Enclosure 1 - NRC Slides, NRC CY2006 Annual Assessment Meeting, Apex, North Carolina, May 23, 2007
ML071650526
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/23/2007
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML071650515 List:
References
Download: ML071650526 (17)


Text

NRC CY2006 Annual Assessment Meeting HARRIS Apex, North Carolina May 23, 2007

Purpose of Todays Meeting

  • A public forum for discussion of Harris performance
  • NRC will discuss Harris performance issues identified in the annual assessment letter to Progress Energy
  • Harris management will be given the opportunity to respond to the information in the letter and discuss new or existing programs to maintain or improve their performance

Agenda

  • Introduction
  • Review of Reactor Oversight Process
  • National Summary of Plant Performance
  • Discussion of Harris Plant Performance Results
  • Harris Management Remarks
  • Questions and Answers

Region II Organization William Travers Regional Administrator Victor McCree Deputy Regional Administrator Charles Casto Joseph Shea Director Division of Reactor Projects Director Division of Reactor Safety Harold Christensen Kriss Kennedy Deputy Director Deputy Director Randall Musser Regional Specialists Branch Chief Harris Resident Inspectors Project Engineer Son Ninh Phil OBryan Mike King

NRC Performance Goals PRIMARY GOALS Ensure protection of the public health and safety and the environment Ensure the secure use and management of radioactive materials OTHER GOALS

  • Ensure openness in NRC regulatory process
  • Ensure that NRC actions are effective, efficient, realistic, and timely
  • Ensure excellence in NRC management to carry out the NRCs strategic objective

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Quarterly Fire Protection ~15 hrs every quarter z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Performance Thresholds Safety Significance Green: Very low safety issue White: Low-to-moderate safety issue Yellow: Substantial safety issue Red: High safety issue NRC Inspection Efforts Green: Only Baseline Inspections White: May increase NRC oversight Yellow: Increased NRC oversight Red: Increased NRC oversight and other NRC actions

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2006 Licensee Response 70 Regulatory Response 24 Degraded Cornerstone 6 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103

Harris CY2006 Inspection Activities

  • 4,667 hours0.00772 days <br />0.185 hours <br />0.0011 weeks <br />2.537935e-4 months <br /> of inspection related activities
  • Resident inspector daily inspections
  • Reactor operator initial exam
  • Engineering modifications inspection
  • Fire Protection inspections
  • Security inspection
  • Radiation protection inspection (Occupational)
  • Maintenance inspections
  • Engineering design bases inspection

Harris CY2006 Assessment Results

  • Harris performance was within the Licensee Response Column of the NRCs Action Matrix.
  • All inspection findings were classified as very low safety significance (Green).
  • All performance indicators (PI) were Green.

Harris Assessment Summary

  • Progress Energy operated Harris in a manner that preserved public health and safety.
  • All cornerstone objectives were met.
  • NRC plans baseline inspections at Harris for the remainder of CY 2007.

Harris CY2007 Scheduled Inspection Activities

  • Resident inspector daily inspections
  • Licensed operator requalification inspection
  • Radiation protection inspection
  • Problem identification and resolution inspection
  • Heat sink inspection
  • PWR containment sump blockage inspection
  • Inservice inspection (ASME code) evaluation

NRC CY2006 Annual Assessment Meeting HARRIS Apex, North Carolina May 23, 2007

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)