Emergency Procedure,Card 8,for Plant Health Physicist, Revision 5
ML18044A960
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/14/1980
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18044A959 List:
References
PROC-800514, NUDOCS 8006040313
Download: ML18044A960 (3)


Text

).

f.

~ '.

i PALISADES SITE EMERGENCY PROCEDURE card No. 8*

Car.d tfo ** 8 Page l of 3 Rev.. 5 5/14/80 Job Title - Plant Health Physics Superintendent/Plant Heaith Physicist Principal Position -

Emergency Team No. 11 Member Alternat~ Position - N6ne Responsibilities -

Insure the implementation of proper radiation protection measures during and after the incident.

Immediate Action:

1.

.2.

Report to Assembly Area II (Technical Support Center) and assist General Manager ~*Site Emergency Director as directed.

~-..

In the event the'.. Control Roorn rr..ust be evacua-:=ed, report to the designated alternate assembly area and.await further instructions.

3.

As conditions Jictate:

a.

...,.:.~.

Initiate: 2.

r=.-~ii:ior~ lliO~j.tc.ring regim:::rr in 2.!!d around the

.plant (on site).

b.

Dispatch designated emergency monitoring team to verify plume location as soon as wind direction has been determined

  • from the meteorolog~r data, Equipment to be used by emergency monitoring team is located in emergency response vehicle
  • (located in parking lot -

key in Rad Pro office).

INSTRUCT MONITORING TEAMS TO TAKE PORTABLE RADIO WITH THEM TO COHi:*illNICA.Tg

. WITH THE CONTROL ROCJH.

c.

Establish qff site rc.dia~io!!. dose ::-a~es _ a~:.d/ar:. \\.;a~er c.o~ta...ai nation levels.as applicable.

1.

Dose rates.in alr should be m'easurcd as close to the site boundary as practical in the do-:."'TI.wind direction.

The attached map indicates recommended monitoring point.

Monitoring should be initiated when stack monitor RIA-2318 has exc~eded 62,000 net cpm for a period of greater than 12 minutes (12 minutes is represented by 2 data **

points on the process monitor chart recorder).

2.

If high activity liquid effluents have been released, it may be ap~ropriate to provide a portable water monitoring

  • instrument f6r use by City Water Department (Filtration Plant) personnel (see EIS-2, "Gross Beta Determination in Water Samples"):

As a first approximation, assume

  • south Haven intake water may be as high as 0.001 times the peak concentration in the mixing basin.

8006040

.\\

I e

Card No.

Page 2 of Rev *. 3 5/14/.80

d. -If the range of stack monitor RIA-2318 has been exceeded; release rates will be detennined using the high range effluent monitor.

This monitor will be used according to the procedure EI8-4, "Emergency High Range Effluents Honitor".

e.

f *.

NOTE:

In the event this procedure is implemented, do n9t

  • attempt to remove charcoal filtering media from any system that exhausts to the stack or attempt to re~

move the stack sample cartridge for at least five (5) days following the accident.

After 5 days,. remove filtering media with extreme caut.ion and monitor the area continuously.

Obtain completed form EI4-l from Shift Supervisor.

Calculate off site doses per procedure EIS-1, "Estimate of Off Site Dose".

If high range effluent monitor is used, obtain appropriate da~a

  • sheets per procedure.EIS,-4.

\\

I

.I Compare results of calculating per procedure EI8-l 'dth dose rate monitor results at site boundary.

If monitoring results.are s.ignifi.cantly lower than. calculations, consider* monitoi;-ing adjacent sectors to esta')lish true plume location.

l~OTE:

provide a submersion:' dose rate.

l:iO' *.;ever, plt.i!I:e may reach ground at some greater distance from* site":*

Consider monitoring at "outer ring" points indicated on attached map if plume cannot be located by measure-ments *near site boundary.

g.. If. Site Emergency Di.rector determines there is a pos.sibility 0£ extensive reactor core damage, make estimate of degree of damage using EIS-3, "Determination.of Extent of Core Damage".

4.

Within 1 (one) hour after establisning that tnere has been signifi-cant (greater than 1%) core damage and upon authorization of the Site Emergency Director, dispatch Chemistry and Health Physics (C/HP)

Technicians to complete the following procedures:

a.

EI8-6, "Sampling and Analysis of High Activity Reactor Coolant"

. b~. *.** EIS:-7, "Sampling and Analysis of High Activity Containment _

Atmosphere" 5 0 If it is determined that it is necessary and-it has been authorized by the Site Emergency Director, dispatch a C/HP technician to complete

. *-procedure EIS-5, "In-plant Airborne -Iodine Monitoring and Thyroid Blocking Agent Administration Under Accident Conditions".

. ~* :

8 3

I C.:trd Ko. 8 Page 3 of 3 Rev. O 5/ll;/80 Subsequent Actions:.

I i

I

1.

Upon authorization by the Site Emergency Director, dispatch two C/lfP technicians (if available) off site to complete the following actions:

a.

Change out accident TLD's in accordance with EI8-8, "Off Site A~cident TLD Procedure".

b.

At a location specified by the Site Emergency Director complete procedure EI8-9, "Off Site Airborne Monitoring Under Accident Conditions."

2.

Following a major liquid or atmospheric release, initiate collection of envirorunental samples.

These samples may inclu~e, as appopriate:

~--

a.

TLD's from environmental monitoring stations.

Send to. analytical

  • contractor immediately for analysis; use attached TLD Report Sheet and station location map.

Replace TLD dpsimeters with film.

~..

b *. Air particulate and iodine

  • monitoring*stations.

Send for analysis; use.attached and s*tation location map.

filters from environmental air to analyticai contractor immediately Air Sample Collection Data Sheet Replace filters.

T;~c. (2) gall.an r:.prese.-~~a*ti~.re r:d.lk S~?les *from dairy he.:-c!s fro~

within a. 15 r;;.ile radius oi the pla~t;. use attached Hilk s~~;;l::

Collection Sheet and. dairy herd. location list.. Send to ana.lytical contractor.* *

d.

One (1) liter representative vegetation in season; from within a 1_5 mile _radius

  • .*Environmental.. Sample C::ollec ti on Sheets.

tractor.

samp:I-e, including crops of the plant; use at ta 1:hed Send i::o analytical con-..

e.

One (1) liter :rep:::-ese""'tztive untreated and treated water sample from the South Haven Treatment Pl~nt.

Send to analyti~al cc~

tractor for analysis.

NOTE:

Before sending any environmental samples to the analyt:~cal contracto.r for analysis, make a gross contamination check.

Based.on resulting contamination levels make recommendations*

to the Site Emergency Director of*appropriate actions

.*.to be taken.

3.

Assist in organizing and equipping post accident re-entry teams.