Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000400/LER-2016-0011 September 2016Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions
LER 16-001-00 for Shearon Harris, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions
Safe Shutdown
Tornado Missile
Enforcement Discretion
Tornado-Generated Missile
Tornado Missile Protection
05000400/LER-2016-00219 September 2016'A' Essential Services Chilled Water Chiller Trip due to Oil Leak from Failed Tube Fitting
LER 16-002-00 for Shearon Harris, Unit 1, Regarding 'A' Essential Services Chilled Water Chiller Trip Due to Oil Leak from Failed Tube Fitting
Mission time
Stress corrosion cracking
05000400/LER-2016-0047 December 2016Reactor Trip and Safety Injection During Turbine Control Testing at Low Power
LER 16-004-00 for Shearon Harris, Unit 1, Regarding Reactor Trip and Safety Injection During Turbine Control Testing at Low Power
Probabilistic Risk Assessment
Overspeed trip
05000400/LER-2016-0057 December 2016Offsite Power Undervoltage Caused Actuation of Several Systems
LER 16-005-00 for Shearon Harris Nuclear Power Plant, Unit 1 Regarding Offsite Power Undervoltage Caused Actuation of Several Systems
High winds
Probabilistic Risk Assessment
05000400/LER-2016-00614 December 2016Reactor Vessel Closure Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking and a Weld Fabrication Void
LER 16-006-00 For Shearon Harris Nuclear Plant, Unit 1 Regarding Reactor Vessel Closure Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking and a Weld Fabrication Void
Nondestructive Examination
Stress corrosion cracking
Through-Wall Leakage
Dissimilar Metal Weld
05000400/LER-2016-0079 February 2017Containment Spray System Valve Actuation
LER 16-007-01 for Shearon Harris Unit 1, Regarding Containment Spray System Valve Actuation
BSEP 13-0013, License Amendment Request to Facility Operating Licenses for Change of Licensee Name20 April 2013License Amendment Request to Facility Operating Licenses for Change of Licensee NameSafe Shutdown
Cyber Security
Safeguards Contingency Plan
License Renewal
Offsite Circuit
Fire Protection Program
Power Uprate
HNP-00-008, Revised Epips, Including Rev 5 to PEP-110, Emergency Classification & Proective Action Recommendations, Rev 8 to PEP-310, Notifications & Communications & Rev 1 to PEP-342, Core Damage Assessment. with 01/14/00 Letter14 January 2000Revised Epips, Including Rev 5 to PEP-110, Emergency Classification & Proective Action Recommendations, Rev 8 to PEP-310, Notifications & Communications & Rev 1 to PEP-342, Core Damage Assessment. with 01/14/00 LetterFitness for Duty
Earthquake
Siren
HNP-01-157, Revised Shearon Harris Nuclear Plant Emergency Plan Implementing Procedures PEP-110 (Revision 8), PEP-230 (Revision 7), PEP-310 (Revision 11) & PEP-110 (Revision 9)7 December 2001Revised Shearon Harris Nuclear Plant Emergency Plan Implementing Procedures PEP-110 (Revision 8), PEP-230 (Revision 7), PEP-310 (Revision 11) & PEP-110 (Revision 9)Severe Accident Management Guideline
Earthquake
Siren
HNP-02-006, Withdrawal of License Amendment Request Technical Specifications 3/4.3.2, 3/4.3.3.1, 3/4.6.1.1, 3/4.6.1.7, 3/4.6.3, 3/4.9.4 & 3/4.9.929 January 2002Withdrawal of License Amendment Request Technical Specifications 3/4.3.2, 3/4.3.3.1, 3/4.6.1.1, 3/4.6.1.7, 3/4.6.3, 3/4.9.4 & 3/4.9.9
HNP-02-009, Supplemental Response to NRC Bulletin 2002-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles28 January 2002Supplemental Response to NRC Bulletin 2002-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration NozzlesVT-2
HNP-02-016, Annual Operating Report for 200119 February 2002Annual Operating Report for 2001
HNP-02-018, January 2002 Monthly Operating Report for Shearon Harris Nuclear Power Plant15 February 2002January 2002 Monthly Operating Report for Shearon Harris Nuclear Power PlantPower Uprate
HNP-02-033, Submittal of Revision 2 to the Physical Security and Safeguards Contingency Plan28 March 2002Submittal of Revision 2 to the Physical Security and Safeguards Contingency PlanSafeguards Contingency Plan
HNP-02-035, Twenty-day Response to Order for Interim Safeguards and Security Compensatory Measures for Shearon Harris Nuclear Power Plant18 March 2002Twenty-day Response to Order for Interim Safeguards and Security Compensatory Measures for Shearon Harris Nuclear Power Plant
HNP-02-049, Revised EPIP PEP-430, Rev 2, Routine Maintenance & Testing of Dialogic System.25 March 2002Revised EPIP PEP-430, Rev 2, Routine Maintenance & Testing of Dialogic System.
HNP-02-050, Request for License Amendment Startup Test Report1 April 2002Request for License Amendment Startup Test ReportHydrostatic
Eddy Current Testing
Power Uprate
HNP-02-051, Part 2 of 2, Shearon Harris Nuclear Power Plant, Inservice Inspection Summary Report, Class 2 Through End1 April 2002Part 2 of 2, Shearon Harris Nuclear Power Plant, Inservice Inspection Summary Report, Class 2 Through EndHydrostatic
VT-2
HNP-02-052, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity2 April 2002Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary IntegrityBoric Acid
Time of Discovery
Hydrostatic
VT-2
Stress corrosion cracking
Pressure Boundary Leakage
Through-Wall Leakage
Operational leakage
HNP-02-055, NRC Correspondence Addressee Change Request9 April 2002NRC Correspondence Addressee Change Request
HNP-02-057, Annual Environmental (Non-Radiological) Operating Report for 200123 April 2002Annual Environmental (Non-Radiological) Operating Report for 2001Biofouling
Power Uprate
HNP-02-059, Annual Radiological Environmental Operating Report for 200130 April 2002Annual Radiological Environmental Operating Report for 2001Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
HNP-02-060, Annual Radioactive Effluent Release Report for 200123 April 2002Annual Radioactive Effluent Release Report for 2001Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Tritium
Power change
Power Uprate
HNP-02-063, 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity15 May 200260-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary IntegrityBoric Acid
Hydrostatic
VT-2
Stress corrosion cracking
Pressure Boundary Leakage
Pressure boundary leak
Through-Wall Leakage
Operational leakage
HNP-02-066, NPDES Permit Renewal Issued6 May 2002NPDES Permit Renewal IssuedGrab sample
Hydrostatic
HNP-02-078, Request for Emergency License Amendment, Revises TSs 3/4.3.3.629 May 2002Request for Emergency License Amendment, Revises TSs 3/4.3.3.6Reactor Vessel Water Level
Post Accident Monitoring
HNP-02-088, Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.28 July 2002Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.2Offsite Circuit
HNP-02-093, Request for License Amendment Technical Specifications 3/4.9.928 August 2002Request for License Amendment Technical Specifications 3/4.9.9
HNP-02-095, Change to Emergency Plan Implementing Procedure1 July 2002Change to Emergency Plan Implementing Procedure
HNP-02-113, Request for License Amendment, Response Time Testing Elimination30 August 2002Request for License Amendment, Response Time Testing EliminationShutdown Margin
Packing leak
Process Control Program
Pressure Boundary Leakage
HNP-02-115, On-Site Storage of Classified Information for the NRC23 August 2002On-Site Storage of Classified Information for the NRC
HNP-02-118, 30-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs12 September 200230-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection ProgramsBoric Acid
Non-Destructive Examination
Nondestructive Examination
VT-2
Stress corrosion cracking
Pressure Boundary Leakage
Through-Wall Leakage
Operational leakage
HNP-02-119, Notification of Full Compliance with Order for Interim Safeguards and Security Compensatory Measures6 September 2002Notification of Full Compliance with Order for Interim Safeguards and Security Compensatory Measures
HNP-02-124, Cycle 11, Startup Test Report Revision 119 September 2002Cycle 11, Startup Test Report Revision 1Hydrostatic
Eddy Current Testing
Power Uprate
HNP-02-125, Emergency Core Cooling System Evaluation Changes16 September 2002Emergency Core Cooling System Evaluation ChangesPower Uprate
HNP-02-126, Unit No.1, Application for TS Change Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement Process26 September 2002Unit No.1, Application for TS Change Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement ProcessTime of Discovery
Offsite Dose Calculation Manual
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
HNP-02-129, Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations.19 September 2002Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations.Earthquake
Siren
HNP-02-141, Request for License Amendment - Response Time Testing Elimination Supplemental Information21 November 2002Request for License Amendment - Response Time Testing Elimination Supplemental Information
HNP-02-142, Response to RAI Generic Ltr. 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions.29 October 2002Response to RAI Generic Ltr. 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions.Flow Induced Vibration
HNP-02-150, Approval Requested to Use Later Edition & Addenda of OM Code Approved for Use by NRC for Pressure Relief Devices Subject to IST Requirements for Remainder of Second 10-Year IST Interval4 December 2002Approval Requested to Use Later Edition & Addenda of OM Code Approved for Use by NRC for Pressure Relief Devices Subject to IST Requirements for Remainder of Second 10-Year IST Interval
HNP-02-153, Request for Additional Information on Amendment Application Regarding Addition of Methodology References to the Core Operation Limits Report21 November 2002Request for Additional Information on Amendment Application Regarding Addition of Methodology References to the Core Operation Limits Report
HNP-02-162, Request for License Amendment, Response Time Testing Elimination Supplemental Data, Additional Information16 December 2002Request for License Amendment, Response Time Testing Elimination Supplemental Data, Additional Information
HNP-02-164, Letter from James Scarola, Harris Nuclear Plant - - Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.24 January 2003Letter from James Scarola, Harris Nuclear Plant - - Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Boric Acid
Weld Overlay
VT-2
Stress corrosion cracking
Pressure Boundary Leakage
Through-Wall Leakage
Operational leakage
HNP-02-172, Conversion to Improved Standard TS Schedule Change19 December 2002Conversion to Improved Standard TS Schedule Change
HNP-03-006, Request for License Amendment - Response Time Testing Elimination Supplemental Information23 January 2003Request for License Amendment - Response Time Testing Elimination Supplemental Information
HNP-03-014, Request for License Amendment TS 5.6.3.d14 February 2003Request for License Amendment TS 5.6.3.dUltimate heat sink
Time to boil
Fuel cladding
Power Uprate
HNP-03-015, TS Bases Change - Containment Isolation Valves19 February 2003TS Bases Change - Containment Isolation Valves
HNP-03-017, Annual Operating Report - 200219 February 2003Annual Operating Report - 2002
HNP-03-019, Change to Emergency Plan Implementing Procedures14 February 2003Change to Emergency Plan Implementing ProceduresEarthquake
Siren
HNP-03-020, January 2003 Monthly Operating Report for Shearon Harris5 February 2003January 2003 Monthly Operating Report for Shearon Harris