 30 days from the completion of the testing.
(17) Surveillance Interval Extension The performance interval for the 36-month surveillance requirements in TS 4.3.2.1.3 shall be extended to May 18, 1996, to coincide with the Cycle 7 refueling outage.
The extended interval shall not exceed a total of 50 months for the 36-month surveillances.
(18) Mixed Core DNBR Penalty TVA will obtain NRC approval prior to startup for any cycle's core that involves a reduction in the departure from nucleate boiling ratio initial transition core penalty INSERT A below that value stated in TVA's submittal on Framatome fuel conversion dated April 6, 1997.
D. Exemptions from certain requirements of Appendices G and J to 10 CFR Part 50 are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplements No. 1 and No. 5.
These exemptions are authorized by law and will not endanger life or property or the common defence and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.
A temporary exemption from General Design Criterion 57 found in Appendix A to 10 CFR part 50 is described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 5, Section 6.2.4. This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. The exemption, therefore, is hereby granted and shall remain in effect through the first refueling outage as discussed in Section 6.2.4 of Supplement 5 to the Safety Evaluation Report. The granting of the exemption is authorized with the issuance of the Facility Operating License. The facility will operate, to the extent authorized herein, in conformity with the application as amended, the provisions of the Act, and the regulations of the Commission. Additional Exemptions are listed in Attachment 2.
E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revision to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Safeguards Contingency Plan is incorporated into the Physical Security Plan. The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Sequoyah Physical Security Plan," with revisions submitted through November 23, 1987; and "Sequoyah Security Personnel Training and Qualification Plan," with revisions submitted through April 16, 1987. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
April 21, 1997 Amendment Nos. 65, 162, 170, 204, 214 E2-2
INSERT A (19) Steam Generator Replacement Project During the Unit 1 Cycle 12 refueling and steam generator replacement outage, lifts of heavy loads will be performed in accordance with NRC Bulletin 96-02 and will adhere to the prescribed compensatory measures contained in Topical Report 24370-TR-C-002, as approved in NRC SER dated ________________.
E2-3