Revised Technical Requirements Manual Unit 2
ML031190326
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/23/2003
From:
Susquehanna
To:
Office of Nuclear Reactor Regulation
References
Download: ML031190326 (18)


Text

,

,Apr.

23, 2003 Page 1

of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-21312 USER INFORMATION:

GER CH* OSE M EMPL#:28401 CA#: 0363 Addres NUCSA2 Phone#: 2

-3194 TRANSMITTAL INFORMATION:

TO:

CEfLACIIR M

04/23/2003 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER

'NUCSA-2)

QHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/21/2003 ADD MANUAL TABLE OF CONTENTS DATE: 04/22/2003 CATEGORY: DOCUMENTS TYPE: TRM ID:

TRM2 REPLACE:

REV:N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

<-I t

TRM APPROVED AMENDMENT TO UNIT 2 TECHNICAL REQUIREMENTS MANUAL EFFECTIVE DATE 04/1512003 Replace the following pages of the Technical Requirements Manual with the enclosed pages.

The revised pages are identified by Effective Date and contain vertical lines indicating the area of change.

EFFECTIVE REMOVE PAGES INSERT PAGES DATE TRM I LOES-1 through TRM / LOES-6 TRM I LOES-1 through TRM I LOES-6 04115103 Table of Contents, pages i through vi Table of Contents, pages i through vi 04115/03 3.1-11 through 3.1-13 TRM /3.7-51 and TRM 3.7-52 TRM /3.7-51 and TRM 3.7-52 04/15/03 B 3 1-9 and B 3 1-10 TRM / B 3.7-33 TRM I B 3.7-33 04115103 TRM/B3.11-25 TRMIB3.11-25 04/15103 g.Lic Docs\\TRM Word\\TRM Remove Insert\\RemlnsShellUnit,2.doc 4/11/03

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 TABLE OF CONTENTS 04/15/2003 USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM /1.0-3 08/31/1998 10/04/2002 08/31/1998 2.0 3.0 3.1 3.2 3.3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 through TRM / 2.0-4 Pages TRM /2.0-5 through TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Pages TRM 12.0-10 through TRM / 2.0-12 Page TRM / 2.0-13 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2/ `

Page TRM / 3.0-3 Page TRM /3.0-4 REACTIVITY CONTROL SY ST.EIS Pages 3.1-1 through 3.4-$)

Pages TRM / 3.1-7 and'RMf3.i 8 Pages TRM / 3.1-9"and TRM / 3.1-9a PageTRM/3.l4

\\

A CORE OPERATING LIMITS REPORT Page 3.2-1 z

PagesHAQ7Y.2-2 through TRM /3.2-35 INS1RUMENTATION PagejTRM / 3.3-1 through TRM / 3.3-3 (FPag6eTRM / 3.3-4 es 3.3-5 through 3.3-8 Pages TRM I 3.3-9 and TRM / 3.3-9a Pages TRM /3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 through TRM 1 3.3-15 Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-20 Pages 3.3-21 and 3.3-22 Pages TRM / 3.3-23 through TRM / 3.3-25 08/31/1998 06/25/2002 04/12/1999 08/30/2001 09/06/2002 04/12/1999 06/16/2000 04/08/1999 03/15/2002 04/0811999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 08/31/1998 03/10/2003 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 06/27/2001 06/14/2002 12/14/1998 08/31/1998 04/02/1999 I

SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 10/23/1998 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 08/31/1998 04/17/2000 08131/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM 1 3.6-5 Page 3.6-6

-Pages TRM / 3.6-7 through TRM / 3.6-9 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32 Page TRM / 3.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Pages 3.7-43 through 3.7-47 Page TRM / 3.7-48 Pages TRM /3.7-49 and TRM / 3.7-50 Pages TRM / 3.7-51 and TRM / 3.7-52 Page TRM / 3.7-53 07/29/1999 08/31/1998 08/02/1999 01/21/2000 08/02/1999 11/16/2001 10/05/2002 02/01/1999 08/31/1998 08/11/2000 08/31/1998 10/13/1998 03/08/2003 03/09/2001 04/15/2003 07/29/1999 3.8 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Page 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-8 Page TRM / 3.8-9 Page 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-11 a Pages 3.8-12 through 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 04/02/2002 08/31/1998 12/31/2002 04/02/2002 08/31/1998 08/24/2001 08/31/1998 04/02/2002 04/02/2002 08/31/1998 04/02/2002 02/01/1999 SUSQUEHANNA - UNIT 2 TRM I LOES-2 EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 04/02/2002 02/01/1999 06/06/1999 08/31/1998 3.9 3.10 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 08/31/1998 08/30/1998 03/08/2003 06/05/2002 04/07/2000 Corrected 04/17/2002 Page TRM / 3.10-8 3.11 3.12 4.0 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM / 3.11-22 through TRM / 3.11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 09/01/1998 08/31/1998 04/02/2002 09/01/1998 08/31/1998 02/05/1999 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 B 3.1 B 3.2 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM I B 3.0-11 through TRM I B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM I B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM I B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 03/15/2002 07/1311999 08/31/1998 07/13/1999 02/18/1999 08/31/1998 I

B 3.3 B 3.4 B 3.5 INSTRUMENTATION BASES Page TRMIB 3.3-1 Page B 3.3-2 Pages TRM/B 3.3-3 and TRM / B 3.3-3A Pages TRM I B 3.3-4 through TRM / B 3.3-6 Pages TRM I B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page B 3.3-15 Page TRM/B 3.3-16 Pages B 3.3-17 through B 3.3-20 Pages TRM / B 3.3-21 through TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 04/07/2000 08/31/1998 12/29/2000 03/21/2003 03/30/2001 08/31/1998 06/2512002 06/14/2002 06/14/2002 08/31/1998 04/07/2000 08/31/1998 04/02/1999 08/31/1998 10/15/1999 08/31/1998 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM / B 3.6-11 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002 12/31/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-1 Oa Pages TRM / B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 through TRM/B 3.7-21a Pages TRM/B.3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30

- Pages TRM / B 3.7-31 and TRM I B 3.7-32 Page TRM / B 3.7-33 Pages TRM I B 3.7-34 and TRM I B 3.7-35 B 3.8 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM I B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-17 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 08/31/1998 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 02/01/1999 08/31/1998 05/11/2001 04/07/2000 08/31/1998 03/09/2001 04/15/2003 07/05/2000 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 10/23/1998 08131/1998 03108/2003 08/23/1999 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRM/B 3.11 -11 and TRM/B 3.11 -1 I a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM I B 3.11-20 08/31/1998 02/01/1999 04/07/2000 02/01/1999 11/01/1999 02/01/1999 08/31/1998 04/02/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Page TRM I B 3.11-20a Pages TRM I B 3.11-21 through TRM / B 3.11-23 Page TRM / B 3.11-23a Page TRM I B 3.11-24 Page TRM I B 3.11-25 Pages B 3.11-26 through B 3.11-35 Pages TRM I B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 Effective Date 04/0212002 04/02/2002 04/02/2002 0312112003 04/15/2003 08131/1998 02/12/1999 02/05/1999 (Lic DocsITRM-WordlTRMManuaV0 00ListsfUnd 21U2TRM-LOES doc)

SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 USE AND APPLICATION............................................

1.0-1 1.1 Definitions............................................

TRM/1.0-2 2.0 PLANT PROGRAMS............................................

2.0-1 2.1 Plant Programs............................................

2.0-1 2.2 Instrument Trip Setpoint Table....................................

........ TRM/2.0-5 3.0 APPLICABILITY............................................

TRM/3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability.....................

.......... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability.................................. TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS............................................

3.1-1 3.1.1 Alternate Rod Injection............................................

3.1-1 3.1.2 CRD Housing Support............................................

3.1-4 3.1.3 Control Rod Block Instrumentation............................................

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve............................................

TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT............................................

3.2-1 3.2.1 Core Operating Limits Report............................................

3.2-1 3.3 INSTRUMENTATION............................................

TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation........................................... TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation............................................ TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation............................................ 3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation............................ TRM/3.3-9 3.3.5 Section Not Used............................................

TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation................................. TRM/3.3-13 3.3.7 Turbine Overspeed Protection System......................................... TRM/3.3-17 3.3.8 TRM Reactor Protection System (RPS) Instrumentation..........

.... TRM/3.3-19 3.3.9 LPRM Upscale Alarm Instrumentation............................................

3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops.........................................

3.3-22 3.3.11 MVP Isolation Instrumentation.........................................

TRM/3.3-23 3.4 REACTOR COOLANT SYSTEM......................................... 3.4-1 3.4.1 Reactor Coolant System Chemistry..........................................

3.4-1 3.4.2 Structural Integrity.........................................

3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors.................................... 3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit...................................... 3.4-12 3.4.5 Reactor Vessel Material Surveillances Program.................................... 3.4-13 3.5 EMERGENCY CORE COOLING AND RCIC..........................................

3.5-1 3.5.1 ADS Manual Inhibit..........................................

3.5-1

-3.5.2 ECCS and RCIC System Monitoring Instrumentation...................

......... 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS.........................................

3.5-6 SUSQUEHANNA - UNIT 2 i

EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.6 CONTAINMENT.......................................

3.6-1 3.6.1 VENTING or PURGING.......................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.......................................

3.6-3 3.6.3 Suppression Pool Alarm Instrumentation.......................................

3.6-4 3.6.4 Primary Containment Closed System Boundaries........................ TRM/3.6-7 3.7 PLANT SYSTEMS.............................................................................. TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level....................................... 3.7-3 3.7.3.1 Fire Suppression Water Supply System....................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................

TRM/3.7-8 3.7.3.3 C02 systems................................................................................ TRM/3.7-12 3.7.3.4 Halon Systems.......................................

TRM/3.7-16 3.7.3.5 Fire Hose Stations.......................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies.......................................

TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation.......................................

TRM/3.7-26 3.7.4 Solid Radwaste System.......................................

TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor.......................................

3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture....................................... 3.7-39 3.7.5.3 Liquid Holdup Tanks.......................................

TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation............

........................... 3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation............................

3.7-42 3.7.8 Snubbers............................

3.7-44 3.7.9 Control Structure HVAC............................

TRM/3.7-50 3.7.10 Spent Fuel Storage Pools (SFSPs)...........

................. TRM/3.7-51 3.8 ELECTRICAL POWER....................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices......

TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous......

TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Automatic....................................

TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintanence Activities.................................... 3.8-13 3.8.4 24VDC Electrical Power Subsystem.................................... TRM/3.8-15 3.8.5 Degraded Voltage Protection....................................

TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling..................

.................. 3.8-24 3.9 REFUELING OPERATIONS....................................

3.9-1 3.9.1 Decay Time....................................

3.9-1 3.9.2 Communications....................................

3.9-2 3.9.3 Refueling Platform....................................

3.9-3 SUSQUEHANNA - UNIT 2 ii EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.10 MISCELLANEOUS...........................................

3.10-1 3.10.1 Sealed Source Contamination...........................................

3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation........................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).................... TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM)...........................................

TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS...........................................

3.11-1 3.11.1 Liquid Effluents...........................................

3.11-1 3.11.1.1 Liquid Effluents Concentration...........................................

3.11-1 3.11.1.2 Liquid Effluents Dose...........................................

3.11-4 3.11.1.3 Liquid Waste Treatment System...........................................

3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation......................... 3.11-13 3.11.2 Gaseous Effluents.............

3.11-17 3.11.2.1 Dose Rate.............

3.11-17 3.11.2.2 Dose - Noble Gases.............

3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form............................

3.11-21 3.11.2.4 Gaseous Radwaste Treatment System................

............ TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System...............

............. TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation...............................

3.11-26 3.11.3 Total Dose...............................

3.11-33 3.11.4 Radiological Environmental Monitoring...............................

3.11-35 3.11.4.1 Monitoring Program................................

3.11-35 3.11.4.2 Land Use Census................................

3.11-45 3.11.4.3 Interlaboratory Comparison Program...............................

3.11-47 3.12 LOADS CONTROL PROGRAM...............................

TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool...............................

TRM/3.12-1 3.12.2 Heavy Loads Requirements................................

TRM/3.12.3 3.12.3 Light Loads Requirements................................

TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS...............................

4.0-1 4.1 Organization...............................

4.0-1 4.2 Reportable Event Action................................

4.0-2 4.3 Safety Limit Violation...............................

4.0-3 4.4 Procedures and Programs...............................

4.0-4 4.5 Reporting Requirements................................

4.0-5 4.6 Radiation Protection Program...............................

4.0-7 4.7 Training....

4.0-8 SUSQUEHANNA - UNIT 2 iii EFFECTIVE DATE 04/15/2003 SUSQUEHANNA - UNIT 2 iii EFFECTIVE DATE 0411512003

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability....................................... B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.......................................... B 3.0-9 B 3.1.1 Alternate Rod Injection............................................ TRM/B 3.1-1 B 3.1.2 CRD Housing Support..........................................

B 3.1-4 B 3.1.3 Control Rod Block Instrumentation..........................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve............................................ TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR)..........................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation.......................................... TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation..........................................

B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation.................................. TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation........................... TRM/B 3.3-4 B 3.3.5 Section Not Used..........................................

TRM/B 3.3-7 B 3.3.6 TRM Containment Isolation Instrumentation......................................... B 3.3-10 B 3.3.7 Turbine Overspeed Protection System........................................ TRM/B 3.3-14 B 3.3.8 TRM Reactor Protection System (RPS) Instrumentation...................... B 3.3-15 B 3.3.9 LPRM Upscale Alarm Instrumentation..........................................

B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops.......................................

B 3.3-19 B 3.3.11 MVP Isolation Instrumentation.......................................

TRM/B 3.3-21 B 3.4.1 Reactor Coolant System Chemistry.......................................

B 3.4-1 B 3.4.2 Structural Integrity.......................................

B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors................................... B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit............................ TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program................................... B 3.4-6 B 3.5.1 ADS Manual Inhibit.......................................

B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation........................... B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS.......................................

B 3.5-4 B 3.6.1 VENTING or PURGING.......................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.....................................

B 3.6-3 B 3.6.3 Suppression Pool Alarm Instrumentation.

.................................... B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown).................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level....................................... B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System...................................... TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems.....................................

TRM/B 3.7-5 B 3.7.3.3 C02 systems............

TRM/B 3.7-7 B 3.7.3.4 Halon Systems..............

TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations............

TRM/B 3.7-10 SUSQUEHANNA -UNIT 2 iv EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION B 3.7.3.6 B 3.7.3.7 B 3.7.3.8 B 3.7.4 B 3.7.5.1 B 3.7.5.2 B 3.7.5.3 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.1 0 B 3.8.1 B 3.8.2.1 B 3.8.2.2 B 3.8.3 B 3.8.4 B 3.8.5 B 3.8.6 B.3.9. 1 B 3.9.2 B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.10.4 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 TITLE PAGE Yard Fire Hydrants and Hydrant Hose Houses............................ TRM/B 3.7-11 Fire Rated Assemblies............................................

TRMIB 3.7-12 Fire Detection Instrumentation............................................

TRM/B 3.7-14 Solid Radwaste System............................................

TRM/B 3.7-15 Main Condenser Offgas Hydrogen Monitor........................................... B 3.7-17 Main Condenser Explosive Gas Mixture.............................................. B 3.7-19 Liquid Holdup Tanks............................................

B 3.7-20 ESSW Pumphouse Ventilation..

............................................ TRM/B 3.7-21 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation............................................

TRM/B 3.7-22 Snubbers............................................

B 3.7-24 Control Structure HVAC............................................

TRM/B 3.7-31 Spent Fuel Storage Pools............................................

TRM/B 3.7-33 Primary Containment Penetration Conductor Overcurrent Protective Devices............................................

TRM/B 3.8-1 Motor Operated Valves Thermal Overload Protection -

Continuous.............................................

TRMI/B 3.8-3 Motor Operated Valves Thermal Overload Protection -

Automatic............................................

TRM/B 3.8-4 Diesel Generator (DG) Maintanence Activities............................. TRM/B 3.8-5 24VDC Electrical Power Subsystem............................................ TRM/B 3.8-6 Degraded Voltage Protection............................................

TRM/B 3.8-16 Emergency Switchgear Room Cooling........................................ TRM/B 3.8-17 Decay Time..............................................

B 3.9-1 Communications............................................

B 3.9-2 Refueling Platform............................................

B 3.9-3 Sealed Source Contamination............................................

B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation.......................... B 3.10-2 Independent Spent Fuel Storage Installation (ISFSI)................... TRMIB 3.10-4 Leading Edge Flow Meter (LEFM).............................................. TRMI/B 3.10-6 Liquid Effluents Concentration............................................

B 3.11-1 Liquid Effluents Dose............................................

B 3.11-4 Liquid Waste Treatment System............................................

B 3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation........................... B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation............... TRMlB 3.11-10 Dose Rate..............................................

TRM/B 3.11-12 Dose - Noble Gases.............................................. B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form..............................................

B 3.11-18 Gaseous Radwaste Treatment System....................................... TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................ TRMI/B 3.11-21 SUSQUEHANNA

- UNIT 2 v

EFFECTIVE DATE 04/15/2003 SUSQUEHANNA - UNIT 2 v

EFFECTIVE DATE 04/15/2003

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Radioactive Gaseous Effluent Monitoring Instrumentation..............................

B 3.11-24 Total Dose................................

B 3.11-26 Monitoring Program...............................

B 3.11-28 Land Use Census...............................

B 3.11-34 Interlaboratory Comparison Program.............................

TRM/B 3.11-36 LOADS CONTROL PROGRAM.............................

TRM/B 3.12-1 Crane Travel - Spent Fuel Storage Pool...

............................. TRM/B 3.12-1 Heavy Loads Requirements.............................

TRM/B 3.12-2 Light Loads Requirements..............................

TRM/B 3.12-3 (Lic DocsrTRM-WordrRM Manual/Y 00LIstsfUnrt2JU2TRM-TOC doc)

SUSQUEHANNA - UNIT 2 vi EFFECTIVE DATE 04115/2003

Spent Fuel Storage Pools (SFSPs) 3.7.10 3.7 Plant Systems 3.7.10 Spent Fuel Storage Pools (SFSPs)

TRO 3.7.10 The following conditions shall be met when the Unit 1 and Unit 2 SFSPs are not cross-connected through the Cask Storage Pit.

a.

The Unit 2 SFSP water temperature is less than or equal to 115 OF.

b.

Both subsystems of the ESW system must have at least one pump and the respective flow path to the Spent Fuel Storage Pool OPERABLE.

c.

One RHR Fuel Pool Cooling subsystem must be OPERABLE. (Cannot be the same set of equipment used to meet item d.)

d.

RHR must have one subsystem of Suppression Pool Cooling OPERABLE. (Cannot be the same set of equipment used to meet item c.)

e.

Zone II is capable of being aligned to the Recirculation Plenum.

I APPLICABILITY:

MODES 1, 2, 3, and 4 when the analyzed nominal decay heat in one SFSP is

  • 5.1 x 106 BTU/hr concurrent with the analyzed nominal decay heat in the other SFSP < 3.1 x 106 BTU/hr.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Fuel pool water A.1 Restore the temperature 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> temperature > 115 OF.

< 115 "F.

B. Less than two subsystems B.1 Restore two subsystems of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of ESW with at least one ESW with at least one pump pump or the respective flow and the respective flow path path to the Spent Fuel to the Spent Fuel Storage Storage Pool OPERABLE.

Pool to OPERABLE status.

C. No RHR Fuel Pool Cooling C.1 Restore one subsystem to 7 days subsystem's OPERABLE.

OPERABLE status.

(continued)

SUSQUEHANNA - UNIT 2 TRM / 3.7-51 EFFECTIVE DATE 04/15/2003

Spent Fuel Storage Pools (SFSPs) 3.7.10 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D.

No RHR Suppression D.1 Restore one subsystem 7 days Pool Cooling to OPERABLE status.

subsystem's OPERABLE.

E.

Zone II not capable of E.1 Restore alignment 7 days being aligned to the capability.

Recirculation plenum.

F.

Required Actions and F.1 Initiate actions to cross-Immediately associated Completion connect the Unit 1 and Times not met.

Unit 2 Spent Fuel Storage Pools through the Cask Storage Pit.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.10.1 Verify the fuel pool temperature is less than or equal 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 115 OF.

TRS 3.7.10.2 Verify both subsystems of ESW have at least one Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pump and the respective flow path to the Spent Fuel after the SFSP is Storage Pool OPERABLE.

isolated from the Cask Storage Pit AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter TRS 3.7.10.3 Verify that an RHR Fuel Pool Cooling subsystem is Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE.

after the SFSP is isolated from the Cask Storage Pit AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.7-52 EFFECTIVE DATE 04/15/20003

Spent Fuel Storage Pools B 3.7.10 B 3.7.10 _ Spent Fuel Storage Pools BASES TRO The design and licensing basis of SSES assumes that the Unit 1 and Unit 2 Spent Fuel Storage Pools (SFSP) are cross-connected through the Cask Storage Pit. This allows either Unit's Fuel Pool Cooling system and RHR Fuel Pool Cooling subsystem to provide cooling to the spent fuel stored in both units SFSP. In addition, cross-connected SFSP's allow make up water to be added to either unit's SFSP. If the SFSP are not cross-connected through the Cask Storage Pit, certain conditions must be maintained to assure the fuel pools remain within analyzed conditions. This TRO defines the required conditions and the actions required should the conditions not be met. The conditions applicable to SFSP's that are not cross-connected are:

a.

The Unit 2 SFSP water temperature is less than or equal to 115 IF. The Fuel Pool Cooling system analyses assume the fuel pool temperature is less than or equal to 115 OF. Normally, the Fuel Pool Cooling system is used to maintain the fuel pool temperature less than or equal to 115 IF.

b.

Both subsystems of the ESW system must have at least one pump and the respective flow path to the SFSP to be considered OPERABLE for the ESW system fuel pool supply function. The ESW system provides the only safety-related source of make-up water to the SFSP.

c.

The RHR Fuel Pool Cooling subsystem provides a safety-related source of cooling to the SFSP. The RHR Fuel Pool Cooling subsystem is considered OPERABLE when one of the pumps, one of the heat exchangers, associated piping, valves, instrumentation and controls are OPERABLE. Note that this cannot be the same set of equipment (pump, heat exchanger, piping, valves etc.) credited for an OPERABLE RHR Suppression Pool Cooling subsystem.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.7-33 EFFECTIVE DATE 04/15/2003

N I-Radioactive Gaseous Effluent Monitoring Instrumentation B 3.11.2.6 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES (continued)

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.

The TRSs shall be performed in accordance with the Technical Specification definition for the test with the following additional requirements:

The CHANNEL FUNCTIONAL TEST for all noble gas activity monitors, Iodine Monitors, and Particulate Monitors shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:

1. Instrument indicates measured levels above the alarm/trip setpoint,
2. Circuit failure, and
3. Instrument indicates a downscale failure.

The initial CHANNEL CALIBRATION for all noble gas activity monitors, Iodine Monitors, and Particulate Monitors shall be performed using one or more of the reference standards certified by the National Institute of Standards and Technology (NIST) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration may be used in lieu of reference standards associated with the initial calibration.

Particulate or iodine sampling required to be in continuous service will be considered to remain and have been in continuous service when its service is interrupted for a period of time not to exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per sampling period.

For particulate and iodine sampling, this is a small fraction of the normal minimum analysis frequency.

REFERENCES

1. Technical Specification 5.5.4 - Radioactive Effluent Controls program.
2. Technical Specification 5.5.1 - Offsite Dose Calculation Manual.
3. 10 CFR Part 20.
4. 10 CFR Part 50.

SUSQUEHANNA - UNIT 2 TRM / B 3.11-25 EFFECTIVE DATE 04/15/2003