MONTHYEARML19317D0762019-11-18018 November 2019 Summary of Meeting Near Vermont Yankee Power Station Regarding Establishment and Opration of Community Advisory Boards ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17143A1552017-06-0606 June 2017 Memorandum to C. Bladey Notice of Availability of Exemption for Entergy Energy Operations, Inc., Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML17045A5282017-05-25025 May 2017 Memo to C. Bladey Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation Exemption Requ ML17055A5042017-03-0101 March 2017 Revision of the NRC Vermont Yankee Decommissioning Webpage ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML14209A7052014-08-0606 August 2014 Letter to FEMA Requesting Review and Concurrence of Certain Proposed Entergy Nuclear Operations, Inc. Emergency Response Organization Changes to the Vermont Yankee Site Emergency Plan ML14209A9352014-07-24024 July 2014 1st Quarter 2014 Performance Review ML13150A2182013-05-31031 May 2013 6/12/13 Notice of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Request for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML12298A0882012-10-24024 October 2012 Forthcoming Meeting to Discuss Proposed License Amendment Request to Revise 10 CFR 50.63 Alternate AC Power Source to SBO EDG ML13219A0472012-03-15015 March 2012 Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis ML13127A3692012-03-15015 March 2012 Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis ML11321A2282011-11-17017 November 2011 Third Quarter 2011 Performance Review Memorandum ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1100502522011-02-0909 February 2011 Memo to Chairman Jaczko Fm R. W. Borchardt, EDO Initiatives for Improved Communication of Groundwater Incidents ML1030101362010-10-28028 October 2010 Memorandum and Order (Ruling on Motion to Reopen Proffering New Contention) (LBP-10-19) ML1009904582010-04-0808 April 2010 Deviation from the Reactor Oversight Process to Provide Increase NRC Oversight to Specific Issues at Vermont Yankee Nuclear Power Station ML1009603212010-04-0505 April 2010 Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Vermont Yankee ML1006401882010-03-0505 March 2010 Charter for the Groundwater Contamination Task Force ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML0915200092009-06-0808 June 2009 Forwarding of Supplement 1 to NUREG 1907 to the ACRS ML0913308232009-05-13013 May 2009 Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09 ML0904005422009-02-17017 February 2009 Audit Plan for Review of Confirmatory Analyses for the Core Spray and Reactor Recirculation Outlet Nozzles at the Vermont Yankee Nuclear Power Station ML0820601722008-08-0808 August 2008 Docketing of Additional Information Pertaining to the License Renewal Application of the Vermont Yankee Nuclear Power Station ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0805606272008-02-27027 February 2008 Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report ML0802205082008-01-31031 January 2008 01/08/2008 Summary of Meeting Between the NRC Staff and Entergy Nuclear Operations, Inc. to Discuss the Response to a Request for Additional Information Pertaining to the Vermont Yankee License Renewal ML0801505932008-01-17017 January 2008 December 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206 ML0733001522007-11-26026 November 2007 Summary of Telephone Conference Call Held on October 16, 2007, Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewa ML0721804332007-08-0808 August 2007 Summary of Telephone Conference Call Held on July 18, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Vermont Yankee Nuclear Power S ML0721805222007-08-0808 August 2007 Summary of Telephone Conference Call Held on June 29, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Vermont Yankee Nuclear Power St ML0718301872007-07-10010 July 2007 06/01/2007 Summary of Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning Items Pertaining to the Vermont Yankee License Renewal Safety Evaluation Report ML0716303702007-07-10010 July 2007 Trip Report Summarizing May 29, 2007 Visit to Vermont Yankee Nuclear Power Plant Regarding the License Renewal Environmental Review ML0713103192007-05-0808 May 2007 FRN - Plant License Renewal, June 5, 2007 ML0706101802007-05-0101 May 2007 Trip Report for a Trip Taken to Vermont, Massachusetts and New Hampshire ML0714104342007-04-25025 April 2007 Handouts to Applicants (Folder 3) ML0707406912007-04-0303 April 2007 ACRS Review of the Vermont Yankee Nuclear Power Station, License Renewal Application - Safety Evaluation Report ML0705305612007-02-20020 February 2007 Y020070028 - E-mail Hoch, NRR, to Becker, State of Vermont, Seismic and Flood Questions from Anr ML0704000852007-02-13013 February 2007 G20070068/LTR-07-0060/SECY-2007-0019 - Draft Supplemental Environmental Impact Statement for License Renewal of Vermont Yankee - Letters to Senator Leahy, Senator Sanders, Representative Welch from Luis Reyes ML0703605602006-11-0808 November 2006 Y020070028 - Informal Vermont Yankee Seismic and Hydrology Questions ML0627900712006-10-12012 October 2006 2006/10/12-Summary of a Telephone Conference Call Held on September 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Applicatio ML0627202182006-09-29029 September 2006 2006/09/29-Summary of a Telephone Conference Call Held on August 10, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0625801872006-09-14014 September 2006 2006/09/14-Audit Trip Report Regarding Entergy Nuclear Vermont Yankee, LLC, License Renewal Application for Vermont Yankee Power Station, Dated January 29, 2006 ML0617303972006-07-11011 July 2006 2006/07/11-Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Vermont Yankee Nuclear Power Station 2019-11-18
[Table view] Category:Safety Evaluation
MONTHYEARML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18242A6392018-10-11011 October 2018 Safety Evaluation of License Transfer Request (License DPR-28, Docket Nos. 50-271 and 72-59 ML18156A1802018-08-15015 August 2018 Enc 2 SER ISFSI Only Tech Spec Amendment Package ML18165A4232018-07-25025 July 2018 Issuance of Amendment to Change the Physical Security Plan to Reflect an ISFSI-Only Configuration ML18099A1662018-05-0101 May 2018 Entergy Vermont Yankee Quality Assurance Program Manual - Review and Acceptance of Changes ML18053A1132018-03-30030 March 2018 VY ISFSI Only EP Final SER - Jack Parrott ML17082A3102017-06-20020 June 2017 Request for Exemptions from 10 CFR 30.11 for Vermont Yankee Alternate Disposal of Low-Activity Waste Water at Us Ecology Idaho ML17013A3032016-12-12012 December 2016 Draft Final SER ML16165A4672016-06-16016 June 2016 Safety Evaluation of the Entergy Vermont Yankee, Quality Assurance Program Manual, Revision 4 ML16165A4662016-06-16016 June 2016 Quality Assurance Program Manual Vermont Yankee Nuclear Power Station and Independent Spent Fuel Storage Facility - Review and Acceptance of Changes ML16014A1692016-03-14014 March 2016 Vermont Yankee Nuclear Power Station - Issuance of Amendment No. 265 to Renewed Facility Operating License Re: Cyber Security Plan Implementation Schedule (CAC No. MF6403) ML16008B1032016-01-20020 January 2016 Evaluation of 10CFR 50.54(p)(2) Changes to the Security Plans ML15233A1662015-12-11011 December 2015 Issuance of Amendment No. 264 to Renewed Facility Operating License Changes to the Emergency Plan and Emergency Action Levels ML15292A2562015-11-0202 November 2015 Correction Letter Regarding Staff Review of Entergy'S Update to the Irradiated Fuel Management Plan ML15117A5512015-10-0707 October 2015 Issuance of Amendment for Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML15274A3792015-10-0505 October 2015 Review of Update to the Irradiated Fuel Management Plan ML15120A3152015-05-0707 May 2015 Relief Request ISI-06, Inservice Inspection Limited Examinations for the Fourth 10-Year Interval ML15097A3612015-04-16016 April 2015 Request for Consent to Cancel Lines of Credit ML14304A5882015-02-12012 February 2015 Issuance of Amendment No. 261, Revise Technical Specifications to Eliminate Certain Requirements During Movement of Irradiated Fuel and Core Alterations Consistent with TSTF-51 ML14346A0652015-02-0404 February 2015 Issuance of Amendment No. 261, Revise Site Emergency Plan for Permanently Defueled Condition to Reflect Change in On-Shift Staffing and Emergency Response Staffing ML14217A0722014-12-22022 December 2014 Issuance of Amendment No. 260, Revise and Remove Certain Requirements from Technical Specification Section 6.0, Administrative Controls, No Longer Applicable for Its Permanently Defueled Condition ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML13238A3982013-08-28028 August 2013 Relief Requests for the Fifth 10-Year Inservice Testing Program Interval ML13228A1972013-08-22022 August 2013 Relief Request ISI-05 - Fifth 10-Year ISI Interval - Alternative to Maintain Certain ISI Related Activities on 2001 Edition, 2003 Addenda ASME Section XI Code ML13212A2012013-08-15015 August 2013 Issuance of Amendment No. 258 Change to Licensing Basis Regarding Station Blackout ML13127A1762013-05-21021 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13105A1752013-04-26026 April 2013 Issuance of Amendment No. 257 Request to Revise Requirement of the Recirculation Pump Discharge Bypass Valves ML13042A2722013-04-17017 April 2013 Issuance of Amendment 256 Revision to License Condition 3.P and 3.S ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML13055A0092013-03-0101 March 2013 Relief Request ISI-PT-02 - Fourth 10-Year ISI Interval - Alternative to System Leakage Test for the Reactor Pressure Vessel Head Flange Leak-Off Lines ML1300903212013-01-30030 January 2013 Issuance of Amendment Rod Worth Minimizer Bypass Allowance TS Change (TAC No. Me 7927) ML1300902152013-01-30030 January 2013 Issuance of Amendment Change to Suppression Chamber Drywell Leak Rate Test Surveillance Frequency ML12261A2922012-11-13013 November 2012 Issuance of Amendment to Renewed Facility Operating License Cyber Security Plan Implementation Schedule Milestone ML1214501962012-05-31031 May 2012 Closeout of Bulletin 2011-01, Mitigating Strategies, ML1207601522012-03-28028 March 2012 Core Plate Hold Down Bolt Inspection Plan and Analysis - Vermont Yankee Nuclear Power Station ML1127904592011-11-0404 November 2011 Issuance of Amendment Revised Reactor Vessel Pressure-Temperature Limitation Curves ML1127205902011-09-30030 September 2011 Issuance of Emergency Amendment Modification of Technical Specification for Single Loop Operation ML1121014312011-08-25025 August 2011 Issuance of Amendment Elimination of Technical Specification Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool ML11152A0132011-07-20020 July 2011 License Amendment, Cyber Security Plan ML1103400782011-02-23023 February 2011 Issuance of Amendment Control Rod Block Actuation Logic System Functional Test ML1100601792011-02-0909 February 2011 Issuance of Amendment Regarding Modification to Technical Specification 4.12 as Result of Changes Made by License Amendment Nos. 230 and 239 and to Revise Wording in TS 3.7.A.8 ML1025717732010-10-0606 October 2010 License Amendment, Issuance of Amendment Scram Discharge Volume Vent and Drain Valves ML1026002492010-10-0101 October 2010 Relief Request VY-ISI-014, Alternative Examination Requirement for Nozzle-To-Vessel Weld and Inner Radius Using ASME Code Case N-702-Vermont Yankee Nuclear Power Station ML1004316132010-03-0808 March 2010 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML1001203062010-01-26026 January 2010 Issuance of Amendment Revision to Requirements for Inoperable Containment Isolation Valves ML0936208072010-01-22022 January 2010 Cover Letter, (Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point, Palisades, Pilgrim, and Vermont Yankee Nuclear Power St ML0936208952010-01-22022 January 2010 Safety Evaluation,(Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point,Palisades,Pilgrim, and Vermont Yankee Nuclear Power ML0933604432010-01-0404 January 2010 License Amendment 241 Revision of High Radiation Area Controls 2023-05-01
[Table view] |
Text
~<
January 8, 2001 MEMORANDUM TO: James W. Clifford, Section Chief Project Directorate 1-2 Division of Licensing and Project Management, NRR FROM: David C. Trimble, Section Chief IRA/
Equipment and Human Performance Branch Division of Inspection Program Management, NRR
SUBJECT:
SAFETY EVALUATION INPUT FOR ORDER APPROVING THE TRANSFER OF LICENSED OPERATING AUTHORITY FOR VERMONT YANKEE NUCLEAR POWER STATION (TAC NO. MB 3154)
Name: Vermont Yankee Nuclear Power Station Utility: Vermont Yankee Nuclear Power Corporation TAC No.:. MB 3154 Docket Nos: 50-271 Operating Licenses: DPR-28 Branch: PD1-2 Project Manager: R. Pulsifer Review Branch: IEHB Review Status: COMPLETE The Equipment and Human Performance Branch (IEHB) has reviewed the Vermont Yankee Nuclear Power Corporation (VYNPC) request for the transfer of Vermont Yankee Nuclear Power Station (VY) from VYNPC to Entergy Nuclear Vermont Yankee, LLC (Entergy Nuclear VY) to possess, and to Entergy Nuclear Operations, Inc. (ENO), to possess, use, and operate VY dated October 5, 2001.
The attached staff's safety evaluation (SE) addresses the areas of organization and management, and technical qualifications as described in the NRC Standard Review Plan (NUREG-0800), Chapter 13, Conduct of Operations, Section 13.1.1, "Management and Technical Support Organization," and Section 13.1.2-13.1.3, "Operating Organization." As stated in the attached SE, the staff concludes that VYNPC satisfied the requirements for license transfer, as they apply to the Entergy Nuclear VY and ENO management and technical support organization and operating organization, pursuant to 10 CFR 50.40 (b) and 10 CFR 50.80.
Attachment:
As stated
January 8, 2001 MEMORANDUM TO: James W. Clifford, Section Chief Project Directorate 1-2 Division of Licensing and Project Management, NRR FROM: David C. Trimble, Section Chief IRA!
Equipment and Human Performance Branch Division of Inspection Program Management, NRR
SUBJECT:
SAFETY EVALUATION INPUT FOR ORDER APPROVING THE TRANSFER OF LICENSED OPERATING AUTHORITY FOR VERMONT YANKEE NUCLEAR POWER STATION (TAC NO. MB 3154)
Name: Vermont Yankee Nuclear Power Station Utility: Vermont Yankee Nuclear Power Corporation TAC No.: MB 3154 Docket Nos: 50-271 Operating Licenses: DPR-28 Branch: PD1-2 Project Manager: R. Pulsifer Review Branch: IEHB Review Status: COMPLETE The Equipment and Human Performance Branch (IEHB) has reviewed the Vermont Yankee Nuclear Power Corporation (VYNPC) request for the transfer of Vermont Yankee Nuclear Power Station (VY) from VYNPC to Entergy Nuclear Vermont Yankee, LLC (Entergy Nuclear VY) to possess, and to Entergy Nuclear Operations, Inc. (ENO), to possess, use, and operate VY dated October 5, 2001.
The attached staff's safety evaluation (SE) addresses the areas of organization and management, and technical qualifications as described in the NRC Standard Review Plan (NUREG-0800), Chapter 13, Conduct of Operations, Section 13.1.1, "Management and Technical Support Organization," and Section 13.1.2-13.1.3, "Operating Organization." As stated in the attached SE, the staff concludes that VYNPC satisfied the requirements for license transfer, as they apply to the Entergy Nuclear VY and ENO management and technical support organization and operating organization, pursuant to 10 CFR 50.40 (b) and 10 CFR 50.80.
Attachment:
As stated DISTRIBUTION:
Licensing Action/Transfer folder R. Pulsifer Accession #: ML020070273 Office IOHS:IEHB IOHS:IEHB Name R Pelton D Trimble Date 01/07/02 01/08/02 OFFICIAL RECORD COPY
SAFETY EVALUATION INPUT FOR ORDER APPROVING THE TRANSFER OF LICENSED OPERATING AUTHORITY FOR VERMONT YANKEE NUCLEAR POWER STATION 1.0
Introduction:
In a letter dated October 5, 2001, Vermont Yankee Nuclear Power Corporation (VYNPC)
Entergy Nuclear Vermont Yankee, LLC (Entergy Nuclear VY), and Entergy Nuclear operations, Inc. (ENO) submitted a request for the transfer of Facility Operating License DPR-28 from VYNPC to Entergy Nuclear VY and ENO. VYNPC, Entergy Nuclear VY and ENO, collectively, will be referred to as the applicants. In addition, the applicants also request conforming amendments to Facility Operating License DPR-28 to delete references to VYNPC and to authorize Entergy Nuclear VY to possess and ENO to possess, use, and operate the Vermont Yankee Nuclear Power Station (VY), under the same conditions and authorizations included in the current license.
2.0 Evaluation
The staff used the following regulations and guidance during the technical qualification evaluation: 10 CFR 50.40(b), "Common Standards," Standard Review Plan (SRP) NUREG-0800, Section 13.1.1, "Management and Technical Support Organization," SRP, Sections 13.1.2-13.1.3, "Operating Organizations," and ANSI N18.1-1971, "Selection and Training of Nuclear Power Plant Personnel."
Purpose of the Evaluation The purpose of this evaluation is to ensure that the proposed corporate management is involved with, informed of, and dedicated to the safe operation of the plant and that sufficient, qualified technical resources will be provided to support safe plant operation and maintenance; and to evaluate proposed changes to the operating organization that may occur as a result of the license transfer.
Evaluation: Management and Technical Support Organization The staff reviewed the applicant's submittal to determine the acceptability of the proposed corporate management and technical support organization. The staff evaluated the submittal using the applicable acceptance criteria contained in Standard Review Plan, Chapter 13, "Conduct of Operations," Section 13.1.1, "Management and Technical Support Organization."
ATTACHMENT
The applicants stated "The organizational structure provides for the integrated management of the activities that support the operation and maintenance of Vermont Yankee. Clear management control, clear lines of authority, and effective communications exist between the organizational units involved in the management, operations, and technical support for operation of Vermont Yankee. The only anticipated changes will be that the senior officer at the site (Site Vice President-Operations) will report to the Senior Vice President and Chief Operating Officer of ENO rather than the President of VYNPC. Sufficient experience and availability of personnel exist to implement the responsibility for technical support of Vermont Yankee ....The Chief Nuclear Officer will be clearly responsible for nuclear activities and will be free of ambiguous assignments of primary responsibility without ancillary responsibilities that might detract from nuclear safety matters."
Based on the applicant's submittal, the applicant has shown and described its organization for managing and its means for providing technical support to the plant staff that will be essentially equivalent to the current qualifications of the VYNPC management and technical support organization, regarding which the staff is aware of no deficiencies. Accordingly, the staff concludes that the proposed ENO organization for managing and its means of providing technical support for the continued operation of VY under both normal and off-normal conditions are in accordance with Standard Review Plan, Chapter 13, "Conduct of Operations, Section 13.1.1, "Management and Technical Organization.
Evaluation: Operating Organization The staff reviewed applicant's submittal to determine the acceptability of the ENO operating organization and to evaluate changes to the operating organization proposed as a' result of the license transfer. The initial operating organization was determined to be acceptable by the initial licensing review. Subsequent safety-related changes to the operating organization should have been evaluated with an appropriate methodology. Therefore, the existing operating organization remains acceptable. The staff's review focused on evaluating any changes to the operating organization proposed as a result of the transfer. The staff evaluated the applicant's submittal using the applicable acceptance criteria contained in Standard Review Plan, Chapter 13, "Conduct of Operations," Section 13.1.2-1.3, "Operating Organization."
In its October 5, 2001, submittal, the applicants indicated that, "All regular employees of the VYNPC will be offered employment with ENO. Thus, no changes to the technical qualifications of the operating organization are expected. The position currently held by the senior officer on site will be renamed Vice President, Operations, Vermont Yankee, and will report to the Senior Vice President and Chief Operating Officer (COO) of ENO.. .The Senior Vice-President and COO of ENO will report to the President and CEO [Chief Executive Officer] of ENO ...who will also serve as the Chief Nuclear Officer. The nuclear operating organization will not otherwise be significantly affected by the transfer."
ATTACHMENT
Since substantially all of the operating organizations and personnel now responsible for the operation and maintenance of VY will be transferred to ENO, the staff concludes that ENO's onsite organizations established to operate and maintain VY under both normal and off-normal conditions are in accordance with Standard Review Plan, Chapter 13, "Conduct of Operations, Section 13.1.2-1.3, "Operating Organization."
3.0 Conclusions VYNPC has described the corporate level management and technical support organization and the onsite operating organizations responsible for the operation and maintenance of Vermont Yankee Nuclear Power Station after the transfer of licensed operating authority. The staff concludes that ENO will have an acceptable corporate organization, onsite organization, and adequate resources to provide technical support for the safe operation of the plants under both normal and off-normal conditions after the transfer of licensed operating authority from VYNPC to ENO. The VYNPC submittal adequately addresses the relevant requirements of 10 CFR 50.40 (b) and 10 CFR 50.80.
ATTACHMENT