ML19332A674

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Con/Chem Epoxy Surfacer Sys.Suppls 800812 Ltr Re Subj Item Reported by Bechtel Power Corp.Will Advise of Schedule Dates of Completion When Bechtel Engineering Studies Finalized
ML19332A674
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/02/1980
From: Martin T
Public Service Enterprise Group
To:
References
REF-PT21-80-236-002 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8009160650
Download: ML19332A674 (2)


Text

i ATTAGED IS A PART 21 REPORT FROM IE l%1L INIT - ROOM 359 Ehl 3 4 .

Tw 4,6en>4. tiedri u.

PART 21 IDEIRIFICATION NO. to 243-oo2. COMPANY KATE 6 u camsa m u ,

! DATEOFlEiiEP. AltISO D00(ET NO. Do- %4 ,l DATE DISTRIBUTED 914140 ORIGINAL REPORT __

SUPPLEfBiTARY x.

DISTRIBlRION: ,

EACTOR (R) 1 FUEL CYCLE & _

SAFEGUARDS (S) _

f TERIALS (M) -

IE FILES IEFILES}

AD/ROI(2) IEFILES AD/SG AD/RCI (l) AD/FFIE! AD/ROI EGIONS I,II,III,IV,V EGIONS I,II,III,lV,V EGIONS I,II,III,IV,V

~

VENDOR BR. R-IV Vr34 DOR BR. R-IV VENDOR BR. R-IV L0EB / IPA F14B 5715 NIES/FCMS SS-396 NRP/DCL AEOD tiiB7602 lEB / PPA fiiB5715 ffBS / SG SS-881 NRR/ DOE AEOD . FliB 7602 LDEB / FPA F14B5715 NRR/DSI ASLBP E/W 450 AE0D FfB 7602 NRR/ DST SAP /SP INB-7210A ASLBP E/W 450 NRR/ DOL -

CENTPALFILES 016 CEfERALFILES 016 ASLBP E/W 450 CENTRAL FILES ( GROV CENTRAL FILES (GRON)

CBfTRAL FILES 016 PDR CEfRRAL FILES SS-396 CENTRAL FRES (GROFD LPDR PDR PDR TEPA LPDR IPDR TERA C

ACTION:

PRELIMINARY EVALUATION OF THE' ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOR FOLLOWUP AS SFDWN BELOW:

IE 1 NRR IfSS [ OTHER [

Sc FFMSI 800.91640 8 E 6 par. 8/1/80 L

C;, DQi. h t+ Ll - 2 (6 3 ' @ 7 1

l ,

r Thornas J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430 b3H Vic? Presicent Engineering and Construction September 2, 1980 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission gg Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

CON / CHEM EPOXY SURFACER SYSTEM 10CFR50.55(e), POTENTIAL SIGNIFICANT DEFICIENCY NO. 1 UNIT HOPE CREEK GENERATING STATION The following supplements our letter dated August 12, 1980 con-cerning the subject item reported by the Bechtel Power Corporation under 10CFR21. ,

l The duplicate reportability of the subject item by the licensee under 10CFR50.55(e) is satisfied by the details contained in Bechtel Power Corporation letter to the Commission dated July 28, 1980.

We will advise you of the resolution and schedule dates of completion when the engineering studies by Bechtel have been finalized.

Should any additional information be desired, we will be pleased to discuss it further with you.

Very truly yours, 62 4/

CC Director Office of Inspection & Enforcement Washington, DC G. B. Jones Bechtel Power Corporation San Francisco, CA