Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02037010331 January 2002Technical Specifications Pages Amendment 199 Minimum Critical Power Ratio Safety LimitReactor Vessel Water Level
ML0203903917 February 2002Technical Specifications Re Reactor Pressure Vessel Pressure-Temp Limit CurvesHydrostatic
ML0206700077 March 2002Technical Specification Pages for Amendments 201 & 175, Susquehanna, Units 1 & 2
ML0207000218 March 2002Technical Specifications Pages for Amendments 202 & 176, Susquehanna, Units 1 & 2
ML02212019818 July 2002Improved Technical Specifications Manual Bases Table of Contents & Rev. 34
ML02212028618 July 2002Approved Amendment to Unit 2 Technical Requirements Manual
ML02212029218 July 20022 to Approved Amendment to Susquehanna Steam Electric Station, Unit 2 Technical Specifications Bases Manual
ML0231805007 November 2002Approved Amendment to Technical Specifications Bases Manual, Revision 33Unanalyzed Condition
Reactor Vessel Water Level
Anticipated operational occurrence
Hydrostatic
Missed surveillance
ML0232303478 November 2002Proposed Change to the SSES Unit 1 & 2 Technical Specification Bases LCO 3.1.7: PLA-5538
ML0304405816 February 2003Improved TS Bases Manuals Unit 2Safe Shutdown
Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML03084059117 March 2003Revised Improved TS Manual Bases Unit 1Offsite Circuit
ML03084059617 March 2003Revised Improved TS Bases Manuals Unit 2Offsite Circuit
ML03119032623 April 2003Revised Technical Requirements Manual Unit 2Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
ML03119033223 April 2003Revised Improved Technical Specifications Bases Manuals Unit 2Reactor Vessel Water Level
Squib
Fuel cladding
ML03119034223 April 2003Revised Improved TS Manual Bases Unit 1Reactor Vessel Water Level
Squib
ML03119041523 April 2003Revised Technical Requirements Manual Unit 1
ML0313405757 May 2003Transmittal of Revision 43 of Improved Technical Specifications Manual Bases Unit 1
ML03225027431 July 2003Improved Technical Specifications Manual Bases Unit 1, Rev 45Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Fuel cladding
ML03246118825 August 2003Transmittal of Susquehanna, Revision 44 to ITSB2 - Improved Technical Specifications Bases Manuals Unit 2Reactor Vessel Water Level
Squib
Fuel cladding
ML03246126225 August 2003Revision 46, to ITSB1 - Improved Technical Specifications Manual Bases Unit 1Reactor Vessel Water Level
Fuel cladding
ML03309040329 October 2003Tech Spec Pages for Amendments 215 & 190 Revised Response to Generic Letter 94-02 Long-Term Stability SolutionShutdown Margin
Post Accident Monitoring
Scram Discharge Volume
ML0332400397 November 2003Transmittal of Technical Specifications Bases Unit 2 ManualAnticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML0332400417 November 2003Transmittal of Technical Specification Bases Unit 1 ManualAnticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML0425902023 September 2004Revision to Technical Specifications Bases Unit 2 ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML0425902103 September 2004Technical Specification Bases Unit 1 Manual.Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML0501101124 January 2005SSES Manual TSB2, Technical Specifications Base, Unit 2 Manual.Shutdown Margin
High Radiation Area
Ultimate heat sink
Stroke time
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML05033047525 January 2005TSB2 - Technical Specifications Bases Unit 2 ManualShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
Fuel cladding
Offsite Circuit
ML05061020718 February 2005Technical Specification Bases Unit 1 ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML05061021418 February 2005Technical Specifications Bases Unit 2 ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML05090004329 March 2005Technical Specification Pages Re ADS-LPCI Discharge Pressure
ML05095034225 March 2005Changes to Technical Specifications Bases ManualShutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
ML05115033719 April 2005Technical Specification Bases for Susquehanna Unit 1 ManualSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Qualified Offsite Circuit
Missed surveillance
Foreign Material Exclusion
Scram Discharge Volume
Offsite Circuit
ML05115039019 April 2005Technical Specifications Bases Unit 2 ManualSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Qualified Offsite Circuit
Missed surveillance
Foreign Material Exclusion
Scram Discharge Volume
Offsite Circuit
ML0519904457 July 2005Technical Specification Bases Unit 1 Manual, Revision 1Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Overtravel
Fuel cladding
Offsite Circuit
Power change
ML0521700384 August 2005Technical Specification Pages Re Containment Purge Value Leak Rate Test FrequencySquib
ML05245015425 August 2005Revision to Technical Specifications Bases ManualHot Short
Shutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Squib
Scram Discharge Volume
ML05245015725 August 2005Rev. 2 to Technical Specification Bases Unit 1 ManualHot Short
Shutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Squib
Scram Discharge Volume
ML05256040531 August 2005Revisions to Technical Specifications Bases Unit 2 ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Squib
Scram Discharge Volume
Power Operated Valves
ML05300007020 October 2005Technical Specifications Bases Unit 1 Manual, TSB1 Rev 64Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML05318032810 November 2005Technical Specification Page Regarding Minimum Critical Power Ratio Safety LimitReactor Vessel Water Level
ML0532503298 November 2005Technical Specifications Bases, Revision 1Scram Discharge Volume
ML0532503308 November 2005Technical Specifications Bases Unit Change TSB2, Rev 1Scram Discharge Volume
ML0535703099 December 2005Revisions to the Technical Specification Bases ManualHot Short
Shutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Squib
Scram Discharge Volume
ML0603306392 February 2006Tech Spec Susquehanna Steam Electric Station, Unites 1 and 2 - Issuance of Amendment Revision to Specification Surveillance Requirement 3.6.4.1.4 and 3.6.4.1.5, Secondary Containment and Draw Down Testing
ML06080073120 March 2006Tech Spec for Susquehanna, Unit 1 - Issuance of Amendment Regarding Minimum Critical Power Ratio Safety Limit and Reference ChangesReactor Vessel Water Level
ML06087040717 March 2006Revision to Technical Specification Bases Unit 1 ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML06087041017 March 2006Technical Specifications Bases Unit 2 ManualSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML06090046530 March 2006Technical Specification 3.4.10 RCS Pressure and Temperature (P/T) Limits, October 5, 2005
ML06096033431 March 2006Susquehanna - Proposed License Amendment Numbers 285 for Unit 1 and 253 for Unit 2, Constant Pressure Power Uprate, PLA-6002Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Squib
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Fuel cladding
Flow Induced Vibration
ML06121006219 April 2006Technical Specification Bases Unit 1 Manual ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Qualified Offsite Circuit
Abnormal operational transient
Scram Discharge Volume
Fuel cladding
Offsite Circuit