ML080280621

From kanterella
Jump to navigation Jump to search
January 2008 - Transition to National Fire Protection Association (NFPA) 805 - Post Transition Documentation, Shearon Harris Nuclear Power Plant, Unit 1, January 7, 2008
ML080280621
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/08/2008
From: Ertman J
Progress Energy Co
To:
Office of Nuclear Reactor Regulation
Oudinot D
References
Download: ML080280621 (1)


Text

SSEL Circuit Analysis Results SSA Logic FSSPMD DATA PRA Equipment and Data Non-Power Equipment and Data FSSPMD / FHA OTHER SOFTWARE CAFTA / ARC SOFTWARE NFPA 805 TRANSITION FIRE SAFETY ANALYSIS Fire Area Description FHA information Nuclear Safety Performance Criteria Compliance Summary NFPA 805 Transition NEI 04-02 B-3 Table Results **

PSA Impact Summary Non-Power Evaluation Results Summary Radioactive Release / Manual Firefighting Summary Change Evaluations Fire Area Defense in Depth Safety Margins / Sensitivity Analysis Monitoring Program Input FP Drawings FHA SUPPORT DOCUMENTATION FP Features Code Compliance Evaluations Engineering Equivalency Evaluations NSCA SUPPORT DOCUMENTATION Coordination Calculations /

MHIF MSO and OMA Treatment T-H Calculations Manual Action Feasibility Calculation NUCLEAR SAFETY CAPABILITY ASSESSMENT CALC SSA Drawings NFPA 805 Implementing EC NEW & REVISED PLANT DOCUMENTATION SSA Shutdown Procedures DBD Fire Fighting Pre-Fire Plans Compartment Fire Modeling Calculations FIRE PRA RESULTS Selected output documents NFPA 805 Compliance /

NEI 04-02 B-1, F, G, **

Tables Ignition Sources Fire Area Compliance Strategies FHA DATABASE DATA Fire Hazard Analysis Non-Power Operations Analysis Radioactive Release Review Results Fire PRA Input Data Transition Report / LAR NFPA 805 SER Revised License Condition Revised FSAR Progress Energy Draft 10/24/2007 SSA Methodology Procedure / B-2 Table reslults FIRE PRA RESULTS LAR Support e.g. OMAs Post Transition Documentation

    • Tables Incorporated into FSAR by reference