ML071650523

From kanterella
Jump to navigation Jump to search
Enclosure 2 - Licensee Slides, Harris Nuclear Plant, NRC Annual Assessment Meeting, 05/23/2007
ML071650523
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/23/2007
From:
Progress Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML071650515 List:
References
Download: ML071650523 (19)


Text

1 Harris Nuclear Plant NRC Annual Assessment Meeting May 23, 2007

2 Plant operation O20 years of safe, reliable operation OServing 550,000 homes every day OExcellent 2006 NRC performance rating

3 Operational Excellence NRC Reactor Oversight Process

4 INPO Performance Index by plant 1st Quarter 2007 99.72 50 60 70 80 90 100 Robinson Harris Summer Salem Point Beach Perry Monticello Braidwood Grand Gulf Waterford Diablo Canyon TMI Susquehanna Prairie Island Nine Mile Oyster Creek Surry Comanche Peak Hatch Pilgrim Millstone St. Lucie Davis Besse Catawba Turkey Point River Bend Duane Arnold Oconee Brunswick Fort Calhoun Palo Verde San Onofre Kewaunee Harris

5 The Facts on Unplanned shutdowns

6 Automatic and manual reactor trips Automatic and manual reactor trips 4

1 1

1 0

0 1

2 3

4 5

6 7

8 2003 2004 2005 2006 2007 YTD Harris

7 The Facts on Fire safety

8 Thermo-lag

9 Interam

10 Hemyc

11 Pre-test

12 During test

13 Post-test

14 Fire safety Fall 2010 - complete transition to NFPA-805

15 The Facts on Security

16 Harris Security Force Harris Security personnel O Highly-trained, 230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> of training before going on-shift We do not tolerate cheating O Entire guard force re-tested O Individuals involved no longer employed

17 Fall 2007 refueling Significant tasks OContainment sump OPressurizer weld overlay OFire protection modifications

18 Emergency Preparedness O Evacuation studies every two years O New battery-backup siren system; installation under way O Successfully completed FEMA graded exercise in April

19