Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML061770069 | 4 May 2006 | VYNPS Email to L.Dewald Re Dry Fuel Storage Pad, Apron, and Ramps EN Ev 115 Envrionmental Review. March 20, 2006 | |
ML062540045 | 27 April 2006 | Email: (PA) Request for Additional Information to Support the Staff'S Severe Accident Mitigation Alternative Review for Vermont Yankee Nuclear Power | Internal Flooding Probabilistic Risk Assessment |
ML062580187 | 14 September 2006 | 2006/09/14-Audit Trip Report Regarding Entergy Nuclear Vermont Yankee, LLC, License Renewal Application for Vermont Yankee Power Station, Dated January 29, 2006 | Anticipated operational occurrence Internal Flooding Aging Management Earthquake |
ML062720218 | 29 September 2006 | 2006/09/29-Summary of a Telephone Conference Call Held on August 10, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application | Aging Management Pressure Boundary Leakage |
ML062790071 | 12 October 2006 | 2006/10/12-Summary of a Telephone Conference Call Held on September 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Applicatio | Aging Management |
ML070360560 | 8 November 2006 | Y020070028 - Informal Vermont Yankee Seismic and Hydrology Questions | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML070400085 | 13 February 2007 | G20070068/LTR-07-0060/SECY-2007-0019 - Draft Supplemental Environmental Impact Statement for License Renewal of Vermont Yankee - Letters to Senator Leahy, Senator Sanders, Representative Welch from Luis Reyes | |
ML070530561 | 20 February 2007 | Y020070028 - E-mail Hoch, NRR, to Becker, State of Vermont, Seismic and Flood Questions from Anr | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Backfit |
ML070610180 | 1 May 2007 | Trip Report for a Trip Taken to Vermont, Massachusetts and New Hampshire | |
ML070670408 | 28 November 1999 | Torus General Visual Report, 10/28/1999 (55 Pages) | Moisture barrier Weak link |
ML070680079 | 29 November 1999 | Vym 99/148, ASME Section XI Subsection IWE Report on Evaluation of 1998 Torus Inspections, 11/29/1999 (Part 1) | Hydrostatic Coatings Nondestructive Examination |
ML070680183 | 21 July 1998 | Vym 98/132, Summary of ASME Section XI Subsection IWE Torus Shell & Downcomer Inspections Performed During the 1998 Refueling Outage, 07/21/1998 | Coatings Moisture barrier |
ML070740691 | 3 April 2007 | ACRS Review of the Vermont Yankee Nuclear Power Station, License Renewal Application - Safety Evaluation Report | |
ML070790704 | 10 December 2001 | Memo from Kathy H. Gibson to J. Clifford, Re NRR Work Request: License Transfer and Conforming Amendments to Vermont Yankee Facility Operating License, | |
ML071020166 | 8 January 2001 | Memo from David Trimble to James Clifford, Subject: Safety Evaluation Input for Order Approving Transfer of Licensed Operating Authority for Vermont Yankee Nuclear Power Station | |
ML071020170 | 15 January 2002 | Memo from Cynthia Carpenter to Elinor Adensam, Safety Evaluation for the Proposed Transfer of Operating License DPR-28 for Vermont Yankee Nuclear Power Station from Vermont Yankee Nuclear Power Corp to Entergy Nuclear Vermont Yankee LLC and | |
ML071020171 | 14 May 2002 | Memo from Robert Pulsifer to James Clifford, Subject: Approval of License Transfer for Vermont Yankee Nuclear Power Station | |
ML071020175 | 31 July 2002 | Memo from Robert Pulsifer to Biweekly Notice Coordinator, Subject: Request for Publication in Biweekly Fr Notice - Notice of Issuance of Amendment to Facility Operating License | |
ML071310319 | 8 May 2007 | FRN - Plant License Renewal, June 5, 2007 | |
ML071410434 | 25 April 2007 | Handouts to Applicants (Folder 3) | |
ML071630370 | 10 July 2007 | Trip Report Summarizing May 29, 2007 Visit to Vermont Yankee Nuclear Power Plant Regarding the License Renewal Environmental Review | |
ML071830187 | 10 July 2007 | 06/01/2007 Summary of Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning Items Pertaining to the Vermont Yankee License Renewal Safety Evaluation Report | Aging Management |
ML072180433 | 8 August 2007 | Summary of Telephone Conference Call Held on July 18, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Vermont Yankee Nuclear Power S | Aging Management |
ML072180522 | 8 August 2007 | Summary of Telephone Conference Call Held on June 29, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Vermont Yankee Nuclear Power St | Aging Management |
ML072630014 | 26 September 2007 | L. Reyes Memo Direct Final Rule - HI-STORM 100, Amend 4 - EDO Pkg. - to Amend 10 CFR Part 72 List of Approved Spent Fuel Storage Casks | |
ML073300152 | 26 November 2007 | Summary of Telephone Conference Call Held on October 16, 2007, Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewa | |
ML080150593 | 17 January 2008 | December 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206 | Unanalyzed Condition |
ML080220508 | 31 January 2008 | 01/08/2008 Summary of Meeting Between the NRC Staff and Entergy Nuclear Operations, Inc. to Discuss the Response to a Request for Additional Information Pertaining to the Vermont Yankee License Renewal | |
ML080560627 | 27 February 2008 | Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report | |
ML080740084 | 14 March 2008 | Draft Regulatory Guide for Comment | |
ML082060172 | 8 August 2008 | Docketing of Additional Information Pertaining to the License Renewal Application of the Vermont Yankee Nuclear Power Station | |
ML090400542 | 17 February 2009 | Audit Plan for Review of Confirmatory Analyses for the Core Spray and Reactor Recirculation Outlet Nozzles at the Vermont Yankee Nuclear Power Station | |
ML091330823 | 13 May 2009 | Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09 | |
ML091520009 | 8 June 2009 | Forwarding of Supplement 1 to NUREG 1907 to the ACRS | |
ML092730137 | 9 October 2009 | Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries | |
ML100640188 | 5 March 2010 | Charter for the Groundwater Contamination Task Force | |
ML100960321 | 5 April 2010 | Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Vermont Yankee | |
ML100990458 | 8 April 2010 | Deviation from the Reactor Oversight Process to Provide Increase NRC Oversight to Specific Issues at Vermont Yankee Nuclear Power Station | |
ML103010136 | 28 October 2010 | Memorandum and Order (Ruling on Motion to Reopen Proffering New Contention) (LBP-10-19) | Aging Management |
ML110050252 | 9 February 2011 | Memo to Chairman Jaczko Fm R. W. Borchardt, EDO Initiatives for Improved Communication of Groundwater Incidents | |
ML110750405 | 21 March 2011 | Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements | |
ML11126A096 | 12 May 2011 | Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors | |
ML111570405 | 6 June 2011 | Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness | |
ML11250A171 | 14 September 2011 | Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) | |
ML11321A228 | 17 November 2011 | Third Quarter 2011 Performance Review Memorandum | |
ML12298A088 | 24 October 2012 | Forthcoming Meeting to Discuss Proposed License Amendment Request to Revise 10 CFR 50.63 Alternate AC Power Source to SBO EDG | |
ML13108A328 | 22 April 2013 | Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) | |
ML13127A369 | 15 March 2012 | Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Incorporated by reference Aging Management |
ML13150A218 | 31 May 2013 | 6/12/13 Notice of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Request for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies | |
ML13219A047 | 15 March 2012 | Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Incorporated by reference Aging Management |