- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance
Results
Other: BVY 06-065, License Renewal Application, Amendment 6, BVY 06-077, License Renewal Application, Amendment 9, BVY 06-095, E-mail: (PA-LR) Copy of SAMA Response, BVY-06-100, License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items, ML061040142, ML061730180, ML061740035, ML061740572, ML061770071, ML061920474, ML062680034, ML063120067, ML070230041, ML070710215, ML071430101, ML071840778, ML071840890
|
MONTHYEARBVY 05-110, Vermont - Supplement to the Annual Radiological Environmental Operating Report for Year 20042005-12-29029 December 2005 Vermont - Supplement to the Annual Radiological Environmental Operating Report for Year 2004 Project stage: Request ML0617302372005-12-31031 December 2005 Average Connecticut River Discharge (Cfs) at Vernon Station for the Year 2005 Project stage: Request ML0617302362005-12-31031 December 2005 VYNPS, Table 3. Vermont Yankee Effluent and Waste Disposal Annual Report Project stage: Request ML0617701552005-12-31031 December 2005 VYNPS 2005 Waste Inventory Project stage: Request ML0617302872006-01-26026 January 2006 2005 Air Pollutant Emissions Inventory Report for Entergy Nuclear Vermont Yankee, LLC Project stage: Request ML0617302192006-02-0707 February 2006 Annual Groundwater Monitoring Report, Vermont Yankee Power Plant, Sms Site 99-2617 Vernon, Vermont Project stage: Request ML0617301802006-02-17017 February 2006 License Renewal SEIS Information Needs Project stage: Other ML0617303142006-02-27027 February 2006 VYNPS Operating Procedure OP 2180, Revision 39, Circulating Water/Cooling Tower Operation Project stage: Request ML0617701492006-03-14014 March 2006 2005 Annual Report of the Town of Hinsdale and the Hinsdale School District Project stage: Request ML0617302162006-03-28028 March 2006 Vernon VT FY2006 Municipality Reconciliation, Final Data Based on Final Education Grand Lists Project stage: Request ML0617302802006-03-30030 March 2006 NPDES Final Amended Permit 3-1199 Project stage: Request ML0617700702006-04-0404 April 2006 VYNPS Environmental Review Procedure, Nuclear Management Manual Fleet Procedure EN-EV-115, Rev. 4 Project stage: Request ML0617705932006-04-10010 April 2006 State of Vermont, Environmental Radiation Surveillance Report, 2005 Summary. Vermont Department of Health Office of Radiological Health Project stage: Request ML0610401422006-04-12012 April 2006 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Vermont Yankee Nuclear Power Station Project stage: Other ML0625400452006-04-27027 April 2006 Email: (PA) Request for Additional Information to Support the Staffs Severe Accident Mitigation Alternative Review for Vermont Yankee Nuclear Power Project stage: RAI ML0617701692006-04-27027 April 2006 VYNPS Emergency Diesel DG-1-1A Preventative Maintenance Logs Project stage: Request ML0617701622006-04-27027 April 2006 VYNPS Emergency Diesel Driven Fire Pump P-40-1A Preventative Maintenance Logs Project stage: Request ML0617701652006-04-27027 April 2006 VYNPS John Deere Diesel DG-3-1A Preventative Maintenance Logs Project stage: Request ML0617701592006-04-27027 April 2006 VYNPS Emergency Diesel DG-1-1B Preventative Maintenance Logs Project stage: Request ML0617700692006-05-0404 May 2006 VYNPS Email to L.Dewald Re Dry Fuel Storage Pad, Apron, and Ramps EN Ev 115 Envrionmental Review. March 20, 2006 Project stage: Request ML0617301882006-05-10010 May 2006 VYNPS, MSLRM Actual Maximum DR-53 Dose Calculations Utilizing ODCM Methodology Project stage: Request BVY 06-046, Annual 2005 Radioactive Effluent Release Report2006-05-15015 May 2006 Annual 2005 Radioactive Effluent Release Report Project stage: Request BVY 06-047, 2005 Annual Radiological Environmental Operating Report2006-05-15015 May 2006 2005 Annual Radiological Environmental Operating Report Project stage: Request ML0618803852006-05-22022 May 2006 Windham Regional Plan Draft, May 22, 2006 Project stage: Request ML0618804492006-05-23023 May 2006 VYNPS Public Service Board Testimony for Hydrogen Storage, Parking Area, and Security Barrier System Project stage: Request ML0617405532006-05-24024 May 2006 VYNPS Aerial Photos During Construction 1968-1971 Project stage: Request ML0618802112006-05-24024 May 2006 VYNPS Archeological Sensitivity of Assessment, Proposed Gas Storage Area and Access Road January 17, 2001 Project stage: Request ML0617301862006-05-24024 May 2006 VYNPS, DR-53 Location Exposure Rate Status-Pre Power Up, Pre and Post Shield Project stage: Request ML0617302402006-05-24024 May 2006 Vernon, VT School District, Actual FY05 School Revenue Project stage: Request ML0617302142006-05-24024 May 2006 Wsesu Annual Report 2005-2006 Project stage: Request ML0617701802006-05-25025 May 2006 VYNPS Diesel Fuel Oil Analyses Project stage: Request ML0617704052006-05-25025 May 2006 VYNPS Used Oil Management and Furnace Operation Summary, 2006 Project stage: Request ML0617404352006-05-25025 May 2006 Federal Facilities and Lands within 50 Miles of VYNPS Project stage: Request ML0617700672006-05-25025 May 2006 VYNPS Land Use Map, Vegetation and Cover Type, Delineated Site Wetlands, and Riparian Zone Project stage: Request ML0617701722006-05-25025 May 2006 VYNPS Air Emissions Record-Keeping Logs Project stage: Request ML0617704962006-05-25025 May 2006 VYNPS House Heating Boiler Nameplate Ratings, Fuel Consumption and Air Emissions Recordkeeping. 2001-2005 Project stage: Request ML0616400652006-05-26026 May 2006 Massachusetts Attorney Generals Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.S Application for Renewal of the Vermont Yankee Nuclear Power Plant Operating License and Petition Project stage: Request ML0615205062006-06-0101 June 2006 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for the Vermont Yankee Nuclear Power Station Project stage: RAI ML0618400362006-06-0606 June 2006 VYNPS Environmental Scoping Open House Transcript Re. LRA Environmental Review, Pages 1-7 Project stage: Request ML0617904762006-06-0707 June 2006 Slides Used During the Scoping Meeting for VYNPS License Renewal Project stage: Meeting ML0618400332006-06-0707 June 2006 VYNPS Scoping Mtg Afternoon Transcript Re. LRA Environmental Review, Pages 1-116 Project stage: Request ML0618400292006-06-0707 June 2006 VYNPS Scoping Mtg Evening Transcript Re. LRA Environmental Review, Pages 1-143 Project stage: Request ML0619204742006-06-0707 June 2006 Comment (17) of E. Stamas on Environmental Scoping Process for Vermont Yankee Nuclear Power Station, License Renewal Project stage: Other ML0617401172006-06-12012 June 2006 Vermont Dept of Health Report on Cancer in Vermont Project stage: Request ML0617401132006-06-21021 June 2006 Vermont Municipal and Regional Planning and Development Act, as Amended Through 2004, Title 24 Vsa Chapter 117 Project stage: Request ML0617400352006-06-22022 June 2006 Comment (2) of Thomas Matsuda on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application Project stage: Other ML0617405722006-06-23023 June 2006 Comment (9) of Jon Block, on Behalf of Citizens Awareness Network, on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application Project stage: Other ML0617700712006-06-23023 June 2006 Comment (12) of Sunny Miller on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application Project stage: Other ML0618406152006-06-23023 June 2006 NRC Public Meeting to Discuss the Environmental Scoping Process of Vermont Yankee Nuclear Power Station, License Renewal Application, Feedback Project stage: Meeting ML0619204952006-07-11011 July 2006 Summary of Public Scoping Meeting Conducted Related to the Review of the Vermont Yankee Nuclear Power Station, License Renewal Application Project stage: Meeting 2006-05-15
[Table View] |
Text
Entergy Vermont Yankei e-.'
To:
Mike O'Brien From:
Lynn De Wald Date:
05/04/2006 Re:
Dry Fuel Storage Pad, Apron, and Ramps EN EV 115 Environmental Review
- Mike, Thanks for completing the site activity review form relative to the dry fuel storage pad project. I know that John Goodell from Southern Vermont Engineering has been involved in this project from the start and depending on the activity, he is well aware of the various potential permits the Station may need to apply for prior to starting work. Not surprisingly, since we will be disturbing an area in excess of 1 acre, John has already identified the need to apply for a storm water discharge permit from the Vermont Agency of Natural Resources and he filed the appropriate application on March 16, 2006. No other permits will be required for this project. Good luck.
Lynn De Wald Environmental Specialist 802-258-5526 1
NUCLEAR
.i:
MANAGEL
.MANUAL I
ATTACHMENT 9.2 ENVIRONMENTAL REVIEW FORM (TYPICAL)
SHEET 1 of 1
- 1. Facility:
J~ftc1.
'cz,/.,LZ
- 2. Document Number:
- 3. ERNumber:
- 4. Activity Reviewed:
whrq (salcb eac oite):
- 5. CompleteiScreening Below (as applicable to each site):
Reference Within Scope Modificat ion/Revlsion/
Approval Needed Section 2.0[1] References 0 Yes E0 No 0 N/A Section 2.0[2] References 0 Yes 0 No 0 NIA 0
Section 2.0[4] References (ANO) 0 Yes 0 No 0 NIA 0 Yes 0 No Section 2.0[5] References (GGNS) 0 Yes 0 No 0 N/A 0 Yes 0 No Section 2.0[6] References (IP2) 0 Yes 0 No 0 N/A 0 Yes 0 No Section 2.0[7] References (IP3) 0 Yes 0 No 0 N/A 0 Yes 0 No Section 2.0[8] References (JAF) 0 Yes 0 No 0 N/A 0 Yes 0 No Section 2.019] References (PNPS) 0 Yes 0 No 0 N/A 0 Yes 0 No Section 2.0[10] References (RBS)
[0 Yes 0 No 0 N/A 0 Yes 0 No Section 2.0[11] References (VYNPS) 0 Yes 0 No 0 N/A 0 Yes 0 No Section 2.0[12] References (W3) 0] Yes
[] No 0] N/A
[] Yes 0] No
- 6.
If within scope, attach cited reference(s) and appropriate section(s) along with a brief discussion:
- 7.
If a modification, revision or approval is needed, attach a brief discussjn:
- 8. Prepared By:
A"D atee
- 7-"p
ATTACHMENT 9.1 SITE ACTIviTY REVIEW FORM (TYPICAL)
SHEET I of I Check Appropriate Box(es) for Activity Being Performed:
(Attachment 9.4 provides a brief description of the screening regulatory basis for the activities listed below.)
- 1.
13 Land disturbance In excess of one acre (i.e., grading activities, construction of buildings, excavations, reforestation, creation or removal of ponds).
- 2.
0 Any land disturbance of undisturbed land areas (i.e., grading activities, construction, excavations, reforestation, creating, or removing ponds).
- 3.
0 Dredging activities in a lake, river, pond, ditches or stream.
- 4.
E0 Changing the amount of thermal heat being discharged to the river or lake (i.e., associated with once through and closed cycle cooling wastewater discharges).
- 5.
0]
Changing the concentration or quantity of chemicals being discharged to the river, lake, or air (i.e., associated with wastewater and air emission discharges).
- 6.
0 Discharging new or different chemicals that are currently not authorized for use by the state regulatory agency (i.e., associated with wastewater discharges).
- 7.
0 Changing the design or operation of the intake or discharge structures (i.e., increase water withdrawal flow at Intake structure or discharge flow at discharge structure).
- 8.
0 Modifying the design or operation of the cooling tower that will change water or air flow characteristics.
- 9.
0 Modifying the design or operation of the plant that will change the path of an existing water discharge or that will result In a new water discharge (i.e., associated with wastewater discharges).
- 10.
0 Modifying existing stationary fuel burning equipment that could potentially result In an Increase of air emissions (i.e., diesel fuel oil, butane, gasoline, propane, and kerosene).
- 11.
0 Installing or removing stationary fuel burning equipment or using portable fuel burning equipment (i.e., diesel fuel oil, butane, gasoline, propane, and kerosene).
- 12.
0 Installing or using equipment that will result in an air emission discharge (i.e., ozone, VOC, particulates, sulfur dioxide, carbon monoxide, nitrogen oxide).
- 13.
0 Installing or modifying a stationary or mobile tank (i.e., fuel oil, gasoline, kerosene, propane, butane, sulfuric acid).
- 14.
0 Using or storing oils or chemicals in containers >55 gallons that could be directly released into the environment.
- 15.
0 Burying or placing any solid wastes In the site area that may affect runoff, surface water, or groundwater.
- 16.
0]
Generates a new hazardous waste stream or increases an existing hazardous waste stream.
Prepared By:
J. Micha'el O'Brien... I - mylS 4:2-ate: 03/10/2006 Approved By:,
t Date:
NOTE: Completed form must be reviewed and approved by site environmental department lead prior to starting the activity.
AAWI4 of
?S-O
DeWald, Lynn From:
John Goodell [jgoodell@SVEASSOC.com]
Sent:
Tuesday, April 18, 2006 3:13 PM To:
O'Brien, Michael Cc:
Hoffman, John; DeWald, Lynn; 'Peter Van Oot'; 'Suzanne Monte'
Subject:
Stormwater Permit Update for DFS Project
- Mike, Here's a summary of where the DFS Project Stands with regard to Stormwater Permitting:
Stormwater Operating Permit (Coverage Under VT General Permit No. 3-9015)
Background:
Application Sent: 3-16-06 Application Logged In: 3-22-06 Current Status: Waiting for Technical Review I spoke with Dan Mason, DEC Environmental Analyst, about our project and the importance the project is not delayed past 5-8-06. 1 can say with good confidence that he is aware of the pressing need that the project not be delayed any further.
That said, he currently has 2 projects ahead of ours that have (also) been identified by the Commissioner as "high priority". Currently he expects to finish those project this week and to get to ours at the end of the week.
Pressing on this, he though that this was a reasonable expectation. Assuming he is able to start the review at the end of this week, or the first part of next week, it is reasonable to expect him to be able to issue a draft permit by 4-27, such that the final permit can be issued on 5-8-06.
At this point, it looks like we will have the final stormwater permit - or it will be in the process of being issued - by 5-8-06.
Our conversation was cordial, and I don't think any additional pressure from above, at this point, will improve the schedule.
Proposed VT Construction General Permit # 3-9020 This is a proposed permit for runoff from construction sites that is expected to be issued sometime after June 16, 2006, when the public comment period ends. This permit will require construction sites that disturb 1 acre or more to obtain coverage (current limit 5 acres). Once the permit is issued the project must implement the basic erosion control procedures listed in the VT Low Risk Site Handbook (
http://wwvwv.anr.state.vt.us/dec/vaterq/stormwater/docs/construction/swlowris ksitehandbook-draft.pdf
<http://www.anr.state.vt.us/dec/waterq/stormwater/docs/construction/swlowri sksitehandbook-draft.pdf> ) - if it has not already. For the DFS project, the erosion procedures shown in Exhibit Entergy
- I (sheets 2/3, 3/3) meet the basic technical requirements, however the handbook will also require the limits of the project be delineated. After the effective date of the permit, the project will have 60 days to file for coverage under the new permit. Given the potential for delay, I would recommend we have the application ready for when the permit is issued, and that we have already implemented all expected procedures of the new permit.