Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML18044A19531 October 1979Cycle 4,Startup Physics Test Program.
ML18044A3746 December 1979Const Specs for Outside Containment Portion of Pressurizer Relief Valve Position Indication Sys
ML18044A37613 November 1979Const Specs for Inside Containment Portion of Pressurizer Relief Valve Position Indication Sys
ML18044A38012 November 1979Installation & Checkout Procedures C-010-00 for Valve Monitoring Sys.
ML18044A53611 February 1980Rept on Insp & Testing Program for Concrete Expansion Anchors Per IE Bulletin 79-02 & Revisions for CPC Facility in South Haven,Mi.
ML18044A58929 February 1980Facility Steam Generator Repair Rept, Revision 5Safe Shutdown
Boric Acid
Operating Basis Earthquake
Finite Element Analysis
Earthquake
Scaffolding
ML18044A75811 April 1980Feedwater Line Water Hammer Test.
ML18044A96014 May 1980Emergency Procedure,Card 8,for Plant Health Physicist, Revision 5
ML18044A96129 April 1980Determination of Extent of Core Damage.
ML18044A96226 April 1980Emergency High Range Effluents Monitor.
ML18044A96329 April 1980In-plant Airborne Iodine Monitoring & Thyroid Blocking Agent Administration Under Accident Conditions.
ML18044A96424 April 1980Sampling & Analysis of High Activity Reactor Coolant.
ML18044A96530 April 1980Sampling & Analysis of High Activity Containment Atmosphere.
ML18044A96621 April 1980Offsite Accident TLD Procedure.
ML18044A96730 April 1980Offsite Airborne Iodine Monitoring Under Accident Conditions.
ML18045A48031 July 1980Cpco Hot License Program-Reactor Operator.Shutdown Margin
ML18045A83931 October 1980Emergency Operating Procedures 1-12
ML18046B01215 May 1980Operation Procedure 0540-001-02 Revision 1, Palisades Nuclear Station-High Energy Line Break Evaluation Phase III, Procedures for Determining Jet Impingement Forces & Pipe Whip Energies.
ML18046B0136 June 1980Operation Procedure 0540-001-03,Revision 2, Palisades Nuclear Station-High Energy Line Break Evaluation Phase III, Procedures for Evaluating Structural Response of Piping Targets to Pipe Rupture Loadings.
ML18046B08124 June 1981Surveillance Procedure for Containment Bldg Post-Tensioning Sys.
ML18046B08317 November 1981Procedure for Lab Testing of Sheathing Filler.
ML18046B14024 February 1981Public Version of Site Emergency Plan Implementing Procedures,Including Procedures EI-1 Re Activation of Emergency plan,EI-2 Re Notifications During Emergency & EI-3 Re Notification of Hosps
ML18046B33023 February 1982Scenario,1982,Small-Scale Emergency Exercise.Fuel cladding
ML18046B33123 February 1982Second Draft Palisades Scenario 1982,Small-Scale Emergency Exercise.
ML18046B36816 March 1982Human Factors Review Program Plan.Emergency Lighting
ML18047A3243 May 1982Requalification Program - Reactor Operator & Senior Reactor Operator.Boric Acid
Shutdown Margin
Fuel cladding
Power change
ML18047A3354 September 1981Inservice Testing of Selected Safety-Related Pumps, Revision 5Boric Acid
ML18047A35131 May 1982EPRI PWR Safety & Relief Valve Test Program,Power Operated Relief Valve Block Valve Info Package.
ML18047A37626 May 1982Public Version of Revision 5 to Emergency Plan Implementation Procedure EI-2, Palisades Plant Actions/ Notifications During Emergency.
ML18047A3989 June 1982Public Version of Temporary Change EI-82-019,consisting of Revision 1 to Emergency Plan Implementing Procedure EI-15, Training & Drills. (Ref NUREG-0654)
ML18047A44531 December 1981EPRI PWR Safety & Relief Valve Test Program Valve Selection/Justification Rept, Interim ReptLoop seal
ML18047A46816 June 1982Public Version of Temporary Change EI-82-021 to Emergency Plan Implementing Procedure EI-14, Radiological Medical Care.
ML18047A50915 July 1982Revised Pages 14 & 15 to Inservice Testing of Plant Valves, Table I, Revision 10
ML18047A51115 July 1982Draft Revision 10 to Inservice Testing of Plant Valves.Boric Acid
Stroke time
Power-Operated Valves
Power Operated Valves
ML18047A63824 September 1982Public Version of Revision 4 to Emergency Plan Implementing Procedure,EI-3, Communications & Notification.
ML18051A38711 April 1983Integrated Program Plan for Suppl 1 to NUREG-0737.
ML18051A45819 May 1983Public Version of Rev 0 to Emergency Plan Implementing Procedure EI-7.5, Boron:Mannitol Titration Method Post-Accident. W/830520 Ltr & Receipt Form
ML18051A4617 June 1983Suppl 1 to NUREG-0737,Milestone Activities - Submittal of Updated Detailed Control Room Design Review Program Plan.
ML18051A46618 May 1983Public Version of Rev 0 to Emergency Plan Implementing Procedure EI-7.6, Quantitative Analysis of Chloride in Post-Accident Solution. W/830520 Ltr & Receipt Form
ML18051A4874 November 1982Public Version of Rev 3 to Emergency Plan Implementing Procedure EI-4.2, Operational Support Ctr Activation.
ML18051A54615 August 1983Rev 14 to Emergency Operating Procedure EOP 1, Reactor Trip.
ML18051A54715 August 1983Rev 14 to Emergency Operating Procedure EOP 6, Main Steam Line Break/Main Feedwater Line Break Inside Containment.Boric Acid
ML18051A54915 August 1983Rev 13 to Emergency Operating Procedure EOP 7, Main Steam Line Break/Main Feedwater Line Break Outside Containment.Boric Acid
ML18051A55015 August 1983Rev 15 to Emergency Operating Procedure EOP 8.1, Loca.Boric Acid
ML18051A55115 August 1983Rev 14 to Emergency Operating Procedure EOP 8.2, Steam Generator Tube Rupture.
ML18051A93524 April 1984Revised Site Emergency Implementing Procedures,Including EI-1 Re Activation of Site Emergency Plan/Emergency classification,EI-2 Re Emergency Actions/Notifications/ Responsibilities & EI-3 Re Communications & Notifications
ML18051B05511 July 1984Rev 0 to Emergency Plan Implementing Procedure EI-16.2, Post-Accident Sample Monitoring Sys Supplies & Associated Equipment Checks.
ML18051B3764 May 1985Rev 12 to Attachment 1 to Proceduree EI-2.1, Emergency/Actions/Notifications.
ML18051B39715 May 1985Rev to Administrative Procedure 10.45, Vendor Manual Control.
ML18051B4601 July 1985Rev 0 to Administrative Procedure 4.08, Post-Trip Review Requirements.Boric Acid