ML0617700694 May 2006VYNPS Email to L.Dewald Re Dry Fuel Storage Pad, Apron, and Ramps EN Ev 115 Envrionmental Review. March 20, 2006
ML06254004527 April 2006Email: (PA) Request for Additional Information to Support the Staff'S Severe Accident Mitigation Alternative Review for Vermont Yankee Nuclear PowerInternal Flooding
Probabilistic Risk Assessment
ML06258018714 September 20062006/09/14-Audit Trip Report Regarding Entergy Nuclear Vermont Yankee, LLC, License Renewal Application for Vermont Yankee Power Station, Dated January 29, 2006Anticipated operational occurrence
Internal Flooding
Aging Management
Earthquake
ML06272021829 September 20062006/09/29-Summary of a Telephone Conference Call Held on August 10, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal ApplicationAging Management
Pressure Boundary Leakage
ML06279007112 October 20062006/10/12-Summary of a Telephone Conference Call Held on September 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal ApplicatioAging Management
ML0703605608 November 2006Y020070028 - Informal Vermont Yankee Seismic and Hydrology QuestionsSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML07040008513 February 2007G20070068/LTR-07-0060/SECY-2007-0019 - Draft Supplemental Environmental Impact Statement for License Renewal of Vermont Yankee - Letters to Senator Leahy, Senator Sanders, Representative Welch from Luis Reyes
ML07053056120 February 2007Y020070028 - E-mail Hoch, NRR, to Becker, State of Vermont, Seismic and Flood Questions from AnrSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Backfit
ML0706101801 May 2007Trip Report for a Trip Taken to Vermont, Massachusetts and New Hampshire
ML07067040828 November 1999Torus General Visual Report, 10/28/1999 (55 Pages)Moisture barrier
Weak link
ML07068007929 November 1999Vym 99/148, ASME Section XI Subsection IWE Report on Evaluation of 1998 Torus Inspections, 11/29/1999 (Part 1)Hydrostatic
Coatings
Nondestructive Examination
ML07068018321 July 1998Vym 98/132, Summary of ASME Section XI Subsection IWE Torus Shell & Downcomer Inspections Performed During the 1998 Refueling Outage, 07/21/1998Coatings
Moisture barrier
ML0707406913 April 2007ACRS Review of the Vermont Yankee Nuclear Power Station, License Renewal Application - Safety Evaluation Report
ML07079070410 December 2001Memo from Kathy H. Gibson to J. Clifford, Re NRR Work Request: License Transfer and Conforming Amendments to Vermont Yankee Facility Operating License,
ML0710201668 January 2001Memo from David Trimble to James Clifford, Subject: Safety Evaluation Input for Order Approving Transfer of Licensed Operating Authority for Vermont Yankee Nuclear Power Station
ML07102017015 January 2002Memo from Cynthia Carpenter to Elinor Adensam, Safety Evaluation for the Proposed Transfer of Operating License DPR-28 for Vermont Yankee Nuclear Power Station from Vermont Yankee Nuclear Power Corp to Entergy Nuclear Vermont Yankee LLC and
ML07102017114 May 2002Memo from Robert Pulsifer to James Clifford, Subject: Approval of License Transfer for Vermont Yankee Nuclear Power Station
ML07102017531 July 2002Memo from Robert Pulsifer to Biweekly Notice Coordinator, Subject: Request for Publication in Biweekly Fr Notice - Notice of Issuance of Amendment to Facility Operating License
ML0713103198 May 2007FRN - Plant License Renewal, June 5, 2007
ML07141043425 April 2007Handouts to Applicants (Folder 3)
ML07163037010 July 2007Trip Report Summarizing May 29, 2007 Visit to Vermont Yankee Nuclear Power Plant Regarding the License Renewal Environmental Review
ML07183018710 July 200706/01/2007 Summary of Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning Items Pertaining to the Vermont Yankee License Renewal Safety Evaluation ReportAging Management
ML0721804338 August 2007Summary of Telephone Conference Call Held on July 18, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Vermont Yankee Nuclear Power SAging Management
ML0721805228 August 2007Summary of Telephone Conference Call Held on June 29, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Vermont Yankee Nuclear Power StAging Management
ML07263001426 September 2007L. Reyes Memo Direct Final Rule - HI-STORM 100, Amend 4 - EDO Pkg. - to Amend 10 CFR Part 72 List of Approved Spent Fuel Storage Casks
ML07330015226 November 2007Summary of Telephone Conference Call Held on October 16, 2007, Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewa
ML08015059317 January 2008December 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206Unanalyzed Condition
ML08022050831 January 200801/08/2008 Summary of Meeting Between the NRC Staff and Entergy Nuclear Operations, Inc. to Discuss the Response to a Request for Additional Information Pertaining to the Vermont Yankee License Renewal
ML08056062727 February 2008Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report
ML08074008414 March 2008Draft Regulatory Guide for Comment
ML0820601728 August 2008Docketing of Additional Information Pertaining to the License Renewal Application of the Vermont Yankee Nuclear Power Station
ML09040054217 February 2009Audit Plan for Review of Confirmatory Analyses for the Core Spray and Reactor Recirculation Outlet Nozzles at the Vermont Yankee Nuclear Power Station
ML09133082313 May 2009Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09
ML0915200098 June 2009Forwarding of Supplement 1 to NUREG 1907 to the ACRS
ML0927301379 October 2009Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries
ML1006401885 March 2010Charter for the Groundwater Contamination Task Force
ML1009603215 April 2010Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Vermont Yankee
ML1009904588 April 2010Deviation from the Reactor Oversight Process to Provide Increase NRC Oversight to Specific Issues at Vermont Yankee Nuclear Power Station
ML10301013628 October 2010Memorandum and Order (Ruling on Motion to Reopen Proffering New Contention) (LBP-10-19)Aging Management
ML1100502529 February 2011Memo to Chairman Jaczko Fm R. W. Borchardt, EDO Initiatives for Improved Communication of Groundwater Incidents
ML11075040521 March 2011Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements
ML11126A09612 May 2011Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors
ML1115704056 June 2011Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness
ML11250A17114 September 2011Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs)
ML11321A22817 November 2011Third Quarter 2011 Performance Review Memorandum
ML12298A08824 October 2012Forthcoming Meeting to Discuss Proposed License Amendment Request to Revise 10 CFR 50.63 Alternate AC Power Source to SBO EDG
ML13108A32822 April 2013Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094)
ML13127A36915 March 2012Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and AnalysisSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Incorporated by reference
Aging Management
ML13150A21831 May 20136/12/13 Notice of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Request for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies
ML13219A04715 March 2012Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and AnalysisSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Incorporated by reference
Aging Management