MONTHYEARML21075A1582021-03-15015 March 2021 E-mail from T. Silko to J. Parrott, NMSS, Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request ML21006A0242020-12-22022 December 2020 E-mail from J. Parrott to J. Tierney and N. Creed Vermont Yankee Request to NRC for Alternate Disposal of Wastewater ML20358A0702020-12-22022 December 2020 E-mail Acceptance Review for Request for Indirect License Transfer (License DPR-28, Docket No. 50-271) ML20175A2122020-06-23023 June 2020 Acceptance Review of Request for Alternate Disposal of Wastes Under 10 CFR 20.2002 (License DPR-28, Docket No. 50-271) ML19289A1292019-10-11011 October 2019 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML19288A0292019-10-11011 October 2019 NRC Acceptance Review - Northstar Request for Exemption from 10 CFR 20, App G, Section Iii.E (License DPR-28, Docket No. 50-271) ML19198A2512019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18289A3622018-10-11011 October 2018 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML18127A5582018-04-25025 April 2018 Email to State of Vermont on Vermont Yankee Nuclear Power Station - Forthcoming Issuance of a License Amendment Regarding the Requirement for the VYNPS to Have a Cyber Security Plan ML18045A0862018-01-25025 January 2018 Email Request for Review of the Draft Safety Evaluation for Implementation of a Revised Emergency Plan at Vermont Yankee to Reflect an ISFSI-only Configuration ML17353A0092017-12-18018 December 2017 E-Mail from William Irwin, Vermont Department of Health to Y. Chen/Dsfm Response: Draft Environmental Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17289A4222017-10-16016 October 2017 E-Mail from Y. J. Chen to W. Irwin Draft Environmental Assessment Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17257A0022017-09-14014 September 2017 Email to VY Shpo W Ltr Re VYNPS Exemption Load Campaign - Sept 2017 ML17229B4842017-08-16016 August 2017 Request for Supplemental Documentation to Support Review of the Physical Security Plan ML17219A0472017-08-0303 August 2017 8/03/2017, E-Mail from Y. J. Chen/Nmss to T. B. Silko/Vermont Yankee Regarding Need for Additional Information Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated May 16, 2017 (ML17142A358) ML17144A0452017-05-23023 May 2017 5/23/2017, E-Mail to I. William/Vermont Dept. of Health from Y. Chen/Nrc Response: Draft Environment Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation (W/Attachment Ltr to Address Comments on EA) ML17080A4752017-03-16016 March 2017 3/16/2017, E-Mail from I. William/Vermont Department of Health to Yen-Ju Chen/Dsfm/Sflb, Providing Comments on Draft Environmental Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for CoC No. 72-1014, Amendm ML17055A6262017-02-24024 February 2017 Cover Email from VY Shpo W Concurrence on No Effects Determination ML17040A3372017-02-0909 February 2017 Email and Letter to Vermont Shpo ISFSI Exemption No Effects Determination ML17038A4682017-02-0707 February 2017 2/07/2017, E-mail from Yen-Ju Chen/NRC-DSFM to W. Irwin/Vermont Dept. of Health Draft Environment Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for Certificate of Compliance No. 72-1014, Amendment 10 ML17012A2472017-01-11011 January 2017 E-mail - State of Vermont Comments Regarding Vermont Yankee'S 10 CFR 20.2002 Request ML16349A2492016-12-13013 December 2016 E-Mail to T. B. Silko/Entergy from Yen-Ju Chen/Dsfm Regarding Need for Supplemental Information for Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated November 9, 2016 (ML16319A102) ML17013A2502016-12-12012 December 2016 Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste ML16231A0282016-08-11011 August 2016 Response to NRC Questions Related to Request for 20.2002 Disposal of Contaminated Water ML16231A2192016-07-28028 July 2016 Follow-up Questions Related to Entergy Request for 20.2002 Disposal of Contaminated Water ML16069A0952016-03-0303 March 2016 Request for 20.2002 Disposal, Request for Additional Information ML16053A5152016-02-17017 February 2016 Comment (037) of Emma Stamas on ANPR-26, 50, 52, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors ML15329A1802015-11-24024 November 2015 E-mail from J. Whited Draft RAIs Re Duke License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413 Through MF6422) ML15295A2132015-10-21021 October 2015 NRR E-mail Capture - VY RAI for Off-site Insurance Exemption (10 CFR 140.11) - MF3980 ML15289A6002015-09-24024 September 2015 La 3 - Vermont Yankee Draft Responses or Edits 9 24 15.docx ML15289A6012015-09-23023 September 2015 La 3 - Nrr_Vermont Yankee Nuclear Power Station Decommissioning Status.Docx ML15288A3532015-09-21021 September 2015 La 3 - VY Dtf LAR - Status ML15257A6172015-09-14014 September 2015 La 3 - Testing the New Profile for Vermont Yankee La 3 - Public ML15195A3592015-07-14014 July 2015 NRR E-mail Capture - Acceptance Review for Vermont Yankee Amendment -Revise Cyber Security Plan Implementation ML15289A0022015-06-17017 June 2015 La 3 - Question from Ma ML15289A5982015-06-0909 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 5 2015 Letter from Vermont, Vynpc, and Gmp to NRC Attached ML15289A0072015-06-0505 June 2015 La 3 - Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15289A2432015-06-0404 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 4 2015 Vermont Letter to NRC Attached ML15289A0062015-06-0404 June 2015 La 3 - FW: Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15288A3592015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3602015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3622015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A4822015-05-22022 May 2015 La 3 - Vermont Reply to NRC & Entergy Answers Re VY LA-3 ML15289A0042015-05-19019 May 2015 La 3 - New Proposal Dates for Phone Call with VT ML15289A0052015-05-11011 May 2015 La 3 - ML Numbers for Disbursement Letters for Vermont Yankee ML15289A5992015-05-0808 May 2015 La 3 - Call with State of VT ML15289A0032015-05-0707 May 2015 La 3 - Other than for Comanche Peak, ML15289A1252015-05-0606 May 2015 La 3 - FRN Review - VY Dtf Exemption ML15128A0232015-04-27027 April 2015 NRR E-mail Capture - Petitioners Response to Request for Comments on the Proposed Director'S Decision on the 2.206 Petition Regarding Financial Qualifications of Entergy 2021-03-15
[Table view] Category:Memoranda
MONTHYEARML19317D0762019-11-18018 November 2019 Summary of Meeting Near Vermont Yankee Power Station Regarding Establishment and Opration of Community Advisory Boards ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17143A1552017-06-0606 June 2017 Memorandum to C. Bladey Notice of Availability of Exemption for Entergy Energy Operations, Inc., Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML17045A5282017-05-25025 May 2017 Memo to C. Bladey Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation Exemption Requ ML17055A5042017-03-0101 March 2017 Revision of the NRC Vermont Yankee Decommissioning Webpage ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML14209A7052014-08-0606 August 2014 Letter to FEMA Requesting Review and Concurrence of Certain Proposed Entergy Nuclear Operations, Inc. Emergency Response Organization Changes to the Vermont Yankee Site Emergency Plan ML14209A9352014-07-24024 July 2014 1st Quarter 2014 Performance Review ML13150A2182013-05-31031 May 2013 6/12/13 Notice of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Request for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML12298A0882012-10-24024 October 2012 Forthcoming Meeting to Discuss Proposed License Amendment Request to Revise 10 CFR 50.63 Alternate AC Power Source to SBO EDG ML13219A0472012-03-15015 March 2012 Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis ML13127A3692012-03-15015 March 2012 Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis ML11321A2282011-11-17017 November 2011 Third Quarter 2011 Performance Review Memorandum ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1100502522011-02-0909 February 2011 Memo to Chairman Jaczko Fm R. W. Borchardt, EDO Initiatives for Improved Communication of Groundwater Incidents ML1030101362010-10-28028 October 2010 Memorandum and Order (Ruling on Motion to Reopen Proffering New Contention) (LBP-10-19) ML1009904582010-04-0808 April 2010 Deviation from the Reactor Oversight Process to Provide Increase NRC Oversight to Specific Issues at Vermont Yankee Nuclear Power Station ML1009603212010-04-0505 April 2010 Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Vermont Yankee ML1006401882010-03-0505 March 2010 Charter for the Groundwater Contamination Task Force ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML0915200092009-06-0808 June 2009 Forwarding of Supplement 1 to NUREG 1907 to the ACRS ML0913308232009-05-13013 May 2009 Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09 ML0904005422009-02-17017 February 2009 Audit Plan for Review of Confirmatory Analyses for the Core Spray and Reactor Recirculation Outlet Nozzles at the Vermont Yankee Nuclear Power Station ML0820601722008-08-0808 August 2008 Docketing of Additional Information Pertaining to the License Renewal Application of the Vermont Yankee Nuclear Power Station ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0805606272008-02-27027 February 2008 Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report ML0802205082008-01-31031 January 2008 01/08/2008 Summary of Meeting Between the NRC Staff and Entergy Nuclear Operations, Inc. to Discuss the Response to a Request for Additional Information Pertaining to the Vermont Yankee License Renewal ML0801505932008-01-17017 January 2008 December 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206 ML0733001522007-11-26026 November 2007 Summary of Telephone Conference Call Held on October 16, 2007, Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewa ML0721804332007-08-0808 August 2007 Summary of Telephone Conference Call Held on July 18, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Vermont Yankee Nuclear Power S ML0721805222007-08-0808 August 2007 Summary of Telephone Conference Call Held on June 29, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Vermont Yankee Nuclear Power St ML0718301872007-07-10010 July 2007 06/01/2007 Summary of Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning Items Pertaining to the Vermont Yankee License Renewal Safety Evaluation Report ML0716303702007-07-10010 July 2007 Trip Report Summarizing May 29, 2007 Visit to Vermont Yankee Nuclear Power Plant Regarding the License Renewal Environmental Review ML0713103192007-05-0808 May 2007 FRN - Plant License Renewal, June 5, 2007 ML0706101802007-05-0101 May 2007 Trip Report for a Trip Taken to Vermont, Massachusetts and New Hampshire ML0714104342007-04-25025 April 2007 Handouts to Applicants (Folder 3) ML0707406912007-04-0303 April 2007 ACRS Review of the Vermont Yankee Nuclear Power Station, License Renewal Application - Safety Evaluation Report ML0705305612007-02-20020 February 2007 Y020070028 - E-mail Hoch, NRR, to Becker, State of Vermont, Seismic and Flood Questions from Anr ML0704000852007-02-13013 February 2007 G20070068/LTR-07-0060/SECY-2007-0019 - Draft Supplemental Environmental Impact Statement for License Renewal of Vermont Yankee - Letters to Senator Leahy, Senator Sanders, Representative Welch from Luis Reyes ML0703605602006-11-0808 November 2006 Y020070028 - Informal Vermont Yankee Seismic and Hydrology Questions ML0627900712006-10-12012 October 2006 2006/10/12-Summary of a Telephone Conference Call Held on September 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Applicatio ML0627202182006-09-29029 September 2006 2006/09/29-Summary of a Telephone Conference Call Held on August 10, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0625801872006-09-14014 September 2006 2006/09/14-Audit Trip Report Regarding Entergy Nuclear Vermont Yankee, LLC, License Renewal Application for Vermont Yankee Power Station, Dated January 29, 2006 ML0617303972006-07-11011 July 2006 2006/07/11-Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Vermont Yankee Nuclear Power Station 2019-11-18
[Table view] |
Text
Joseph Hoch - Seismic and P66d7duestions from WNR- Pace 11I JoseDh Hoch-Seismic and Flood Questions from ANR Pa~e1 From: Joseph Hoch To: Laurence.Becker@state.vt.us Date: 2/20/2007 5:01:58 PM
Subject:
Seismic and Flood Questions from ANR
Dear Mr. Becker,
Thank you for the questions regarding Seismic and Flood issues at Vermont Yankee. I have been asked by Jim Shea to provide you a response.
Enclosed are your original questions and the response to those questions.
Thanks again, Joseph A. Hoch Physical Scientist U.S. Nuclear Regulatory Commission NRR/DORL/LPL1-2 301-415-3635
<Note: This Information does not convey a formal NRC staff position.>
CC: Harold Chemoff; James Kim; James Shea
Mail Envelope Properties (45DB6FD6.BE6: 2 : 9798)
Subject:
Seismic and Flood Questions from ANR Creation Date 2/20/2007 5:01:58 PM From: Joseph Hoch Created By: JAH6@nrc.gov Recipients Action Date & Time nrc.gov OWGWPO03.HQGWDO01 Delivered 2/20/2007 5:02:04 PM HKC CC (Harold Chemoff) Opened 2/21/2007 6:38:46 AM nrc.gov OWGWPOO4.HQGWDOO1 Delivered 2/20/2007 5:01:59 PM JSK CC (James Kim) Retracted 2/21/2007 6:54:16 AM nrc.gov TWGWPO02.HQGWDO01 Delivered 2/20/2007 5:02:05 PM JJS CC (James Shea) Opened 2/20/2007 6:19:54 PM state.vt.us Transferred 2/20/2007 5:02:35 PM Laurence.Becker (Laurence.Becker@ state.vt.us) Retract Requested Post Office Delivered Route OWGWPO03.HQGWDO01 2/20/2007 5:02:04 PM nrc.gov OWGWPO04.HQGWDO01 2/20/2007 5:01:59 PM nrc.gov TWGWPOO2.HQGWDOO1 2/20/2007 5:02:05 PM nrc.gov state.vt.us Files Size Date & Time MESSAGE 1334 2/20/2007 5:01:58 PM NRCQuestionsFlood.doc 24576 1/30/2007 2:07:56 PM NRCQuestionsSeismic.doc 28672 1/30/2007 2:07:56 PM VYresponse.doc 32256 2/20/2007 4:58:36 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No
Security: Standard To Be Delivered: Immediate Status Tracking: .Delivered & Opened
Agency of Natural Resources Department of Environmental Conservation MEMORANDUM Date: November 8, 2006
Subject:
Entergy-Vermont Yankee - Flood Questions The purpose of this memorandum is to set forth a brief outline of ANR questions regarding flood issues and the Entergy Vermont Yankee Nuclear Power Plant.
The Design Basis for External Events (DB) relating to floods is a Probable Maximum Flood (PMF) of 480,100 cfs. How was this PMF calculated? What assumptions were made to calculate the PMF for this plant? What NRC standards and/or methodologies were used to arrive at this PMF?
- Does the DB analysis for External Events consider the impacts of inundation related to changes in the river channel including sedimentation, debris deposition and catastrophic erosion potential? If not, why not?
- What is the proper standard of design basis protection for extending the license of a nuclear power plant?
Has NRC evaluated whether the age and current physical condition of the facility make it any more susceptible to External Events, including Design Basis External Events, such as, Flood and Earthquake?
Agency of Natural Resources Department of Environmental Conservation MEMORANDUM Date: November 8, 2006
Subject:
Entergy-Vermont Yankee - Seismic Questions The purpose of this memorandum is to set forth a brief outline of ANR questions regarding seismic issues and the Entergy Vermont Yankee Nuclear Power Plant.
VY received a license to operate in 1972 and is designed for operation to conform to Atomic Energy Commission requirements of April 1968. The maximum ground accelerations at the site are specified as a 0.14g (14% of the acceleration of gravity) Safe Shutdown Earthquake (SSE) and a 0.07g (7% of the acceleration of gravity) Operating Basis Earthquake (OBE).
- What return interval, spectra, and accelerations were employed to predict shaking at the site?
" How were these calculations used to determine accelerations as a percent of gravity for an Operating Basis Earthquake (OBE) and the Safe Shutdown Earthquake (SSE)? Please show the calculations for both the OBE and SSE determinations. From the above calculations how were the OBE and SSE established for the design basis? Please be specific about the NRC criteria used to establish these design basis parameters.
" In the late 1990's, the core shroud repair design utilized a USNRC Regulatory Guide 1.60 rev. I (1973) response spectrum input for the repair seismic analysis. How does the overall 1973 guidance compare with the late 1960's design basis criteria? If there is a difference, please be specific about the difference? If there is a difference are the 1973 criteria going to be applied to the design basis analysis for re-licensing?
" On June 28, 1991, NRC issued Generic Letter 88-20, Supplement 4, "Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities, 10 CFR 50.54(0, and NUREG-1407, "Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities. A Seismic Margins Assessment (SMA) was conducted at Vermont Yankee subsequent to these NRC releases also in conjunction with document EPRI NP-6041 guidance. ANR understands that the guidance employed a 0.30g review level earthquake for the plant examination.
How does this 0.30g review level compare to the 0.14g SSE level? If this is a higher standard is it going to be employed in the design basis review for re-licensing?
" What is the proper standard of design basis protection for extending the license of a nuclear power plant?
" Has NRC evaluated whether the age and current physical condition of the facility make it any more susceptible to External Events, including Design Basis External Events, such as, Earthquake and Flood?
L. Becker Mr. Larry Becker Vermont State Geologist and Director 103 South Main Street Waterbury, VT 05671-2420
Dear Mr. Becker:
Thank you for bringing your concerns to the Nuclear Regulatory Commission (NRC). Your email dated November 7, 2006, to James Shea, NRC Project Manager for Vermont Yankee, has been referred to me for response. For your information, James Kim is the current acting Project Manager for Vermont Yankee. In your email, you presented questions regarding flooding and seismic issues at the Vermont Yankee Nuclear Power Plant in Vernon, Vermont.
Several of your questions pertain to how the licensee derived the Design Basis for External Events relating to floods and earthquakes. Nuclear facilities are designed and built in accordance with NRC regulations to protect against design basis natural phenomena. Design basis natural phenomena are events, such as earthquakes and or floods, that a nuclear facility is designed to withstand without functional loss of systems, structures, and components necessary to safely shutdown the plant and stay in a safe shutdown condition to ensure public health and safety. The methods used by the licensee, and accepted by the staff, pursuant to 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," are documented in the licensee's Updated Final Safety Evaluation (UFSAR) Revision 21.
Section 2.4.3.4 of the UFSAR pertains to floods and Section 2.5.3 of the UFSAR pertains to seismology.
NRC's guidance on determining design basis flood and seismic characteristics for currently operating facilities is provided in Regulatory Guide 1.59 (ML003740388), "Design Basis Floods for Nuclear Power Plants," and Regulatory Guide 1.60 (ML003740207), "Design Response Spectra for Seismic Design of Nuclear Power Plants," respectively. These guides contain the technical details that should address the issues you raised.
Many of your other questions pertain to the license renewal process. The NRC has established a timely license renewal process and clear requirements, codified in 10 CFR Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions," and 10 CFR Part 54, "Requirements for Renewal of Operating Licenses For Nuclear Power Plants," that are needed to assure safe plant operation for extended plant life. Before submission of a renewal application, an applicant should have analyzed the management of aging effects in sufficient detail to conclude that the plant can be operated safely during the period of extended operation. The renewal application is the principal document in which the applicant provides the information needed to understand the basis upon which this conclusion has been reached, and includes general information and technical information in compliance with 10 CFR Part 54. The license renewal application contains technical information and evaluations about the different types of plant aging that might be encountered in the specific plant and how the licensee will manage, or mitigate, those aging effects. The NRC staff performs a safety review of the information provided in the application, requesting additional information from the applicant as necessary, and draws conclusions about whether the plant can be operated during the period of extended operation without undue risk to health and safety of the public. Additional information on the license renewal process can be found on the NRC website at:
http://www.nrc.gov/reactorsloperatingllicensing/renewal.html.
I would also like to draw your attention to an Atomic Safety and Licensing Board (ASLB) ruling issued on November 22, 2004 (ML043280053) regarding the following contention during the Vermont Yankee Extended Power Uprate (EPU) license amendment process:
L. Becker Because Applicant is VoluntarilySeeking a Change In Design or Licensing Basis, It Should Comply With Current,More Restrictive Practices Which Relate to the ProposedDesign or Licensing Basis Change in Orderto Demonstrate That it Will Provide Adequate Protection to the Health and Safety of the Public as Required By 42 U.S.C. § 2232(a).
The ASLB ruled that this contention was not admissible under the backfit rule, 10 CFR 50.109, "Backfitting." This regulation states that the NRC is prohibited from imposing new or amended licensing standards on existing licensees except under limited circumstances, such as where the NRC does a "systematic and documented analysis" and determines "that there is a substantial increase in overall protection of the public health and safety or the common defense and security to be derived from the backfit and that the direct and indirect costs of the implementation for that facility are justified." The ASLB concluded, with regard to seismic issues raised, that "the Vermont Yankee plant is already subject to stringent seismic and structural standards and the State has offered nothing to suggest an
'incompatibility between them and the proposed license amendment."
Thank you for bringing your questions to the NRC. The NRC's mission is to regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. I hope that the information provided is useful and addresses your questions.
Sincerely, Joseph A. Hoch, Physical Scientist Plant Licensing Branch 1-2 (LPL1 -2)
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation