MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19077A3672019-03-14014 March 2019 March 14, 2019 Pre-submittal Meeting TS DNBR Safety Limit Change LAR Meeting Slides ML18351A1342018-12-20020 December 2018 December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR ML18333A1822018-11-0808 November 2018 Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17250B2382017-08-30030 August 2017 TMRE Presubmittal NRC ML17044A0892017-03-0202 March 2017 EDG SR Presubmittal Meeting March 2, 2017 ML16267A0292016-09-29029 September 2016 SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13218B3372013-07-30030 July 2013 Handout for 7/30/13 Conference Call Re. Harris Emergency Response Facility Activation Timeliness and Criteria ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 ML13170A3352013-06-13013 June 2013 Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel ML12277A0272012-10-0202 October 2012 Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests ML12242A4322012-08-28028 August 2012 Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A0012012-04-16016 April 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML11354A3782012-02-0808 February 2012 Meeting Handout - Meeting with Carolina Power and Light Suggested Discussion Items Regarding Realistic Large Break Loss-of-Coolant Accident HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-0282012-01-11011 January 2012 Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 ML12076A1652012-01-11011 January 2012 Meeting Slides - Harris Realistic LBLOCA Question Response Meeting ML1118011132011-06-29029 June 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 1 ML1113704082011-05-0909 May 2011 Meeting Slides Regarding Human Performance Improvement ML1107301382011-04-21021 April 2011 February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides ML1111000242011-04-20020 April 2011 Meeting Summary - Shearon Harris - List of Attendees ML1014102712010-05-18018 May 2010 Shearon Harris Nuclear Plant Annual Assessment Meeting Slides ML0922900342009-08-17017 August 2009 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0904906122009-02-18018 February 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, February, 2009 ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0818407352008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned ML0818407312008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned ML0812003342008-04-17017 April 2008 NFPA 805 Transition Pilot Plant FAQ Log - April 2008 2024-04-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML23114A0672023-04-26026 April 2023 April 26 2023 Public Meeting - RIPE LAR - Licensee Slides ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20099D1282020-04-0808 April 2020 Bru 2019 Mtg Slides ML20099C9992020-04-0808 April 2020 Har 2019 Mtg Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19233A0462019-08-21021 August 2019 Presentation: Harris/Nrc Pre-submittal Meeting: Risk-Informed Completion Times, August 22, 2019 ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML18351A1342018-12-20020 December 2018 December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR ML18333A1822018-11-0808 November 2018 Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17318A1592017-11-0808 November 2017 Meeting Slides - November 8, 2017 Teleconference with NEI Concerning Feedback on Tornado Missile Risk Evaluator Methodology -Final ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16267A0292016-09-29029 September 2016 SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 ML13170A3352013-06-13013 June 2013 Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel ML12277A0272012-10-0202 October 2012 Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests ML12242A4322012-08-28028 August 2012 Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12076A1652012-01-11011 January 2012 Meeting Slides - Harris Realistic LBLOCA Question Response Meeting HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-0282012-01-11011 January 2012 Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 ML11354A2912011-12-13013 December 2011 Meeting Slides - Meeting with Carolina Power and Light Discussion of ANP-3011 ML1113704082011-05-0909 May 2011 Meeting Slides Regarding Human Performance Improvement ML1107301382011-04-21021 April 2011 February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides ML1111000262011-04-20020 April 2011 Meeting Summary - Shearon Harris - Slide Presentation ML1014102712010-05-18018 May 2010 Shearon Harris Nuclear Plant Annual Assessment Meeting Slides ML0922900342009-08-17017 August 2009 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0915905552009-06-0505 June 2009 Summary of Category 1 Public Meeting to Discuss Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0818407312008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned ML0818407352008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned ML0815502662008-05-20020 May 2008 Harris Slides, NRC Annual Assessment Meeting 2024-04-09
[Table view] |
Text
Maintenance Rule Scoping and Performance Criteria HNP F-BARR FIRE BARRIERS - PSEUDO SYSTEM System Within the Scope of 10CFR50.65 Program: FIRE PROTECTION Unit: 1
Description:
This is the Pseudo system to monitor fire barriers for NFPA-805. The Fire Barrier system includes those fire features or elements identified by the assumptions of the Fire risk analysis. SSCs monitored under the Fire Barriers system include walls, floors, ceilings, fire doors, fire dampers, penetration seals, fire wraps, structural steel fire proofing, and radiant energy shielding **NOTE - the scope of this system is currently undefined. The example monitoring listed within this performance monitoring group are for demonstration only.
Performance Monitoring Group Fire Barriers - Doors in Risk Significant areas / zones Significance:
Enter Value Basis: Included in this performance monitoring group are the doors that were determined to be risk significant based on the multi-compartment analysis of the Fire PRA. **NOTE - the scope of this system is currently undefined. The example monitoring listed within this performance monitoring group are for demonstration only.
Interval Criteria Monitoring Goal Basis Definition Start Date Type CONDITION N 0 0 Monitoring used is based on a review of plant operating The prevalent failure modes affecting the function of Condition Monitoring - Hours to LIMIT experience, industry operating experience, engineering the door is the failure of the door to seal or latch.
repair assumptions and expert panel recommendations. Fire doors Events included are any loss of door operability that in risk significant areas/zones should be repaired within xx requires timely corrective maintenance. To monitor Monitoring Type (choices are): hours in order to maintain the fire barrier function of protecting for this PMG, door unavailability will be tracked in the
- Unavailability SSCs important to Nuclear Safety *NOTE- Criteria and Out of Service log. Any Fire Door corrective monitoring intervals have been intentionally left at zero maintenance that that exceeds the limit of xx hours to
- Reliability Used for MR. because the monitoring scope and engineering assumptions repair wil exceed the criteria of this PMG. ARs will be have yet to be defined. This PMG is for demonstration only. initiated to track exceeded criteria in the corrective
- Condition Not used for action program.
- Plant Level NFPA 805 (Sum, Count, Hours, Limit, Inspection)
Monitoring 4/11/2008 Page 1
Performance Monitoring Group Fire Barriers - Not Risk Significant areas / zones Significance:
Basis: Included in this PMG are the non risk significant barriers monitored under NFPA 805. **NOTE -
the scope of this system is currently undefined. The example monitoring listed within this performance monitoring group are for demonstration only.
Interval Criteria Monitoring Goal Basis Definition Start Date Type CONDITION N 0 0 Monitoring used is based on a review of plant operating Any failure or degradation identified through visual Condition Monitoring - FPP013 INSPEC experience, industry operating experience, engineering inspection that does not meet the acceptance criteria assumptions and expert panel recommendations. Fire rated of FPP-013 . Any conidtions not meeting this criteria assemblies and sealing devices are monitored through the will be tracked in the corrective action program performance of FPP013. *NOTE- Criteria and monitoring intervals have been intentionally left at zero because the monitoring scope and engineering assumptions have yet to be defined. This PMG is for demonstration only.
4/11/2008 Page 2
Maintenance Rule Scoping and Performance Criteria HNP F-SUPR FIRE SUPRESSION - PSUEDO SYSTEM System Within the Scope of 10CFR50.65 Program: FIRE PROTECTION Unit: 1
Description:
Pseudo system for monitoring the fire safety significant and non significant fire supression systems for NFPA 805 **NOTE - the scope of this system is currently undefined. The example monitoring listed within this performance monitoring group are for demonstration only.
Performance Monitoring Group Fire Supression - Risk Significant Areas/Zone Significance:
Basis: This performance Monitoring group monitors fire supression SSCs located in fire Areas/zones considered risk significant. **NOTE - the scope of this system is currently undefined. The example monitoring listed within this performance monitoring group are for demonstration only.
Interval Criteria Monitoring Goal Basis Definition Start Date Type UNAVAILABILITY N 0 0 Monitoring used is based on a review of plant operating Fire Supression System HOURS experience, industry operating experience, engineering Unavailability assumptions and expert panel recommendations. Condition Monitoring is provided for Fire Suppression SSCs through routine surveillances performance under FPP-0013.
Unavailability monitoring of Fire Suppression systems, assumed as input to the FPRA non-suppression probability function (i.e. 3%), is provided through trending of high fire significant FP SSCs out of service time to ensure the assumption is met. Condition monitoring frequency remains as previously established under the surveillance program outlined in FPP-0013, and unavailability will be provided as equipment hours out of service time per year from data collected following issuance of the SER. *NOTE- Criteria and monitoring intervals have been intentionally left at zero because the monitoring scope and engineering assumptions have yet to be defined. This PMG is for demonstration only.
4/11/2008 Page 3
Performance Monitoring Group Fire Supression - all other Areas /Zones Significance:
Basis: Included in this Performance monitoring group are all the fire supression SSCs monitored in NFPA 805 that are not located in Risk significant areas/zones. **NOTE - the scope of this system is currently undefined. The example monitoring listed within this performance monitoring group are for demonstration only.
Interval Criteria Monitoring Goal Basis Definition Start Date Type CONDITION N 0 0 Monitoring used is based on a review of plant operating Failure to meet acceptance criteria of FPP-013 is Condition Monitoring INSPEC experience, industry operating experience, engineering tracked by this PMG. Any exceeded crtieria will assumptions and expert panel recommendations. Fire tracked under the corrective action program Supression SSCs are monitored routinely through the performance of FPP-013. *NOTE- Criteria and monitoring intervals have been intentionally left at zero because the monitoring scope and engineering assumptions have yet to be defined. This PMG is for demonstration only .