Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07143047019 April 2007Third Handout for April 19, 2007 Clarification Call Concerning Shearon Harris Transition to NFPA 805Safe Shutdown
Multiple Spurious Operation
ML07165052323 May 2007Enclosure 2 - Licensee Slides, Harris Nuclear Plant, NRC Annual Assessment Meeting, 05/23/2007Weld Overlay
Hemyc
Siren
ML07165052623 May 2007Enclosure 1 - NRC Slides, NRC CY2006 Annual Assessment Meeting, Apex, North Carolina, May 23, 2007License Renewal
ML07165053521 May 2007Enclosure - Slides for NRC CY2006 Annual Assessment Meeting
ML07178039530 May 2007(HNP) Fire PRA Demonstrations. Handout Reference for May 30-June 1, 2007, Fire Protection Transition Pilot Plant Observation VisitFire Barrier
Fuel cladding
ML07178045930 May 2007Proposed Schedule 2007. Handout Reference for May 30-June 1, 2007, Fire Protection Transition Pilot Plant Observation Visit
ML07221004126 July 2007Meeting Slides NRC Region Meeting Robinson Nuclear Plant.Past operability
Coatings
B.5.b
Integrated leak rate test
Pandemic
Siren
ML07240002523 August 2007NFPA 806 Transition Pilot Plant FAQ Log - July 2007, Revision 2
ML07257031614 September 2007Public Outreach Meeting Shearon Harris Nuclear Plant, Units 2 and 3, Combined License ApplicationEnvironmental Justice
ML0727801146 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Harris Transition Status - Briefing Materials/Meeting Handouts
ML0727801165 June 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Harris Nuclear Plant Change Evaluation Development - Briefing Materials/Meeting Handouts
ML07278011816 July 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Change Evaluations/Deficiency Resolution - 8/6/07 Slides - Briefing Materials/Meeting Handouts
ML0727801206 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Fire Pra/Fire Protection Program Interface - Progress Energy - Briefing Materials/Meeting HandoutsFire Protection Program
ML07278012417 July 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Post Transition Documentation - Progress Energy - Briefing Materials/Meeting Handouts
ML07278012626 July 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Meetings/Reviews Proposed Schedule - Progress Energy - Briefing Materials/Meeting Handouts
ML0727801386 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - NEI 04-02 FAQs Pathway to Resolution - Progress Energy - Briefing Materials/Meeting HandoutsOperator Manual Action
ML0727801447 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Non-Power Operations - Progress Energy - Briefing Materials/Meeting Handouts
ML0727801526 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Circuit Analysis Methodology - Progress Energy - Briefing Materials/Meeting HandoutsHot Short
Safe Shutdown
Multiple Spurious Operation
ML0727801556 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Risk-Informed Performance-Based Transition Change Evaluation Process - 8/7/07 Briefing Materials/Meeting HandoutsProbabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
ML0727801677 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Pilot Observation Target Selection - Progress Energy - Briefing Materials/Meeting Handouts
ML0727802846 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Harris Transition Status - Briefing Materials/Meeting Handouts
ML0727803137 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Non-Power Operation Transition - Duke Energy - Briefing Materials/Meeting HandoutsSafe Shutdown
Fire Watch
ML0727803199 August 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Risk-Informed Performance-Based Transition Change Evaluation Process - 8/9/07 Briefing Materials/Meeting HandoutsProbabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
ML07278032516 July 2007August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Change Evaluation/Deficiency Resolution - 8/9/07 Slides - Progress Energy - Briefing Materials/Meeting Handouts
ML07334091831 May 200705/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal
ML07351008212 November 2007NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version)Safe Shutdown
Fire Barrier
Fire Protection Program
ML07354026220 December 2007Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 0
ML0802803657 January 2008January 2008 - Harris Nuclear Plant, National Fire Protection Association (NFPA) 805 Transition, License Amendment Request/Transition Report, January 7, 2008Operator Manual Action
Fire Protection Program
ML0802804577 January 2008January 2008- Transition to National Fire Protection Association (NFPA) 805 - Draft Example Transition Report, Shearon Harris Nuclear Power Plant, Unit 1, January 7, 2008Safe Shutdown
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Hemyc
Fire Protection Program
ML0802805677 January 2008January 2008 - Transition to National Fire Protection Association (NFPA) 805 - Example Table B-1, Shearon Harris Nuclear Power Plant, Unit 1, January 7, 2008Safe Shutdown
Fire Barrier
Safe Shutdown Earthquake
Hemyc
Earthquake
Fire Protection Program
ML0802805747 January 2008January 2008 - Transition to National Fire Protection Association (NFPA) 805 - Example Table B-2, Shearon Harris Nuclear Power Plant, Unit 1, January 7, 2008Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Emergency Lighting
Thermoset
Earthquake
Manual Operator Action
ML0802806218 January 2008January 2008 - Transition to National Fire Protection Association (NFPA) 805 - Post Transition Documentation, Shearon Harris Nuclear Power Plant, Unit 1, January 7, 2008
ML08046015430 January 200801/30/2008 Slides Used During Dseis Meeting Related to the License Renewal Review of Shearon Harris Nuclear Power PlantLicense Renewal
Environmental Justice
ML08094001027 March 2008Public Meeting Slides for 03/27/08, Plant Status Update
ML08120033417 April 2008NFPA 805 Transition Pilot Plant FAQ Log - April 2008Hot Short
ML0813706307 May 2008Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007
ML08184073120 June 2008NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons LearnedHemyc
ML08184073520 June 2008NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned
ML08205038614 April 2008April 2008 Observation Visit - Oconee/Shearon Harris - Pilot Plant Transition to NFPA 805 - F and O Resolution/Peer Review
ML08205039015 April 2008April 2008 Observation Visit - Shearon Harris - Pilot Plant Transition to NFPA 805 - Fire Safety Analysis/Change Evaluation UpdateSafe Shutdown
Probabilistic Risk Assessment
Operator Manual Action
Hemyc
ML08205040216 April 2008April 2008 Observation Visit - Shearon Harris -Pilot Plant Transition to NFPA 805 - Performance Monitoring ProgramFire Barrier
Emergency Lighting
Fire Watch
ML08205040711 April 2008April 2008 Observation Visit - Shearon Harris - Pilot Plant Transition to NFPA 805 - Performance CriteriaFire Barrier
ML08207039117 July 2008Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805Safe Shutdown
Fire Protection Program
ML08296015317 November 2008Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment RequestProbabilistic Risk Assessment
Operator Manual Action
Emergency Lighting
Hemyc
Fire Protection Program
ML08308000531 October 2008Meeting Slides, Progress Energy Public Meeting, NRC Region II VisitB.5.b
License Renewal
Dissimilar Metal Weld
Power change
Siren
Power Uprate
ML09015042425 August 2004Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites
ML09049061218 February 2009NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, February, 2009
ML0912706526 May 2009Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2
ML09166050424 June 200904/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805Hot Short
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Continuous fire watch
Fire Watch
ML09229003417 August 200908/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory PerspectiveFire Protection Program