Jul. 18, 2002 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION/
DOCUMENT TRANSMITTAL 2002-344 8 USER INFORMATION:
Nacrk. FLAIM*LAU*' CA#:0386 EMPL#:23244 Addrt.-. NUCSA2 Phone#: 254-3658 TRANSMITTAL INFORMATION:
TO. FLAIlU B 07/18/2002 L*CT!ON: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
ITSB2 - IMPROVED TECHNICAL SPECIFICATIONS BASES MANUALS UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/17/2002 ADD MANUAL TABLE OF CONTENTS DATE: 07/17/2002 CATEGORY: DOCUMENTS TYPE: ITSB2 ID: ITSB2 REMOVE: REV:31 ADD: REV: 32 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
TSB APPROVED AMENDMENT TO THE UNIT 2 TECHNICAL SPECIFICATIONS BASES MANUAL REVISION 32 Replace the following pages of the Technical Specifications Bases Manual with the enclosed pages. The revised pages are identified by Revision Number and contain vertical lines indicating the area of change.
REMOVE PAGES REV. # INSERT PAGES REV. #
TSB / LOES 31 TSB/LOES 32 TS / B 3.7-14 through TS / B 3.7-18 1 TS / B 3.7-14 through TS / B 3.7-18 2 N/A -- TS / B 3.7-18a 0 G:\LIC DOCS\FORMS\REMINSLIST3302-TSB. DOC
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 2.0 SAFETY LIMITS BASES Page B 2.0-1 1 Pages TS/ /BB2.0-5 Page TS 2.0-2 through TS / B 2.0-4 2 1V77Tj Pages B 2.0-6 through B 2.0-8 B 3.0 LCO AND SR APPLICABILITY BASES Pages B 3.0-1 through B 3.0-15 0 B 3.1 REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-51 0 B 3.2 POWER DISTRIBUTION LIMITS BASES Pages B 3.2-1 through B 3.2-4 1 Pages TS / B 3.2-5 and TS / B 3.2-6 2 Pages B 3.2-7 and B 3.2-8 1 Page TS / B 3.2-9 2 Pages B 3.2-10 through B 3.2-19 1 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS / B 3.3-10 1 Page TS / B 3.3-11 2 Pages TS / B 3.3-12 through TS / B 3.3-27 1 Pages TS / B 3.3-28 through TS / B 3.3-30 2 Page TS / B 3.3-31 1 Pages TS / B 3.3-32 and TS / B 3.3-33 2 Pages TS / B 3.3-34 through TS / B 3.3-54 1 Pages B 3.3-55 through B 3.3-63 0 Pages TS / B 3.3-64 and TS / B 3.3-65 2 Page TS / B 3.3-66 3 Page TS / B 3.3-67 _ 2 Page TS / B 3.3-68 3 Pages TS / 3.3-69 through TS / B 3.3-75 2 Page TS / B 3.3-75a 4 Pages TS / B 3.3-75b through TS / B 3.3-75c 3 Pages B 3.3-76 through B 3.3-100 0 Pages TS / B 3.3-101 through TS / B 3.3-106 1 Page TS / B 3.3-107 2 Pages TS / B 3.3-108 through TS / B 3.3-115 1 Pages TS / B 3.3-116 2 Pages TS / B 3.3-117 through TS / B 3.3-123 1 Page TS / B 3.3-124 2 Page TS / B 3.3-124a 0 SUSQUEHANNA -UNIT 2 TS / B LOES-1 Revision 32
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.3-125 through TS / B 3.3-131 1 Page TS / B 3.3-132 2 Pages TS / B 3.3-133 and TS / B 3.3-134 1 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-162 0 Page TS /B 3.3-163 1 Pages B 3.3-164 through B 3.3-177 0 Pages B 3.3-178 and B 3.3-179 1 Page B 3.3-179a 0 Pages TS / B 3.3-180 through TS / B 3.3-191 1 Pages B 3.3-192 through B 3.3-220 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-9 1 Pages B 3.4-10 through B 3.4-14 0 Pages TS / B 3.4-15 1 Pages TS / B 3.4-16 and TS / B 3.4-17 2 Pages TS / B 3.4-18 1 Pages B 3.4-19 through B 3.4-28 0 Page TS / B 3.4-29 1 Pages B 3.3-30 through B 3.3-48 0 Page TS / B 3.4-49 1 Page B 3.4-50 0 Page TS / B 3.4-51 1 Pages B 3.4-52 and B 3.4-53 0 Pages TS / B 3.4-54 and TS / B 3.4-55 1 Pages B 3.4-56 and B 3.4-57 0 Page TS / B 3.4-58 1 B 3.5 ECCS AND RCIC BASES Pages TS / B 3.5-1 and TS / B 3.5-2 1 Page TS / B 3.5-3 1 Pages TS / B 3.5-4 through TS / B 3.5-14 1 Pages TS / B 3.5-15 through TS / B.3.5-17 2 Page TS / B 3.18 1 Pages B 3.5-19 through B 3.5-24 0 Page TS / B 3.5-25 1 Pages B 3.5-26 through B 3.5-31 0
/ B LOES-2 Revision 32 SUSQUEHANNA SUSQUEHANNA -UNIT UNIT 22 TS TS / B LOES-2 Revision 32
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.6 CONTAINMENT SYSTEMS BASES Pages TS / B 3.6-1 2 Page TS / B 3.6-1a 3 Pages TS / B 3.6-2 through TS / B 3.6-5 2 Page TS / B 3.6-6 3 Pages TS / B 3.6-6a and TS / B 3.6-6b 2 Page TS / B 3.6-6c 0 Pages B 3.6-7 through B 3.6-14 0 Page TS / B 3.6-15 3 Pages TS / B 3.6-15a and TS / B 3.6-15b 0 Page TS / B 3.6-16 1 Page TS / B 3.6-17 2 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 through TS / B 3.6-19 1 Page TS / B 3.6-20 2 Page TS / B 3.6-21 3 Pages TS / B 3.6-21a and TS / B 3.6-21b 0 Pages TS / B 3.6-22 and TS / B 3.6-23 2 Pages TS / B 3.6-24 through TS / B 3.6-26 1 Page TS / B 3.6-27 3 Page TS / B 3.6-28 5 Page TS / B 3.6-29 2 Page TS / B 3.6-29a 0 Page TS / B 3.6-30 2 Page TS / B 3.6-31 3 Pages TS / B 3.6-32 through TS / B 3.6-34 1 Pages TS / B 3.6-35 through TS / B 3.6-37 2 Page TS / B 3.6-38 1 Page TS / B 3.6-39 3 Pages B 3.6-40 through B 3.6-42 0 Pages TS / B 3.6-43 through TS / B 3.6-50 1 Page TS / B 3.6-51 2 Pages B 3.6-52 through B 3.6-82 0 Pages TS / B 3.6-83 through TS / B 3.6-87 1 Page TS / B 3.6-87a 1 Pages TS / B 3.6-88 through TS / B 3.6-99 1 Pages B 3.6-100 through B 3.6-106 0 B 3.7 PLANT SYSTEMS BASES Pages TS / B 3.7-1 through TS / B 3.7-6 1 Page TS / B 3.7-6a 1 Pages B 3.7-7 through B 3.7-11 0 Pages TS / B 3.7-12 and TS / B 3.7-13 1 SUSQUEHANNA -UNIT 2 TS / B LOES-3 Revision 32
SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.7-14 through TS / B 3.7-18 2 Page TS / B 3.7-18a 0 Pages B 3.7-19 through B 3.7-23 1 Pages B 3.7-24 through B 3.7-33 0 B 3.8 ELECTRICAL POWER SYSTEMS BASES Pages B 3.8-1 through B 3.8-4 0 Page TS/B 3.8-5 1 Pages B 3.8-6 through B 3.8-18 0 Page TS / B 3.8-19 1 Pages B 3.8-20 through B 3.8-22 0 Page B 3.8-23 1 Page B 3.8-24 0 Pages TS / B 3.8-25 and TS / B 3.8-26 1 Pages B 3.8-27 through B 3.8-37 0 Page TS / B 3.8-38 1 Page TS / B 3.8-39 through TS / B 3.8-55 0 Pages TS / B 3.8-56 through TS / B 3.8-64 1 Page TS / B 3.8-65 2 Page TS / B 3.8-66 2 Pages TS / B 3.8-67 through TS / B 3.8-68 1 Page TS / B 3.8-69 2 Pages B 3.8-70 through B 3.8-99 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-2 1 Page TS / B 3.9-2a 1 Pages TS / B 3.9-3 and TS / B 3.9-4 1 Pages B 3.9-5 through B 3.9-30 0 B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 1 Pages B 3.10-2 through B 3.10-39 0 SUSQUEHANNA - UNIT 2 TS / B LOES-4 Revision 32
CREOAS System B 3.7.3 BASES LCO One subsystem is considered OPERABLE when:
(continued)
- a. One filter train consisting of a CREOAS fan, heater, a HEPA filter, and charcoal adsorber which is not excessively restricting flow is OPERABLE; and
- b. The 'A' Control Structure Heating and Ventilationfan (OV103A) and the 'A' Computer Room Floor Cooling fan (0V1I15A) and the 'A' Control Room Floor Cooling fan (0V1I17A) are OPERABLE OR The 'B' Control Structure Heating and Ventilation fan (DVI03B) and the 'B' Computer Room Floor Cooling fan (OV1 15B) and the 'B' Control Room Floor Cooling fan (OV1 17B) are OPERABLE (These fans are not dedicated to either CREOAS subsystem. As a result when any one set of fans is not OPERABLE, one arbitrarily determined CREOAS subsystem is not OPERABLE); and
- d. Neither Smoke Removal Fan (OV104NB) is in operation.
In addition, the habitability envelope must be maintained, including the integrity of the walls, floors, ceilings, ductwork, andaccess doors to maintain a positive pressure. Note the habitability envelope can not be maintained with a smoke removal fan (0VI 04A or 0VI 04B) in operation.
The LCO is modified by a Note allowing the control room habitability envelope boundary to be opened intermittently under administrative controls. For entry and exit through doors the administrative control of the opening is performed by the person(s) entering or exiting the area. For other openings, these controls consist of stationing a dedicated individual at the opening who is in continuous communication with the control room.
This individual will have a method to rapidly close the opening when a need for control room habitability envelope isolation is indicated.
APPLICABILITY In MODES 1, 2, and 3, the CREOAS System must be OPERABLE to control operator exposure during and following a DBA, since the DBA could lead to a fission product release.
(continued)
SUSQUEHANNA - UNIT 2 TS / B 3.7-14 Revision 2
I CREOAS System B 3.7.3 BASES APPLICABILITY In MODES 4 and 5, the probability and consequences of a DBA are (continued) reduced because of the pressure and temperature limitations in these MODES. Therefore, maintaining the CREOAS System OPERABLE is not required in MODE 4 or 5, except for the following situations under which significant radioactive releases can be postulated:
- a. During operations with potential for draining the reactor vessel (OPDRVs);
- b. During CORE ALTERATIONS; and c During movement of irradiated fuel assemblies in the secondary containment ACTIONS A.1 With one CREOAS subsystem inoperable, the inoperable CREOAS subsystem must be restored to OPERABLE status within 7 days. With the unit in this condition, the remaining OPERABLE CREOAS subsystem is adequate to perform its radiation protection function. However, the overall reliability is reduced because a single failure in the OPERABLE subsystem could result in reduced CREOAS System capability. The 7 day Completion Time is based on the low probability of a DBA occurring during this time period, and that the remaining subsystem can provide the required capabilities.
B.1 If the control room habitability envelope boundary is inoperable in MODES 1,2, and 3, the CREOAS trains cannot perform their intended functions.
Actions must be taken to restore an OPERABLE control room habitability envelope boundary within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During the period that the control room habitability envelope boundary is inoperable, appropriate compensatory measures (consistent with the intent of GDC 19) should be utilized to protect control room operators from potential hazards such as radioactive contamination, toxic chemicals, smoke, temperature and relative humidity, and physical security. Preplanned measures should be available to address these concems for intentional and unintentional entry into the Condition. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is reasonable based on the low probability of a DBA occurring during this time period, and the use of compensatory measures. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time-is a typically reasonable time to diagnose, plan and possibly repair, and test most problems with the control room habitability envelope boundary.
(continued)
SUSQUEHANNA - UNIT 2 TS / B 3.7-15 Revision 2
CREOAS System B 3.7.3 BASES ACTIONS C.1 and C.2 (continued)
In MODE 1, 2, or 3, if the inoperable CREOAS subsystem or control room habitability envelope boundary cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE that minimizes risk. To achieve this status, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
D.1, D.2.1. D.2.2, and D.2.3 The Required Actions of Condition D are modified by a Note indicating that LCO 3.0.3 does not apply. Ifmoving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require either an entry into LCO 3.0.3 or a reactor shutdown in accordance with LCO 3.0.3.
During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if the inoperable CREOAS subsystem cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CREOAS subsystem may be placed in the pressurization/filtration mode. This action ensures that the remaining subsystem is OPERABLE, that no failures that would prevent automatic actuation willoccur, and that any active failure will be readily detected.
An alternative to Required Action D.1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes risk.
If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, actions must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and the subsequent potential for fission product release. Actions must continue until the OPDRVs are suspended.
(continued)
SUSQUEHANNA-UNIT2 TS / B 3.7-16 Revision 2
I CREOAS System B 3.7.3 BASES ACTIONS E.1 (continued)
If both CREOAS subsystems are inoperable in MODE 1, 2, or 3, for reasons other than an inoperable control room habitability envelope boundary (i. e., Condition B) the CREOAS System may not be capable of performing the intended function and the unit is in a condition outside the accident analyses. Therefore, LCO 3.0.3 must be entered immediately.
F.1, F.2, and F.3 The Required Actions of Condition F are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require either an entry into LCO 3.0.3 or a reactor shutdown in accordance with LCO 3.0.3.
During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, with two CREOAS subsystems inoperable, action must be taken immediately to suspend activities that present a potential for releasing radioactivity that might require pressurization of the habitability envelope. This places the unit in a condition that minimizes risk.
If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. If applicable, actions must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Actions must continue until the OPDRVs are suspended.
SURVEILLANCE SR 3.7.3.1 REQUIREMENTS This SR verifies that a CREOAS fan in a standby mode starts on demand from the control room and continues to operate with flow through the HEPA filters and charcoal adsorbers. Standby systems should be checked periodically to ensure that they start and function properly. As the environmental and normal operating conditions of this system are not severe, testing each subsystem once every month provides an adequate check on this system. Monthly heater operation dries out any moisture (continued)
SUSQUEHANNA - UNIT 2 TS / B 3.7-17 Revision 2
CREOAS System B 3.7.3 BASES that has accumulated in the charcoal as a result of humidity in the ambient air. Systems with heaters must be operated for > 10 continuous hours with the heaters energized. Furthermore, the 31 day Frequency is based on the known reliability of the equipment and the availability of two redundant subsystems.
SR 3.7.3.2 This SR verifies that the required CREOAS testing is performed in accordance with the Ventilation Filter Testing Program (VFTP). The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations).
Specific test frequencies and additional information are discussed in detail in the VFTP.
SR 3.7.3.3 This SR verifies that on an actual or simulated initiation signal, each CREOAS subsystem starts and operates. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.7.1.5 overlaps this SR to provide complete testing of the safety function. The 24 month Frequency is consistent with industry practice and other filtration systems SRs.
SR 3.7.3.4 This SR verifies the integrity of the habitability envelope and the assumed inleakage rates of potentially contaminated air. The habitability envelope positive pressure, with respect to potentially contaminated adjacent areas (the turbine building), is periodically tested to verify proper function of the CREOAS System and the integrity of the habitability envelope. During the emergency mode of operation, the CREOAS System is designed to slightly pressurize the control structure 2.0.125 inches water gauge positive pressure with respect to the outside atmosphere to prevent unfiltered inleakage. The CREOAS System is designed to maintain this positive pressure at a flow rate of < 5810 cfm to the control structure in the pressurization/filtration mode. The control structure habitability envelope is maintained when the control structure habitability envelope can be pressurized to Ž 0.125 inches water gauge positive pressure with respect to outside atmosphere. The Frequency of 24 months on a STAGGERED TEST BASIS is consistent with industry practice and other filtration systems SRs.
(continued)
SUSQUEHANNA - UNIT 2 TS / B 3.7-18 Revision 2
CREOAS System B 3.7.3 BASES REFERENCES 1. FSAR, Chapter 6.
- 2. FSAR, Chapter 9.
- 3. FSAR, Chapter 15.
- 4. Final Policy Statement on Technical Specifications Improvements, July 22,1993 (58 FR 39132).
SUSQUEHANNA-UNIT2 TS / B 3.7-18a Revision 0