Thomas J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Vice President Engineering and Construction February 15, 1980 Mr. Boyce H. Grier, Director
- u. S. Nuclear Regulatory Commission
-Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
DM WATER MAKEUP TO THE AUXILIARY FEEDWATER STORAGE TANK DESIGN DEFICIENCY 10CFRSo-~ 55 (E) "SIGNIFICANT DEFICIENCY" NO. 2 UNIT SALEM GENERATING STATION On January 28, 1980, a verbal report was.made-to your.-office relative to a design deficiency involving check valve DR-7 which could potentially drain the auxiliary feedwater storage tank in the event of a seismic occurrence.
This. report was made pursuant to the provisions of 10CFR50.55 (e).
PSE&G Engineering.. has e,valuated this condition and of* ~he various options available: to 'correct this design deficien¢y, P~E&G elected to have the 2DR-7' valve qualified to meet the applicable seismic*
Class I loading.
The seismic test was satisfactorily completed to IEEE~344, 1975 standard on January 30,. 1980 at the Franklin Institute Research Laboratories, Inc., Philadelphia.
In order that the field piping configuration simulates the test conditions, the valve 2DR-7 in the field requires an additional support.
This additional support will be completed on Unit No. 2 by February 28, 1980.
If you require additional information, we will be pleased to discuss it with you.
CC:
Mr. L. J. Norrholm NRC, Hancocks Bridge Very truly yours, soo4100 C/3