Text

'

Thomas .'. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J.07101 201/430-8316 Vece President Enoneenng and Construction November 10, 1980 _

. Hi

,. a

  • n 23 Mr. Boyce H. Grier, Director 7,, _

U. S. Nuclear Regulatory Commission n:5M

- ~

Office of Inspection and Enforcement ,6%g _, , 3-Region 1 -Q d r.

631 Park Avenue i5 m ' 5; King of Prussia, Pennsylvania 19406 ly y., y --

a

Dear Mr. Grier:

SA155 KC700 Pipe, 30" x .375" 10CFR50.55(e), POTENTIAL SIGNIFICANT DEFICIENCY NO. 1 AND 2 UNITS HOPE CREEK GENERATING STATION On October 9, 1980, a verbal report was made to Region 1, Office of Inspection and Enforcement representative, Mr. J. Mattia, advising of a potential significant item.

The item concerns two pieces of 30" x .375" carbon steel pipe, ASME SA155, Grade KC70, Class 2, seam welded and fabricated by LaBarge Incorporated, Wagoner, Oklahoma. The material was found to be lacking radiography of the longi-tudinal weld seam.

The following supplemental information is submitted in accordance with the requirements of 10CFR50.55(e).

Investigative action to date included a field review whfch revealed no other seam welded pipe purchased to date and a field review of application which revealed the pipe's intended use was Nuclear Class 3 but was purchascd as Class 2.

I Corrective action included a nonconformance report issuance l and return of material to LaBarge for nondestructive examination. Radiography performed in accordance with requirements of SA155 estattished that each cylinder required weld repair.

l gl?!9 55; 8 0 8omo o /r7 e ~

s _

. r t

Boyce H. Grier 11/10/80 Determination of reportability per requirements of 10CFR 50.55(e) is being assessed and is scheduled for completion December 9, 1980, at'which time a report will be'made'to the NRC. .

Very truly yours, ORIG. SIGNED BYt T, J. MARTIN.

F T

CC Office of Inspection & Enforcement Div. of Reactor Construction Inspection Washington, DC t