FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl | 10 November 1986 | Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl | |
LIC-94-0164, Part 21 Rept Re Nonconformance in Potentiometers W/ Attachable Switches Mfg by Ohmite & Supplied by Abb C-E. Nonconforming Components Returned to Abb C-E & Abb C-E Issued Info Bulletin 94-02,providing Appropriate Guidance | 24 August 1994 | Part 21 Rept Re Nonconformance in Potentiometers W/ Attachable Switches Mfg by Ohmite & Supplied by Abb C-E. Nonconforming Components Returned to Abb C-E & Abb C-E Issued Info Bulletin 94-02,providing Appropriate Guidance | |
ML17264A938 | 10 July 1997 | Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process | |
ML17348B506 | 9 October 1990 | Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards | |
ML17354B097 | 9 September 1998 | Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils | |
ML18038A897 | 7 September 1994 | Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures | |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML18079A952 | 28 October 1978 | Deficiency Rept:On 780928,during Routine Design Review, Undersizing of Refueling Water Storage Tank Was Discovered. Tank Storage Capacity Has Been Increased.Design Drawings for Tank Piping & Foundation Will Be Modified | |
ML18081A375 | 5 October 1979 | Significant Deficiency Rept Re Containment Purge & pressure- Vacuum Relief Valves.Actuator Torque Values Were Insufficient to Move Valves from Open to Closed Positions W/ Design Differential Pressure of 60 Psi.Design Reviewed | |
ML18081A378 | 5 October 1979 | Significant Deficiency Rept 79-06 Re Steam Generator Water Level Instrumentation.Pipe Breaks in Containment Could Lead to Elevated Temp Readings Which Could Result in Delayed Protection Sys Actuation.Setpoints to Be Changed | |
ML18081A755 | 4 October 1979 | Interim Deficiency Rept Re Max Flow of RHR Pump During post- LOCA Mode.Caused by Low Sys Resistance to Pump Runout Conditions.Sys Resistance Increased by Placement of Resized Orifices | |
ML18081B048 | 21 December 1979 | Final Deficiency Rept Re Undetectable Failure in Engineered Safety Features Actuation Sys.Testing Procedures Revised to Include Testing of Permissive Circuitry P4 on Periodic Basis.Unit Will Be Tested Prior to Operation | |
ML18081B060 | 3 December 1979 | Initial Deficiency Rept Re Potential Dropped Rod Events Leading to Calculated DNB Ratios Lower than Reported to NRC for Certain Westinghouse Plants.Util Is Investigating Condition for Applicability to Facility | |
ML18082A142 | 15 February 1980 | Final Deficiency Rept:Check Valve 2DR-7 Failed to Meet Applicable Seismic Class I Loading.Caused by Design Defect. Addl Support Will Be Completed by 800228 | |
ML18093A472 | 23 October 1987 | Part 21 Rept Re Calibr Gas Leakage Problem in Exo-Sensors, Inc Containment Hydrogen Analyzer Sys.Caused by Design Deficiency Associated W/Calibr Gas Subassembly.Monitoring Program to Be Maintained for Period After Sys Mods | |
ML18093A828 | 6 May 1988 | Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced | |
ML18094A442 | 16 May 1989 | Part 21 Rept Re Defect in Solid State Protection Sys. During Mods in Solid State Protection Sys Cabinets,Noted That Two Wires Became Dislodged from Circuit Board.Visual Insp & Complete Pull Test Performed | |
ML18094B446 | 27 April 1990 | Part 21 Rept Re shaft-to-pinion Key Failures in Limitorque Actuators.Initially Reported on 900424.Caused by Reduction of cross-sectional Area & Ultimate Propagation of Cracks. Util Intends to Replace Keys in Actuators W/Keys of Steel | |
ML18095A225 | 22 May 1990 | Part 21 Rept Re Insufficient Welds on Pedestal Support Alignment Lug & Slide Shoe for 11,12,21 & 22 Charging/Safety Injection Pumps.Initially Reported on 900516.Windows Cut in Support Pedestals to Gain Access to Affected Areas | |
ML18095A232 | 24 May 1990 | Part 21 Rept Re Discrepancies Identified in ECCS Flow Orifice K Factors Supplied by Westinghouse.Initially Reported on 900518.Util Fabricated New Orifice Plates to Original Specs | Unanalyzed Condition |
ML18095A403 | 2 August 1990 | Part 21 Rept Re MSIV Design Deficiency at Plant.Design Spec Provided by Westinghouse Did Not Specify Requirement to Provide Seal in Capability & Util Design Process Failed to Recognize Deficiency | |
ML18096B242 | 1 February 1993 | Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl | |
ML18100A768 | 13 December 1993 | Interim Part 21 Rept Re Discovery That Ge/Alco EDGs High Pressure Injection Tube Studs Did Not Meet Correct Matl non- Std & Not Correct Geometry.All Nonconforming Studs Identified & Replaced | |
ML18100B191 | 30 June 1994 | Initial Part 21 Rept Re Deficiency in Signal Summators PM-505B & PM-506B Supplied by Westinghouse.Design Changes Implemented & Operators Made Aware of Affects of Power Supply Transient on Summator Operability | |
ML18100B210 | 14 July 1994 | Deficiency Rept Re PORV Plug & Stem Material Defects. Initially Reported 940714.PORV Internals Were Replaced W/Plug Stellited | |
ML18100B227 | 25 July 1994 | Part 21 Rept Re Cracking in Valve Stem & Plug Connection Pinning Collar Area on PORVs 1PR1 & 1PR2.Caused Attributed to Either IGSCC or Hydrogen Assisted Cracking.Porv Internals Replaced W/Internals Mfg from SS 316 Matl W/Plug Stellited | |
ML18100B239 | 27 July 1994 | Part 21 Rept Re Signal Summators PM-505B & 506B Found to Saturate High When Summators Lose Power & Reenergized. Summators Powered from Independent Vital Instrument Buses & Inverters.Design Changes Implemented | |
ML18101A861 | 1 August 1995 | Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily | |
ML18101A877 | 4 August 1995 | Interim Part 21 Rept Re Potentially Reportable Deficiency in Edward Valve Model 838YT Check Valves Due to Disk Exhibiting Excessive Leakage.Disk from Original Valve Cleaned, Inspected & Installed in Replacement Valve | |
ML18102A338 | 21 August 1996 | Part 21 Rept Re Chipping of Latching Mechanism Props Installed in GE 4 Kv magne-blast Circuit Breakers,Type AM-4.16-350-2H.Two Affected Breakers Have Been Returned to Vendor | |
ML18102A370 | 6 September 1996 | Part 21 Rept Re Installation of NUS Model OCA 801 Signal Isolator Modules & Model Mth 801 Signal Summator Modules. Replacement Modules Including Spares for Plant,Unit 2 Have Been Inspected by Vendor & Repaired | Design basis earthquake |
ML18102A559 | 8 August 1996 | Part 21 Rept Re Defect in NUS Model OCA801 Signal Isolator Modules.Replacement Modules Installed in Reactor Control & Protection Sys | Design basis earthquake |
ML18106B044 | 29 January 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables | |
ML18106B055 | 1 February 1999 | Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl | |
ML18106B093 | 25 February 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified | |
ML18107A344 | 1 June 1999 | Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 | |
ML19290B660 | 26 September 1979 | Interim Significant Deficiency Rept Re Weld Wire Documentation.Electrodes Used in post-weld Heat Treated Condition Were Not Properly Tested.Caused by Discrepancy in Procedures.Procedures Will Be Revised by 800118 | |
ML19290E032 | 18 January 1980 | Second Interim Rept Re Pittsburgh Des Moines Use of 8018-C3 Weld Filler Metal.New Electrode Spec Issued,Welding Procedures Revised.Investigation Will Be Complete by 800314 | |
ML19305C753 | 3 March 1980 | Interim Deficiency Rept Re Main Steam Pipe Spools.Ge Issued Instructions to Restore Affected Wall Thickness to Original GE Spec Requirement.Final Rept Will Be Submitted by 800321 | |
ML19309G766 | 2 May 1980 | Potential Significant Deficiency Rept Re Discrepancy in Procurement of Weld Wire.Wire Used in post-weld,heat-treated Weldments Was Tested for Only as-welded Condition | |
ML19323G137 | 25 April 1980 | Interim Deficiency Rept Re Primary Containment Relief Valves Potential Significant Deficiency.Determination of Corrective Action Scheduled for 800522 | |
ML19323G423 | 23 May 1980 | Second Interim Rept Re Potential Deficiency in Primary Containment Relief Valves.Initial Analysis Indicates Hinge Block Mounting Studs Inadequate.Revised Analysis by 800630 | |
ML19324C113 | 2 November 1989 | Part 21 Rept Re Defects in Instrument Racks for Use in Hatch,Inc Supplied Emergency Diesel Generator Starting Air & Lube Oil Sys.Verification of All Tube Fittings in Instrument Rack Completed & All Discrepant Fittings Corrected | |
ML19330B281 | 25 June 1980 | Potential Significant Deficiency Rept Re Primary Containment Relief Valves Supplied by Gpe Controls.Bechtel Has Completed Review of Revised Stress Analysis Calculations.Expected Completion Date of Actions Is 800815 | |
ML19332A674 | 2 September 1980 | Part 21 Rept Re Con/Chem Epoxy Surfacer Sys.Suppls 800812 Ltr Re Subj Item Reported by Bechtel Power Corp.Will Advise of Schedule Dates of Completion When Bechtel Engineering Studies Finalized | |
ML19332C583 | 20 November 1989 | Part 21 Rept Re Misapplication of Magnetrol Level Switches Supplied by GE W/Hpci & RCIC Turbine Assemblies.Switches Declared Inoperable & Electrically Disconnected.Magnetrol Will Modify Spare Level Switch Assemblies | |
ML19337B345 | 20 August 1980 | Interim Deficiency Rept Re Primary Containment Relief Valves Supplied by Gpe Controls.Bechtel Review Showed Calculation Assumptions Re Seismic Analysis Require Further Vendor Justification.Next Rept by 801024 | |
ML19340D880 | 24 October 1980 | Interim Deficiency Rept Re Primary Containment Relief Valves at Facility,Initially Reported on 800326.Expected Conclusion of Investigation Has Been Postponed Until 801205 | |
ML19340E132 | 3 December 1980 | Significant Deficiency Rept,Originally Reported on 800326, Re Primary Containment Vacuum Relief Valves.Concludes That Subj Bolting Is Designed within Appropriate Stress Allowables & Conforms W/Spec 10855-M-150(Q) | |
ML19343A654 | 10 November 1980 | Interim Deficiency Rept,Originally Reported on 801009,re Two Class 2 Carbon Steel Pipes Supplied by Labarge Inc Lacking Radiography of Longitudinal Weld Seam.Matl Returned to Labarge.Next Rept to Be Submitted on 801209 | Nondestructive Examination |