ML18044A195 | 31 October 1979 | Cycle 4,Startup Physics Test Program. | |
ML18044A374 | 6 December 1979 | Const Specs for Outside Containment Portion of Pressurizer Relief Valve Position Indication Sys | |
ML18044A376 | 13 November 1979 | Const Specs for Inside Containment Portion of Pressurizer Relief Valve Position Indication Sys | |
ML18044A380 | 12 November 1979 | Installation & Checkout Procedures C-010-00 for Valve Monitoring Sys. | |
ML18044A536 | 11 February 1980 | Rept on Insp & Testing Program for Concrete Expansion Anchors Per IE Bulletin 79-02 & Revisions for CPC Facility in South Haven,Mi. | |
ML18044A589 | 29 February 1980 | Facility Steam Generator Repair Rept, Revision 5 | Safe Shutdown Boric Acid Operating Basis Earthquake Finite Element Analysis Earthquake Scaffolding |
ML18044A758 | 11 April 1980 | Feedwater Line Water Hammer Test. | |
ML18044A960 | 14 May 1980 | Emergency Procedure,Card 8,for Plant Health Physicist, Revision 5 | |
ML18044A961 | 29 April 1980 | Determination of Extent of Core Damage. | |
ML18044A962 | 26 April 1980 | Emergency High Range Effluents Monitor. | |
ML18044A963 | 29 April 1980 | In-plant Airborne Iodine Monitoring & Thyroid Blocking Agent Administration Under Accident Conditions. | |
ML18044A964 | 24 April 1980 | Sampling & Analysis of High Activity Reactor Coolant. | |
ML18044A965 | 30 April 1980 | Sampling & Analysis of High Activity Containment Atmosphere. | |
ML18044A966 | 21 April 1980 | Offsite Accident TLD Procedure. | |
ML18044A967 | 30 April 1980 | Offsite Airborne Iodine Monitoring Under Accident Conditions. | |
ML18045A480 | 31 July 1980 | Cpco Hot License Program-Reactor Operator. | Shutdown Margin |
ML18045A839 | 31 October 1980 | Emergency Operating Procedures 1-12 | |
ML18046B012 | 15 May 1980 | Operation Procedure 0540-001-02 Revision 1, Palisades Nuclear Station-High Energy Line Break Evaluation Phase III, Procedures for Determining Jet Impingement Forces & Pipe Whip Energies. | |
ML18046B013 | 6 June 1980 | Operation Procedure 0540-001-03,Revision 2, Palisades Nuclear Station-High Energy Line Break Evaluation Phase III, Procedures for Evaluating Structural Response of Piping Targets to Pipe Rupture Loadings. | |
ML18046B081 | 24 June 1981 | Surveillance Procedure for Containment Bldg Post-Tensioning Sys. | |
ML18046B083 | 17 November 1981 | Procedure for Lab Testing of Sheathing Filler. | |
ML18046B140 | 24 February 1981 | Public Version of Site Emergency Plan Implementing Procedures,Including Procedures EI-1 Re Activation of Emergency plan,EI-2 Re Notifications During Emergency & EI-3 Re Notification of Hosps | |
ML18046B330 | 23 February 1982 | Scenario,1982,Small-Scale Emergency Exercise. | Fuel cladding |
ML18046B331 | 23 February 1982 | Second Draft Palisades Scenario 1982,Small-Scale Emergency Exercise. | |
ML18046B368 | 16 March 1982 | Human Factors Review Program Plan. | Emergency Lighting |
ML18047A324 | 3 May 1982 | Requalification Program - Reactor Operator & Senior Reactor Operator. | Boric Acid Shutdown Margin Fuel cladding Power change |
ML18047A335 | 4 September 1981 | Inservice Testing of Selected Safety-Related Pumps, Revision 5 | Boric Acid |
ML18047A351 | 31 May 1982 | EPRI PWR Safety & Relief Valve Test Program,Power Operated Relief Valve Block Valve Info Package. | |
ML18047A376 | 26 May 1982 | Public Version of Revision 5 to Emergency Plan Implementation Procedure EI-2, Palisades Plant Actions/ Notifications During Emergency. | |
ML18047A398 | 9 June 1982 | Public Version of Temporary Change EI-82-019,consisting of Revision 1 to Emergency Plan Implementing Procedure EI-15, Training & Drills. (Ref NUREG-0654) | |
ML18047A445 | 31 December 1981 | EPRI PWR Safety & Relief Valve Test Program Valve Selection/Justification Rept, Interim Rept | Loop seal |
ML18047A468 | 16 June 1982 | Public Version of Temporary Change EI-82-021 to Emergency Plan Implementing Procedure EI-14, Radiological Medical Care. | |
ML18047A509 | 15 July 1982 | Revised Pages 14 & 15 to Inservice Testing of Plant Valves, Table I, Revision 10 | |
ML18047A511 | 15 July 1982 | Draft Revision 10 to Inservice Testing of Plant Valves. | Boric Acid Stroke time Power-Operated Valves Power Operated Valves |
ML18047A638 | 24 September 1982 | Public Version of Revision 4 to Emergency Plan Implementing Procedure,EI-3, Communications & Notification. | |
ML18051A387 | 11 April 1983 | Integrated Program Plan for Suppl 1 to NUREG-0737. | |
ML18051A458 | 19 May 1983 | Public Version of Rev 0 to Emergency Plan Implementing Procedure EI-7.5, Boron:Mannitol Titration Method Post-Accident. W/830520 Ltr & Receipt Form | |
ML18051A461 | 7 June 1983 | Suppl 1 to NUREG-0737,Milestone Activities - Submittal of Updated Detailed Control Room Design Review Program Plan. | |
ML18051A466 | 18 May 1983 | Public Version of Rev 0 to Emergency Plan Implementing Procedure EI-7.6, Quantitative Analysis of Chloride in Post-Accident Solution. W/830520 Ltr & Receipt Form | |
ML18051A487 | 4 November 1982 | Public Version of Rev 3 to Emergency Plan Implementing Procedure EI-4.2, Operational Support Ctr Activation. | |
ML18051A546 | 15 August 1983 | Rev 14 to Emergency Operating Procedure EOP 1, Reactor Trip. | |
ML18051A547 | 15 August 1983 | Rev 14 to Emergency Operating Procedure EOP 6, Main Steam Line Break/Main Feedwater Line Break Inside Containment. | Boric Acid |
ML18051A549 | 15 August 1983 | Rev 13 to Emergency Operating Procedure EOP 7, Main Steam Line Break/Main Feedwater Line Break Outside Containment. | Boric Acid |
ML18051A550 | 15 August 1983 | Rev 15 to Emergency Operating Procedure EOP 8.1, Loca. | Boric Acid |
ML18051A551 | 15 August 1983 | Rev 14 to Emergency Operating Procedure EOP 8.2, Steam Generator Tube Rupture. | |
ML18051A935 | 24 April 1984 | Revised Site Emergency Implementing Procedures,Including EI-1 Re Activation of Site Emergency Plan/Emergency classification,EI-2 Re Emergency Actions/Notifications/ Responsibilities & EI-3 Re Communications & Notifications | |
ML18051B055 | 11 July 1984 | Rev 0 to Emergency Plan Implementing Procedure EI-16.2, Post-Accident Sample Monitoring Sys Supplies & Associated Equipment Checks. | |
ML18051B376 | 4 May 1985 | Rev 12 to Attachment 1 to Proceduree EI-2.1, Emergency/Actions/Notifications. | |
ML18051B397 | 15 May 1985 | Rev to Administrative Procedure 10.45, Vendor Manual Control. | |
ML18051B460 | 1 July 1985 | Rev 0 to Administrative Procedure 4.08, Post-Trip Review Requirements. | Boric Acid |