PALISADES NUCLEAR. PLANT llIERGENCY IMPLEMENTATION PROCEDURE PROC NO EIB-9 PAGE 1
- OF 5
REVISION o
consumers Power TITLE i OFF SITE AIRBORNE IODINE MONITORING UNDER ACCIDENT CONDITIONS DATE 4/30/80.
REVIEWED BY PRC -
DATE 4/28/80 QA-05 APPROVED tNERAL MANAGE
~
lt°i DATE
- 1. 0.
PURPOSE Toprovide a method to determine airborne iodine concentrations off site under accident conditions.
2.0 REFERENCES
2.1 NRC submittal for Palisades Plant, "Requirements Resulting from Review of Three Mile*Island 2 Accident:
Actions Taken in Response to", dated December 27, 1979, Section 2.l.8.b(2).
3.0 3.1 3.1.1 3.1. 2 3.1.3 3.1.4.
3.1.S
- .4.0
. 4.1 4.2 s.o*
5.1 5.1.l 5.1~2 PREREQUISITES Special Equipment Special equipment is located in a Company van reserved for use in.
environmental sampling, etc.. The van is located in the plant: parking. lot nea~ the Training Center.
Hfgh Volume Air Sampler - battery operated high volume air sam:pler,-Radeco model H-809C or equivalent, AC operated sampler (to be operated via portable generator); or equivalent.
. Two-inch.. particurate.. filter and cartridge holder..
Airborne iodine cartridge (silver zeolite, silver gel, etc.).
~.
Rate.":leter wi:th Eber.line 210 pancake probe or equivalent,.
PRECAUTIONS. AND Lil!ITATIONS Sampling locations and. frequencies will be determined by the Site.Emergency**
Direc.t.or depending on environmental conditions and population distriqud.ons.
Suggested locations are. indicated on Figµre l~.
s*ampling *may take place* in: highly contaminated areas.:..
Anti-c~ntamin~tion
- clothing and respirators may* be needed under these conditions.
- PROCEDURE.
Sampling Disassemble sample head.
Clearly mark an arrow on cartridge in direction of air flmt*;,/QR~'Jl~Jlt~'l soofln 4.o.
I l
I.
i l.
- I I
I I l
.@l *...
PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE 1--~~~~---~_;_~~~~~~~~~~~~~~~~--1 OFF SITE AIRBORNE Ioo;rnE MONITORING UNDER ACCIDENT CONDITIONS PROC tlO EI8-9
. PAGE 2
OF s REVISlON o consumers Power TITLE~
DATE 4/29/80
. 5.1.3 5~1.4 5.1.5 5.1.6 5.1. 7 5.2 5.2.P
. *.* -.s~ 2.* 2.
. 5.2. 3 5.2.4 Place cartridge in sample head with arrow in directio.n of air flow through the cartri_dge and reassemble sample head.
Place particulate pre-filter ~n place to prevent buildup of radioactive particulates on cartridge.
Screw on retaining r~ng and attach sample head
.to air sampler.
. Turn on sampler and adjust air flow to 1. 0-2. 0 cfm.
Note initial air flow reading and time.when sample collection started.
A ten (10) minute sample should be taken.
At the end of 10-minute sample period, note airflow reading and time and turn off sampler.
Remove cartridge frc.m sample head and place cartridge in polyethylene ba~.
Record:
- a.
Date.
. b. Starting and ending tiu.e.
c~ **Initial and final air flow.
- d.
Location and include with cartridge.
Analysis Take carfridge to* low background ar.ea or use lead bricks to shield pr9b~ if background radiation levels exceed 300 c?m
- Place:- probe: in contact with side away from arrow on cartridge.. Note reading on rate meter after meter has-stabilized*.:.
If range of meter is exceeded, repeat air sample (section 5.1) but decrease sample time. to aEpro,..."i.mately one-half. af.. previous. sample time.**
Cal~ul~te ~irborne iodin~ concentrations using the following equation:.
C =. (G. 7E-ll) (Rs-Rb) ts 1/2 (F1+Fz)
Where:
C = Concentration (uCi/cm3)
Rs = sample count rate (cpm)
.,. ~ = background count rate (cpm).
Fi = initial flow rate (cfm)
F2 = final flow rate (cfm) ts = elapsed sample time (minutes)
- ,,.,,I
Ii PALISADES NUCLEAR *PLANT EMERGENCY Il1PLEMENTATION !>ROCEDURE.
consumers Power TITl[j OF.F SITE AIRBORNE IODINE MONITORING mn>ER ACCIDENT C01'.TDITIONS 5.2.4 (continued)
PROC NO EI8-9 PAGE 3
- OF s REVISION O
DATE 4/29/80 6.7E-ll =conversion factor accounting.for units and instrument and filter effici~ncy.
5.2.S Record results and report to Site Emergency Director.
- 5. 3.
Retain cartridges for gamma spectra analysis.
6.0 ACCEPTANCE CRITERL~
N/A 7.0 RECORDS AND ATTACffi-1ENTS 7.1 Figure 1 "Recommended Off site Sampling Location" 7.2 Data sheet for off site.airborne iodine sampling.
.... ***-:... ~.. *..... *....
- .*.~;... *.
(_;I.__----
(_
i
~ :
1***.. - -*-* -
I I
O:'\\..,LETEO f./1217'!/F.A'I Mf'/SUP.VH (
EI8-9 Rev. O Page 4 of 5 4/30/80
.......... __._..;,.,_... ***:....... --~............
DATA SHEE'-r FOR OF.F Sl'!':E AIRBORNE IOin'l1E SAMPLING 1 DATE TIME SAMPLE.*
. LOCATION.
SERIAL NUMB~R COUNT_RATE MEtER SAMPLE TillE (MIN)
'lNlTIAL FLOW HATE
._----1----4--------1--- *----~-~---"...J9J..l12
~;:.~~~
~:l!~-*l o*'*'.,,,~
I l I
I I i FINAL BACKGROUND SAMPLE fLOW COUNT RATE COUNT RATE RATE (CPM)
(CPM)
(CFML CALCULATED BY REVIEWED B~ HEALTH PH¥SiCIST j..
,,..-, EI8,-9
\\ R~v. 0.
AIRBORNE IODINE CONC.
(Ci/m3)
Page5.
-~
4/30/80
-e
.,,